Document Name | Type | File Size | Date | Description |
---|
D-20004.PDF | Demonstrative | 353.10 KB | 2013-11-07 | Hayward Press Release |
D-20005.PDF | Demonstrative | 449.91 KB | 2013-11-07 | Deposition Excerpts of Secretary Steven Chu |
D-20006.PDF | Demonstrative | 444.80 KB | 2013-11-07 | Deposition Excerpts of Secretary Steven Chu |
D-20007.PDF | Demonstrative | 439.80 KB | 2013-11-07 | Deposition Excerpts of Mark Patteson |
D-20008.PDF | Demonstrative | 374.80 KB | 2013-11-07 | BP's Knowledge About Junk Shots Before Top Kill |
D-20012.PDF | Demonstrative | 446.03 KB | 2013-11-07 | BP's Analysis of Top Kill's Failure |
D-20013.PDF | Demonstrative | 459.59 KB | 2013-11-07 | Only Three Scenarios Presented by BP |
D-20014.PDF | Demonstrative | 435.42 KB | 2013-11-07 | Reasons Known by BP for Top Kill Failure |
D-20015.PDF | Demonstrative | 396.71 KB | 2013-11-07 | Deposition Transcript of Rear Admiral Kevin Cook |
D-20016.PDF | Demonstrative | 465.56 KB | 2013-11-07 | BOP-on-BOP Option Taken Off the Table as a Result of the Rupture Disk Misrepresentation |
D-20017.PDF | Demonstrative | 493.42 KB | 2013-11-07 | Capping Delayed as a Result of the Rupture Disk Misrepresentation |
D-20018.PDF | Demonstrative | 457.11 KB | 2013-11-07 | Deposition Excerpts of Pat Campbell |
D-20019.PDF | Demonstrative | 427.92 KB | 2013-11-07 | Deposition Excerpts of Pat Campbell |
D-20020.PDF | Demonstrative | 465.37 KB | 2013-11-07 | Phase 2 Expert Reports of Dr. Robert Bea |
D-20021.PDF | Demonstrative | 429.48 KB | 2013-11-07 | Consequences of blowout - Phase 2 |
D-20022.PDF | Demonstrative | 821.98 KB | 2013-11-07 | BP ALARP Requirements |
D-20023.PDF | Demonstrative | 1.25 MB | 2013-11-07 | Integrity Management Standard Risk Matrix |
D-20024.PDF | Demonstrative | 339.03 KB | 2013-11-07 | Graph: Risk Level v. Time |
D-20025.PDF | Demonstrative | 383.98 KB | 2013-11-07 | BP E&P DWOP 'requirements' for a SPECIFIC WELL CONTROL RESPONSE GUIDE |
D-20026.PDF | Demonstrative | 440.38 KB | 2013-11-07 | Joint Industry Blowout Control Report: DEA-63 (1991) |
D-20027.PDF | Demonstrative | 399.09 KB | 2013-11-07 | Joint Industry Blowout Control Report: DEA-63 (1991) |
D-20028.PDF | Demonstrative | 491.27 KB | 2013-11-07 | Joint Industry Blowout Control Report: DEA-63 (1991) |
D-20029.PDF | Demonstrative | 481.61 KB | 2013-11-07 | Joint Industry Blowout Control Report: DEA-63 (1991) |
D-20030.PDF | Demonstrative | 371.78 KB | 2013-11-07 | Joint Industry Blowout Control Report: DEA-63 (1991) |
D-20031.PDF | Demonstrative | 412.68 KB | 2013-11-07 | Joint Industry Blowout Control Report: DEA-63 (1991) |
D-20032.PDF | Demonstrative | 415.56 KB | 2013-11-07 | Joint Industry Blowout Control Report: DEA-63 (1991) |
D-20033.PDF | Demonstrative | 366.61 KB | 2013-11-07 | IADC Deepwater Well Control Guidelines (1998) |
D-20034.PDF | Demonstrative | 359.83 KB | 2013-11-07 | IADC Deepwater Well Control Guidelines (1998) |
D-20035.PDF | Demonstrative | 353.13 KB | 2013-11-07 | IADC Deepwater Well Control Guidelines (1998) |
D-20036.PDF | Demonstrative | 474.98 KB | 2013-11-07 | PCCI Final Report: Oil Spill Containment, Remote Sensing and Tracking for Deepwater Blowouts: Status of Existing and Emerging Technologies (1999) |
D-20037.PDF | Demonstrative | 424.59 KB | 2013-11-07 | BP Exploration (Endicott) Oil Discharge Prevention and Contingency Plan: Best Available Technology (2001) |
D-20038.PDF | Demonstrative | 360.46 KB | 2013-11-07 | SPE/IADC DRILLING CONFERENCE (2003) |
D-20039.PDF | Demonstrative | 480.10 KB | 2013-11-07 | SPE/IADC 92626: Modeling Ultra-Deepwater Blowouts and Dynamic Kills and the Resulting Blowout Control Best Practices Recommendations (2005) |
D-20040.PDF | Demonstrative | 374.77 KB | 2013-11-07 | Drilling Contractor (2005) |
D-20041.PDF | Demonstrative | 439.86 KB | 2013-11-07 | 2008 International Oil Spill Conference: Assessment of Oil Spill Response Capabilities: A Proposed International Guide for Oil Spill Response Planning and Readiness Assessments |
D-20042.PDF | Demonstrative | 452.39 KB | 2013-11-07 | Oil Spill Response Plan |
D-20043.PDF | Demonstrative | 430.40 KB | 2013-11-07 | BP Oil Spill Response Plan, Section 6(c) |
D-20044.PDF | Demonstrative | 398.73 KB | 2013-11-07 | Deposition Transcript of Earnest Bush: OSRP =/= Source Control Plan |
D-20045.PDF | Demonstrative | 437.29 KB | 2013-11-07 | BP's Top Management Knew It Had No Source Control Plan |
D-20046.PDF | Demonstrative | 373.78 KB | 2013-11-07 | Deposition Transcript of Lars Herbst: BP required to Abate Source Immediately |
D-20047.PDF | Demonstrative | 386.74 KB | 2013-11-07 | Macondo Initial Exploration Plan (2009) |
D-20048.PDF | Demonstrative | 384.18 KB | 2013-11-07 | Deposition Transcript of Lars Herbst: BP Not Prepared to Respond to Macondo |
D-20049.PDF | Demonstrative | 496.53 KB | 2013-11-07 | BOPs are Blowout Preventers, Not Blowout Stoppers |
D-20050.PDF | Demonstrative | 349.12 KB | 2013-11-07 | ROV Intervention Will Not Stop a Flowing Well |
D-20051.PDF | Demonstrative | 355.34 KB | 2013-11-07 | West Engineering Services, Inc: Evaluation of Secondary Intervention Methods in Well Control (2003) |
D-20052.PDF | Demonstrative | 345.88 KB | 2013-11-07 | Deposition Transcript of Richard Morrison: No Deepwater Blowout Source Control Drills |
D-20053.PDF | Demonstrative | 404.73 KB | 2013-11-07 | Deposition Transcript of James Wellings: No Deepwater Blowout Source Control Training |
D-20054.PDF | Demonstrative | 416.76 KB | 2013-11-07 | Deposition Transcript of Andrew Frazelle: No Deepwater Blowout Source Control Training |
D-20055.PDF | Demonstrative | 436.70 KB | 2013-11-07 | Deposition Transcript of Richard Harland: No Deepwater Blowout Source Control Training |
D-20056.PDF | Demonstrative | 366.55 KB | 2013-11-07 | Deposition Transcript of Earnest Bush: No Deepwater Blowout Source Control Training |
D-20057.PDF | Demonstrative | 592.47 KB | 2013-11-07 | Zero Dollars Spent on Source Control Research, Development and Technology |
D-20058.PDF | Demonstrative | 381.94 KB | 2013-11-07 | Deposition Transcript of Andy Inglis: Zero Dollars Spent on Source Control |
D-20059.PDF | Demonstrative | 370.09 KB | 2013-11-07 | Deposition Transcript of James Rohloff: Zero Dollars Spent on Source Control |
D-20070.PDF | Demonstrative | 425.45 KB | 2013-11-07 | Reasons Known by BP for Top Kill Failure - Mark Mazzella Testimony |
D-20071.PDF | Demonstrative | 366.26 KB | 2013-11-07 | Reasons Known by BP for Top Kill Failure - David Barnett Testimony |
D-20072.PDF | Demonstrative | 389.64 KB | 2013-11-07 | No Mud Enters the Wellbore |
D-20073.PDF | Demonstrative | 364.48 KB | 2013-11-07 | Hydrocarbons Up the Casing |
D-20074.PDF | Demonstrative | 409.32 KB | 2013-11-07 | Deposition Excerpts of Lars Herbst |
D-20075.PDF | Demonstrative | 363.83 KB | 2013-11-07 | BP's Analysis of Top Kill's Failure |
D-21006.2.PDF | Demonstrative | 203.04 KB | 2013-11-07 | Top Hat Flow |
D-21011.2.PDF | Demonstrative | 266.48 KB | 2013-11-07 | Model of Capping Stack |
D-21023.PDF | Demonstrative | 1.78 MB | 2013-11-07 | Conversion of Reservoir Barrels to Stock Tank Barrels using Zick EOS |
D-21100.1.PDF | Demonstrative | 262.66 KB | 2013-11-07 | Capping Stack |
D-21101.PDF | Demonstrative | 267.93 KB | 2013-11-07 | Measuring Flow Standard Mechanical Engineering Calculation |
D-21102.PDF | Demonstrative | 324.96 KB | 2013-11-07 | Method 1: Standard Method for Flow Estimation |
D-21103.PDF | Demonstrative | 330.36 KB | 2013-11-07 | Method 2: Standard Method for Flow Estimation |
D-21104.PDF | Demonstrative | 294.94 KB | 2013-11-07 | Method 3 (or Alternate Method")" |
D-21105.PDF | Demonstrative | 262.73 KB | 2013-11-07 | Method 3 or Alternate Method" |
D-21106.PDF | Demonstrative | 305.40 KB | 2013-11-07 | Consistency for Capping Stack Period |
D-21109.PDF | Demonstrative | 332.38 KB | 2013-11-07 | Top Hat Flow Lower Limit |
D-21110.PDF | Demonstrative | 280.85 KB | 2013-11-07 | Top Hat Flow Best Estimate |
D-21117.PDF | Demonstrative | 342.58 KB | 2013-11-07 | Top Kill Time Period (Lower Bound) |
D-21118.PDF | Demonstrative | 305.50 KB | 2013-11-07 | Top Kill Time Period (Best Estimate) |
D-21119.PDF | Demonstrative | 356.53 KB | 2013-11-07 | Integrate Flow Over 86 Days |
D-21122.PDF | Demonstrative | 235.34 KB | 2013-11-07 | Dykhuizen: 3 Flow Rate Calculations |
D-21123.PDF | Demonstrative | 377.23 KB | 2013-11-07 | BP's July 2010 Capping Stack Calculations |
D-21124.PDF | Demonstrative | 253.04 KB | 2013-11-07 | Zaldivar Model Not Validated to Estimate Flow Rates |
D-21125.PDF | Demonstrative | 245.68 KB | 2013-11-07 | Zaldivar Instability Modes |
D-21140.PDF | Demonstrative | 316.07 KB | 2013-11-07 | Dykhuizen Education |
D-21141.PDF | Demonstrative | 268.88 KB | 2013-11-07 | Dykhuizen Professional Background |
D-21142.PDF | Demonstrative | 345.94 KB | 2013-11-07 | Dykhuizen Relevant Experience |
D-21143.PDF | Demonstrative | 365.94 KB | 2013-11-07 | Summary of Expert Opinions |
D-21145.PDF | Demonstrative | 279.70 KB | 2013-11-07 | Overview of Dykhuizen Expert Testimony |
D-21160.PDF | Demonstrative | 485.38 KB | 2013-11-07 | D23996A with handwritten notes, as marked up on ELMO in Court by US |
D-21161.PDF | Demonstrative | 254.65 KB | 2013-11-07 | Imperial College London |
D-21162.PDF | Demonstrative | 230.30 KB | 2013-11-07 | Imperial College London |
D-21163.PDF | Demonstrative | 249.53 KB | 2013-11-07 | Experts Relied on by Blunt |
D-21165.PDF | Demonstrative | 233.59 KB | 2013-11-07 | Analyses Not Independent |
D-21205.PDF | Demonstrative | 376.28 KB | 2013-11-07 | Overview of Work and Testimony |
D-21207.PDF | Demonstrative | 381.48 KB | 2013-11-07 | Experience at Sandia National Laboratories |
D-21210.PDF | Demonstrative | 394.37 KB | 2013-11-07 | Overview of Methodology |
D-21211.PDF | Demonstrative | 351.14 KB | 2013-11-07 | Relationship between Pressure Drop and Flow Rate |
D-21212.PDF | Demonstrative | 330.16 KB | 2013-11-07 | Discharge Coefficients (k) and Producitivty Index (K) |
D-21213.PDF | Demonstrative | 306.41 KB | 2013-11-07 | Using Pressures from the Bottom of the BOP |
D-21214.PDF | Demonstrative | 238.70 KB | 2013-11-07 | Pressures Used in Best Estimate Calculation |
D-21215.PDF | Demonstrative | 343.61 KB | 2013-11-07 | Flow Rates and Cumulative Discharge |
D-21216.PDF | Demonstrative | 384.39 KB | 2013-11-07 | Strengths of Methodology |
D-21217.PDF | Demonstrative | 421.65 KB | 2013-11-07 | Validation of Methodology, Model and Results |
D-21218.PDF | Demonstrative | 366.42 KB | 2013-11-07 | Comparison between Calculated and Measured Pressure |
D-21219.PDF | Demonstrative | 338.37 KB | 2013-11-07 | Comparison with Industry Standard" Model" |
D-21221.PDF | Demonstrative | 325.46 KB | 2013-11-07 | Best Estimate Calculation |
D-21222.PDF | Demonstrative | 340.15 KB | 2013-11-07 | Alternate 1 Calculation |
D-21223.PDF | Demonstrative | 355.43 KB | 2013-11-07 | Alternate 2 Calculation |
D-21224.PDF | Demonstrative | 408.98 KB | 2013-11-07 | Quantification of Uncertainties |
D-21225.PDF | Demonstrative | 297.53 KB | 2013-11-07 | BP/Anadarko Criticisms |
D-21226.PDF | Demonstrative | 397.31 KB | 2013-11-07 | Continuing Erosion in the BOP, Wellbore and Reservoir Did Not Significantly Affect Cumulative Discharge |
D-21227.PDF | Demonstrative | 357.96 KB | 2013-11-07 | Evidence of Rapid Erosion at Upper Annular |
D-21228.PDF | Demonstrative | 395.53 KB | 2013-11-07 | Phase One Evidence Confirms that Erosion Happened within Minutes |
D-21229.PDF | Demonstrative | 279.18 KB | 2013-11-07 | Erosion of Blind Shear Rams |
D-21230.PDF | Demonstrative | 290.65 KB | 2013-11-07 | BOP Pressures Before May 8 |
D-21231.PDF | Demonstrative | 285.99 KB | 2013-11-07 | Hypothetical PI Trends |
D-21235.PDF | Demonstrative | 287.79 KB | 2013-11-07 | Comparison with Industry Standard Model |
D-21253.PDF | Demonstrative | 395.84 KB | 2013-11-07 | Continuing Erosion Did Not Affect Flow Rate: Dr. Nesic's Modeling Provides No Insight into History of Erosion or Its Impact on Flow Rates |
D-21255.PDF | Demonstrative | 224.03 KB | 2013-11-07 | Griffiths Reports |
D-21266.PDF | Demonstrative | 266.06 KB | 2013-11-07 | Johnson Maximus Model: Drill Pipe In Production Casing |
D-21267.PDF | Demonstrative | 222.26 KB | 2013-11-07 | Dykhuizen Top Hat Estimate 60,000 BOPD |
D-21272.PDF | Demonstrative | 339.13 KB | 2013-11-07 | True Geometry vs. Johnson's Maximus Model |
D-21301.PDF | Demonstrative | 330.43 KB | 2013-11-07 | Paul Hsieh Response Activities |
D-21305.PDF | Demonstrative | 298.43 KB | 2013-11-07 | Education and Employment |
D-21306.PDF | Demonstrative | 322.30 KB | 2013-11-07 | Summary of Experience |
D-21307.PDF | Demonstrative | 303.21 KB | 2013-11-07 | Publications and Recognitions |
D-21309.PDF | Demonstrative | 276.04 KB | 2013-11-07 | Key Opinions in Rebuttal to Dr. Zimmerman |
D-21310.PDF | Demonstrative | 273.00 KB | 2013-11-07 | Key Opinion # 1 |
D-21311.1.PDF | Demonstrative | 408.36 KB | 2013-11-07 | Weatherford's flawed testing procedure |
D-21311.2.PDF | Demonstrative | 310.37 KB | 2013-11-07 | Weatherford's flawed testing procedure |
D-21311.3.PDF | Demonstrative | 315.55 KB | 2013-11-07 | Weatherford's flawed testing procedure |
D-21311.4.PDF | Demonstrative | 326.40 KB | 2013-11-07 | Weatherford's flawed testing procedure |
D-21311.5.PDF | Demonstrative | 329.49 KB | 2013-11-07 | Weatherford's flawed testing procedure |
D-21312.PDF | Demonstrative | 271.51 KB | 2013-11-07 | Key Opinion # 2 |
D-21400.1.PDF | Demonstrative | 270.95 KB | 2013-11-07 | Dr. Alan Huffman: Background |
D-21400.5.PDF | Demonstrative | 285.31 KB | 2013-11-07 | 1. Weatherford test results relied on by Drs. Zimmerman and Blunt are not reliable and are underpredictive |
D-21500.PDF | Demonstrative | 248.79 KB | 2013-11-07 | Government-Led Science Team Organization |
D-21600.PDF | Demonstrative | 321.86 KB | 2013-11-07 | BP's Decision to Use 12 Microsips as Most Likely" Pore Volume Compressibility" |
D-21601.zip | Demonstrative | 3.19 MB | 2013-11-07 | Animation |
D-21651.PDF | Demonstrative | 413.49 KB | 2013-11-07 | Dr. Mohan Kelkar - Professional Qualifications |
D-21652.PDF | Demonstrative | 362.12 KB | 2013-11-07 | Dr. Mohan Kelkar - Selected Professional Honors |
D-21653.PDF | Demonstrative | 335.79 KB | 2013-11-07 | Summary of Opinions |
D-21654.PDF | Demonstrative | 331.42 KB | 2013-11-07 | Material Balance Analysis |
D-21656.PDF | Demonstrative | 279.54 KB | 2013-11-07 | Material Balance Equation |
D-21657.PDF | Demonstrative | 343.88 KB | 2013-11-07 | Material Balance Analysis - Inputs |
D-21658.PDF | Demonstrative | 352.19 KB | 2013-11-07 | Material Balance Analysis - Original Oil in Place |
D-21659.PDF | Demonstrative | 304.10 KB | 2013-11-07 | Dr. Blunt's Original Oil in Place Analysis |
D-21660.PDF | Demonstrative | 396.84 KB | 2013-11-07 | Dr. Blunt's Original Oil in Place Analysis is Faulty |
D-21661.PDF | Demonstrative | 344.80 KB | 2013-11-07 | Material Balance Analysis - Compressibility |
D-21663.PDF | Demonstrative | 348.77 KB | 2013-11-07 | Dr. Blunt's Ignores Uncertainty in Compressibility Value |
D-21664.PDF | Demonstrative | 384.97 KB | 2013-11-07 | Material Balance Analysis - Pressure Drop |
D-21665.PDF | Demonstrative | 356.86 KB | 2013-11-07 | Dr. Blunt's Final Reservoir Pressure is Incorrect |
D-21666.PDF | Demonstrative | 263.10 KB | 2013-11-07 | Comparison of Kelkar, Gringarten, Blunt Final Reservoir Pressures |
D-21668.PDF | Demonstrative | 365.77 KB | 2013-11-07 | Material Balance Analysis - Cumulative Oil Released |
D-21669.PDF | Demonstrative | 401.45 KB | 2013-11-07 | Material Balance Analysis - Sensitivities |
D-21670.PDF | Demonstrative | 335.79 KB | 2013-11-07 | Material Balance Analysis - Sensitivities |
D-21671.PDF | Demonstrative | 390.74 KB | 2013-11-07 | Material Balance Analysis - Pros and Cons |
D-21672.PDF | Demonstrative | 373.90 KB | 2013-11-07 | Final Day Flow Rate Calculation |
D-21675.PDF | Demonstrative | 365.61 KB | 2013-11-07 | Criticisms of Dr. Gringarten - Convolution Analysis |
D-21676.PDF | Demonstrative | 321.86 KB | 2013-11-07 | Criticisms of Dr. Gringarten - Convolution Analysis |
D-21678.PDF | Demonstrative | 337.24 KB | 2013-11-07 | Summary of Opinions |
D-21701.PDF | Demonstrative | 286.18 KB | 2013-11-07 | Dr. Larsen's Well Test Analysis Background |
D-21702.PDF | Demonstrative | 276.38 KB | 2013-11-07 | Summary of Results |
D-21703.PDF | Demonstrative | 289.25 KB | 2013-11-07 | Dr. Larsen's Methodology |
D-21705.PDF | Demonstrative | 311.99 KB | 2013-11-07 | Step Two: Select Buildups |
D-21708.PDF | Demonstrative | 266.83 KB | 2013-11-07 | Step 3: Log-Log Plot to Get Initial Permeability Estimate |
D-21709.PDF | Demonstrative | 297.74 KB | 2013-11-07 | Wellbore Model |
D-21710.PDF | Demonstrative | 253.29 KB | 2013-11-07 | Step 3: Log-Log Plot to Get Initial Permeability Estimate |
D-21711.PDF | Demonstrative | 271.62 KB | 2013-11-07 | Step 4: Semi-log Plots to Find Best Match of Permeability: High-Rate Buildup 4 from M56D Layer |
D-21713.PDF | Demonstrative | 225.44 KB | 2013-11-07 | Dr. Gringarten's Match" to Data" |
D-21714.PDF | Demonstrative | 276.34 KB | 2013-11-07 | Comparison of Estimates for Buildup 4 for the M56D Layer |
D-21770.PDF | Demonstrative | 330.83 KB | 2013-11-07 | Comparison of BOP Datum Pressure from PTB and PT3K2 with Linearly Interpolated Pressures [with Handwritten Notes] |
D-21781.PDF | Demonstrative | 230.94 KB | 2013-11-07 | Demonstrative Slide |
D-21783.PDF | Demonstrative | 251.49 KB | 2013-11-07 | Direct Numeric Inputs into Gringarten's Analysis |
D-21810.PDF | Demonstrative | 369.53 KB | 2013-11-07 | Professional Background |
D-21811.PDF | Demonstrative | 315.87 KB | 2013-11-07 | Roadmap |
D-21812.PDF | Demonstrative | 357.01 KB | 2013-11-07 | Overview |
D-21815.PDF | Demonstrative | 317.83 KB | 2013-11-07 | Roadmap |
D-21818.PDF | Demonstrative | 358.40 KB | 2013-11-07 | Collection Rates |
D-21825.PDF | Demonstrative | 329.33 KB | 2013-11-07 | Analytical Method |
D-21826.PDF | Demonstrative | 295.55 KB | 2013-11-07 | Roadmap |
D-21829.PDF | Demonstrative | 262.05 KB | 2013-11-07 | Example of Tubing Performance (TPC) and Inflow Performance Relation (IPR) Curves |
D-21830.PDF | Demonstrative | 319.38 KB | 2013-11-07 | Reservoir: Inflow Performance Relation (IPR) Curves |
D-21831.PDF | Demonstrative | 319.19 KB | 2013-11-07 | Wellbore & BOP: Tubing Performance Curve (TPC) |
D-21832.PDF | Demonstrative | 319.39 KB | 2013-11-07 | Total of 25 Cases |
D-21833.PDF | Demonstrative | 309.46 KB | 2013-11-07 | Permeability from Core |
D-21834.PDF | Demonstrative | 245.12 KB | 2013-11-07 | Permeability from MDT |
D-21836.PDF | Demonstrative | 309.30 KB | 2013-11-07 | Roadmap |
D-21837.PDF | Demonstrative | 275.48 KB | 2013-11-07 | Numerical Method |
D-21838.PDF | Demonstrative | 333.41 KB | 2013-11-07 | Numerical Method |
D-21839A.PDF | Demonstrative | 371.89 KB | 2013-11-07 | History Matching of Shut-in Pressures |
D-21840A.PDF | Demonstrative | 409.77 KB | 2013-11-07 | History Matching of Shut-in Pressures |
D-21841.PDF | Demonstrative | 296.24 KB | 2013-11-07 | Checking Against Collection Rates |
D-21842.PDF | Demonstrative | 296.51 KB | 2013-11-07 | Checking Against Collection Rates |
D-21843.PDF | Demonstrative | 428.46 KB | 2013-11-07 | Results (Table) |
D-21847.PDF | Demonstrative | 277.80 KB | 2013-11-07 | Roadmap |
D-21848A.PDF | Demonstrative | 344.37 KB | 2013-11-07 | What-if (BOP) Cases |
D-21849.PDF | Demonstrative | 310.26 KB | 2013-11-07 | Roadmap |
D-21850.PDF | Demonstrative | 313.70 KB | 2013-11-07 | Rebuttal Cases |
D-21851.PDF | Demonstrative | 307.25 KB | 2013-11-07 | Rebuttal Cases |
D-21852A.PDF | Demonstrative | 355.42 KB | 2013-11-07 | Johnson Model Irregularities |
D-21854.PDF | Demonstrative | 323.77 KB | 2013-11-07 | Rebuttal Cases |
D-21856.PDF | Demonstrative | 304.44 KB | 2013-11-07 | Criticism of Dr. Blunt's Report |
D-21857.PDF | Demonstrative | 354.66 KB | 2013-11-07 | Criticism of Dr. Gringarten's Report |
D-22001.PDF | Demonstrative | 339.65 KB | 2013-11-07 | Background and Expertise |
D-22002.PDF | Demonstrative | 332.27 KB | 2013-11-07 | Summary of Opinions |
D-22003.PDF | Demonstrative | 314.09 KB | 2013-11-07 | Methodology |
D-22004.PDF | Demonstrative | 285.89 KB | 2013-11-07 | Conversion of Reservoir Barrels to Stock Tank Barrels |
D-22005.PDF | Demonstrative | 294.19 KB | 2013-11-07 | Conversion of Reservoir Barrels to Stock Tank Barrels |
D-22006.PDF | Demonstrative | 264.45 KB | 2013-11-07 | BP Contractor Labs: Pencor, Schlumberger, and Intertek |
D-22007.PDF | Demonstrative | 295.83 KB | 2013-11-07 | Zick Multi-Stage Separator Conditions |
D-22008.PDF | Demonstrative | 236.85 KB | 2013-11-07 | Oceanic Separation Process |
D-22009.PDF | Demonstrative | 227.42 KB | 2013-11-07 | Dr. Whitson's Opinion Regarding Shrinkage Factor |
D-22013.PDF | Demonstrative | 268.51 KB | 2013-11-07 | Summary of Conversion Factors |
D-22201.PDF | Demonstrative | 198.96 KB | 2013-11-07 | Mass Flow Rate (Formula) |
D-22202.1.ppsx | Demonstrative | 801.63 KB | 2013-11-07 | Whole Core Spring Analogy |
D-22202.2.ppsx | Demonstrative | 801.67 KB | 2013-11-07 | Rotary Sidewall Spring Analogy |
D-22202.3.ppsx | Demonstrative | 23.03 MB | 2013-11-07 | Whole Core |
D-22202.4.ppsx | Demonstrative | 15.30 MB | 2013-11-07 | Rotary Sidewall |
D-22205.PDF | Demonstrative | 679.88 KB | 2013-11-07 | Flow Area |
D-22210.PDF | Demonstrative | 475.37 KB | 2013-11-07 | Hydraulic Diameter for Annular Flow |
D-22485.PDF | Demonstrative | 6.00 KB | 2013-11-07 | Water Tank Drawing with 1 Square and Hole (ELMO)" |
D-22486.PDF | Demonstrative | 6.52 KB | 2013-11-07 | Water Tank Drawing with 1 Square and Multiple Holes (ELMO)" |
D-22487.PDF | Demonstrative | 5.27 KB | 2013-11-07 | Water Tank Drawing with Connecting Holes (ELMO) |
D-22800.PDF | Demonstrative | 260.07 KB | 2013-11-07 | Dr. Nesic's Simplified" Transient Geometries" |
D-22801.PDF | Demonstrative | 268.58 KB | 2013-11-07 | Explosion of Transient Model |
D-22802.PDF | Demonstrative | 234.83 KB | 2013-11-07 | Blind Shear Ram Transient Modeling Results |
D-22803.PDF | Demonstrative | 267.43 KB | 2013-11-07 | Blind Shear Ram Transient Modeling - Linear Fits |
D-22804.PDF | Demonstrative | 266.97 KB | 2013-11-07 | Blind Shear Ram Transient Modeling - Pressure Drop Comparison |
D-22805.PDF | Demonstrative | 257.61 KB | 2013-11-07 | Linear Trend" |
D-22806.PDF | Demonstrative | 245.60 KB | 2013-11-07 | Linear v. Exponential Fit to BSR Data |
D-22818.PDF | Demonstrative | 324.28 KB | 2013-11-07 | Fluid Properties: Density |
D-22820.PDF | Demonstrative | 229.37 KB | 2013-11-07 | BSR Hard" Numbers" |
D-22833.PDF | Demonstrative | 328.12 KB | 2013-11-07 | Johnson PI and Pressure Hypotheses |
D-22838.PDF | Demonstrative | 266.59 KB | 2013-11-07 | Photographs: Non-Macondo sandstone core samples |
D-23207B.PDF | Demonstrative | 387.75 KB | 2013-11-07 | Examples of Uncertainties Associated with Hydraulic Modeling Inputs at Macondo |
D-23208.PDF | Demonstrative | 296.33 KB | 2013-11-07 | Purposes of Hydraulic Modeling Performed in April and May 2010 |
D-23209.PDF | Demonstrative | 400.27 KB | 2013-11-07 | Mason's Modeling Indicated That Under Reasonable Conditions, The Flow Rate Could Be 5,000 bopd |
D-23212.PDF | Demonstrative | 322.67 KB | 2013-11-07 | Adam L. Ballard, Ph.D. |
D-23213.PDF | Demonstrative | 372.10 KB | 2013-11-07 | Adam L. Ballard, Ph.D. |
D-23214.PDF | Demonstrative | 350.27 KB | 2013-11-07 | Dr. Adam Ballard: Summary of Opinions |
D-23215.PDF | Demonstrative | 363.44 KB | 2013-11-07 | James Dupree (COO of Resource Development & Technology) |
D-23231A.PDF | Demonstrative | 490.92 KB | 2013-11-07 | Source Control Operations Progressed on Parallel Tracks |
D-23238.PDF | Demonstrative | 299.79 KB | 2013-11-07 | Government Did Not Rely on BP for Flow Rate Estimates |
D-23247A.PDF | Demonstrative | 857.46 KB | 2013-11-07 | Unknown Wellbore Variables Created Uncertainty (Bottom Kill Broach Risk) |
D-23249.PDF | Demonstrative | 2.23 MB | 2013-11-07 | Potential Instability of the DWH's Listing BOP |
D-23250.PDF | Demonstrative | 3.23 MB | 2013-11-07 | Deepwater Horizon Source Control Response Teams |
D-23272A.PDF | Demonstrative | 289.05 KB | 2013-11-07 | Deepwater Horizon Stack |
D-23274A.PDF | Demonstrative | 279.69 KB | 2013-11-07 | Flex Joint Flange - Riser Cut on June 3rd |
D-23275.PDF | Demonstrative | 325.51 KB | 2013-11-07 | Capping Stack Connection Challenges at Flex Joint |
D-23276.PDF | Demonstrative | 333.55 KB | 2013-11-07 | Capping Stack - General Challenges |
D-23277.PDF | Demonstrative | 1.32 MB | 2013-11-07 | Capping Stack Connection Options (Flex Joint) |
D-23320.PDF | Demonstrative | 345.13 KB | 2013-11-07 | Mark Mazzella: BP Segment Engineering Technical Authority - Well Control (2008-2011) |
D-23321.PDF | Demonstrative | 1.31 MB | 2013-11-07 | Mark Mazzella (Global Well Control Experience) |
D-23322.PDF | Demonstrative | 319.17 KB | 2013-11-07 | Goals of BP's Well Control Response Guide |
D-23323.PDF | Demonstrative | 319.90 KB | 2013-11-07 | BP Well Control Response Guide Included Rig-Specific Appendices |
D-23325.PDF | Demonstrative | 409.26 KB | 2013-11-07 | BP-Wild Well Control Master Services Agreement (Contract No. BPM-04-00806) |
D-23326A.PDF | Demonstrative | 342.42 KB | 2013-11-07 | Master Services Agreement Listed Well Control Personnel and Equipment |
D-23328.PDF | Demonstrative | 348.84 KB | 2013-11-07 | Planning and Implementing Source Control |
D-23334.PDF | Demonstrative | 312.71 KB | 2013-11-07 | Top Kill |
D-23394A.PDF | Demonstrative | 267.90 KB | 2013-11-07 | Hydraulic Model of Macondo Well System in Maximus: Productivity Index |
D-23396A.wmv | Demonstrative | 41.22 MB | 2013-11-07 | Multiphase Flow in Dual Flow Paths |
D-23398.PDF | Demonstrative | 316.69 KB | 2013-11-07 | Demonstrative animation - This is All Necessary to Accurately Determine Flow Rate Over Time |
D-23400.zip | Demonstrative | 2.95 MB | 2013-11-07 | This is All Necessary to Accurately Determine Flow Rate Over Time |
D-23401.PDF | Demonstrative | 272.13 KB | 2013-11-07 | Dr. Griffiths's Constant Discharge Coefficients |
D-23410.PDF | Demonstrative | 298.88 KB | 2013-11-07 | Macondo System is Not Constant Over Time: Junk Shot Material in BOP and Drillpipe |
D-23411.PDF | Demonstrative | 321.53 KB | 2013-11-07 | Macondo System is Not Constant Over Time: Piece of VBR/Test Ram Lodged Above Junk Shot Material |
D-23468.PDF | Demonstrative | 236.31 KB | 2013-11-07 | Multiphase Flow Patterns in Horizontal Pipes |
D-23470.wmv | Demonstrative | 49.26 MB | 2013-11-07 | Slug Flow from Riser End |
D-23478A.PDF | Demonstrative | 1.03 MB | 2013-11-07 | Holes in Kink Section |
D-23479A.PDF | Demonstrative | 1.07 MB | 2013-11-07 | Kink Leaks: May 13-20 |
D-23480-3.PDF | Demonstrative | 285.05 KB | 2013-11-07 | Schematic of No Kink Model |
D-23480-4.PDF | Demonstrative | 307.94 KB | 2013-11-07 | Schematic of No Kink Model |
D-23481.PDF | Demonstrative | 253.50 KB | 2013-11-07 | Schematic of Kink Model |
D-23481-3.PDF | Demonstrative | 285.25 KB | 2013-11-07 | Schematic of No Kink Model |
D-23482.PDF | Demonstrative | 304.41 KB | 2013-11-07 | Riser Elevation Profile Diagram (Smoothed) |
D-23484.PDF | Demonstrative | 228.05 KB | 2013-11-07 | Annular Flow |
D-23500.PDF | Demonstrative | 260.51 KB | 2013-11-07 | Dr. Martin Blunt Reservoir Analysis |
D-23501.PDF | Demonstrative | 306.87 KB | 2013-11-07 | Dr. Blunt's Early Industry Experience |
D-23502.PDF | Demonstrative | 328.38 KB | 2013-11-07 | Stanford University |
D-23503.PDF | Demonstrative | 305.75 KB | 2013-11-07 | Imperial College, London |
D-23504.PDF | Demonstrative | 313.97 KB | 2013-11-07 | Industry Applications of Research |
D-23505.PDF | Demonstrative | 325.75 KB | 2013-11-07 | Additional Industry Experience |
D-23506.PDF | Demonstrative | 312.00 KB | 2013-11-07 | Industry Recognition |
D-23507.PDF | Demonstrative | 293.02 KB | 2013-11-07 | Dr. Blunt's Report |
D-23508.PDF | Demonstrative | 292.94 KB | 2013-11-07 | Dr. Blunt's Conclusions |
D-23509.PDF | Demonstrative | 250.47 KB | 2013-11-07 | Graphic |
D-23510A.WMV | Demonstrative | 2.98 MB | 2013-11-07 | Demonstrative Animation |
D-23511A.WMV | Demonstrative | 2.58 MB | 2013-11-07 | Material Balance Analogy |
D-23513.PDF | Demonstrative | 229.92 KB | 2013-11-07 | Material Balance Equation |
D-23514.PDF | Demonstrative | 255.01 KB | 2013-11-07 | Points of Agreement and Dispute |
D-23515.PDF | Demonstrative | 260.46 KB | 2013-11-07 | First Variable: Connected Oil Volume |
D-23516.PDF | Demonstrative | 219.74 KB | 2013-11-07 | Material Balance Equation |
D-23518.PDF | Demonstrative | 324.82 KB | 2013-11-07 | Seismic and Geological Data |
D-23520.PDF | Demonstrative | 291.86 KB | 2013-11-07 | BP's 3 Well Plan |
D-23521.PDF | Demonstrative | 404.54 KB | 2013-11-07 | Conclusions re Macondo's Geology: Limited Connectivity Between Channels |
D-23522.PDF | Demonstrative | 349.78 KB | 2013-11-07 | Calculating Connectivity Using Pressure Analysis |
D-23523.wmv | Demonstrative | 11.95 MB | 2013-11-07 | Calculating Connectivity Using Pressure Analysis |
D-23523-1A.wmv | Demonstrative | 7.16 MB | 2013-11-07 | Demonstrative Animation |
D-23524.PDF | Demonstrative | 286.51 KB | 2013-11-07 | Calculating Connectivity Using Pressure Analysis |
D-23525.PDF | Demonstrative | 287.11 KB | 2013-11-07 | Calculating Connectivity Using Pressure Analysis |
D-23529.PDF | Demonstrative | 236.67 KB | 2013-11-07 | Converting Reservoir Volume to Surface Oil |
D-23532.PDF | Demonstrative | 337.21 KB | 2013-11-07 | Connected Oil Volume |
D-23533.PDF | Demonstrative | 247.34 KB | 2013-11-07 | What Difference Does Connected Oil Volume Make? |
D-23535.PDF | Demonstrative | 223.56 KB | 2013-11-07 | Material Balance Equation |
D-23536A.PDF | Demonstrative | 1.17 MB | 2013-11-07 | Reservoir Analysis: Reservoir Properties |
D-23537.PDF | Demonstrative | 267.30 KB | 2013-11-07 | Pressure and Compressibility: Flow Drivers |
D-23538.PDF | Demonstrative | 264.30 KB | 2013-11-07 | Pressure and Compressibility: Flow Drivers |
D-23539.PDF | Demonstrative | 264.87 KB | 2013-11-07 | Pressure and Compressibility: Flow Drivers |
D-23540.PDF | Demonstrative | 239.36 KB | 2013-11-07 | Rock Compressibility is the Issue |
D-23541.PDF | Demonstrative | 300.46 KB | 2013-11-07 | Measured Value is 6 microsips |
D-23541B.PDF | Demonstrative | 345.95 KB | 2013-11-07 | Measured Value is 6 microsips [D-23541 with Handwritten Notes] |
D-23544.PDF | Demonstrative | 325.61 KB | 2013-11-07 | Data Confirms 6 microsips |
D-23545.PDF | Demonstrative | 241.15 KB | 2013-11-07 | Pre-Drill Analysis Predicted 6 microsips |
D-23547.PDF | Demonstrative | 227.79 KB | 2013-11-07 | What Difference Does Compressibility Make? |
D-23548.PDF | Demonstrative | 373.40 KB | 2013-11-07 | Consistency Check |
D-23550.PDF | Demonstrative | 219.58 KB | 2013-11-07 | Material Balance Equation |
D-23551.PDF | Demonstrative | 238.12 KB | 2013-11-07 | Third Variable, ?P, Pressure Drop |
D-23552.wmv | Demonstrative | 1.57 MB | 2013-11-07 | Photograph - 3rd Variable: ?P |
D-23552-1A.wmv | Demonstrative | 1.04 MB | 2013-11-07 | Demonstrative Animation |
D-23553.wmv | Demonstrative | 11.72 MB | 2013-11-07 | Graphic - 3rd Variable: ?P |
D-23553-1A.wmv | Demonstrative | 8.58 MB | 2013-11-07 | Demonstrative Animation |
D-23554.PDF | Demonstrative | 255.17 KB | 2013-11-07 | Initial Reservoir Pressure: April 12 / Capping Stack Pressures: July 15 to Aug 3 |
D-23555.PDF | Demonstrative | 233.76 KB | 2013-11-07 | Build-Up of Pressure after Well Shut-in |
D-23556.PDF | Demonstrative | 246.88 KB | 2013-11-07 | Distance Between Capping Stack and Reservoir |
D-23557.PDF | Demonstrative | 244.32 KB | 2013-11-07 | Capping Stack Pressure at Shut-in: July 15 |
D-23558.PDF | Demonstrative | 257.08 KB | 2013-11-07 | The Second Law of Thermodynamics: Hot Things Cool Down |
D-23559.PDF | Demonstrative | 237.11 KB | 2013-11-07 | Graphic - 3rd Variable: ?P |
D-23559-1A.wmv | Demonstrative | 5.22 MB | 2013-11-07 | Demonstrative Animation |
D-23560.PDF | Demonstrative | 236.27 KB | 2013-11-07 | What Difference Does Pressure Change Make in Material Balance? |
D-23561.PDF | Demonstrative | 320.01 KB | 2013-11-07 | Key Differences Between Blunt's and Kelkar's Material Balance Analysis |
D-23562.PDF | Demonstrative | 272.55 KB | 2013-11-07 | Correcting Dr. Kelkar's Errors |
D-23563.PDF | Demonstrative | 322.17 KB | 2013-11-07 | Permeability Governs Flow Rate |
D-23564.PDF | Demonstrative | 273.20 KB | 2013-11-07 | Permeability |
D-23565A.PDF | Demonstrative | 1.05 MB | 2013-11-07 | Pressure Curve Steepness: Indication of Permeability |
D-23565B.PDF | Demonstrative | 310.78 KB | 2013-11-07 | Pressure Curve Steepness: Indication of Permeability [D-23565A with Handwritten Notes] |
D-23566.PDF | Demonstrative | 231.13 KB | 2013-11-07 | Permeability (in milliDarcies) |
D-23567.PDF | Demonstrative | 242.29 KB | 2013-11-07 | 3.26MMstb cumulative flow is consistent with a flow rate history that matches pressure data and known flow-rate intervals |
D-23567B.PDF | Demonstrative | 309.65 KB | 2013-11-07 | 3.26MMstb cumulative flow is consistent with a flow rate history that matches pressure data and known flow-rate intervals [D-23567 with Handwritten Notes] |
D-23596A.PDF | Demonstrative | 299.33 KB | 2013-11-07 | Permeability |
D-23599.PDF | Demonstrative | 397.51 KB | 2013-11-07 | Well Test Analysis |
D-23599A.PDF | Demonstrative | 217.14 KB | 2013-11-07 | Darcy's Law |
D-23600.PDF | Demonstrative | 224.41 KB | 2013-11-07 | Opinion 1: Permeability Calculated with MDT Tool" |
D-23601A.PDF | Demonstrative | 218.31 KB | 2013-11-07 | Opinion 2: Calculating Flow Rates |
D-23603.PDF | Demonstrative | 248.92 KB | 2013-11-07 | Permeability |
D-23604-1B.wmv | Demonstrative | 5.50 MB | 2013-11-07 | Demonstrative animation - Permeability Based on April 12, 2010 Downhole MDT Tool" |
D-23604-2.wmv | Demonstrative | 3.58 MB | 2013-11-07 | Demonstrative animation |
D-23608A.PDF | Demonstrative | 281.91 KB | 2013-11-07 | Deconvolution Sharpens Hubble Images |
D-23614.PDF | Demonstrative | 282.95 KB | 2013-11-07 | Education (Dr. Alain Gringarten) |
D-23615.PDF | Demonstrative | 316.47 KB | 2013-11-07 | Industry Experience (Dr. Alain Gringarten) |
D-23616.PDF | Demonstrative | 298.54 KB | 2013-11-07 | Imperial College, London |
D-23617.PDF | Demonstrative | 335.30 KB | 2013-11-07 | Advances in the State of the Art |
D-23618.PDF | Demonstrative | 311.06 KB | 2013-11-07 | Awards and Recognition |
D-23620A.PDF | Demonstrative | 1,002.15 KB | 2013-11-07 | Flow Rate Trend From Deconvolution |
D-23622.PDF | Demonstrative | 220.73 KB | 2013-11-07 | Most-Likely Flow Rate Estimate |
D-23626.PDF | Demonstrative | 347.93 KB | 2013-11-07 | Dr. Srdjan Nesic: Metal Erosion Expert |
D-23628A.PDF | Demonstrative | 1.01 MB | 2013-11-07 | Pressure Drop vs. Flow Rate |
D-23629.PDF | Demonstrative | 295.66 KB | 2013-11-07 | Expert Report of Dr. Srdjan Nesic |
D-23631.PDF | Demonstrative | 339.96 KB | 2013-11-07 | Dr. Srdjan Nesic: Summary of Expert Opinions |
D-23632.PDF | Demonstrative | 227.82 KB | 2013-11-07 | Studied Geometries |
D-23633B.PDF | Demonstrative | 1.12 MB | 2013-11-07 | Timeline of Significant Erosion Events |
D-23635A.PDF | Demonstrative | 1.65 MB | 2013-11-07 | Blind Shear Rams: Activated April 22 |
D-23637A.PDF | Demonstrative | 1.61 MB | 2013-11-07 | Casing Shear Rams: Activated April 29 |
D-23639A.PDF | Demonstrative | 1.97 MB | 2013-11-07 | Upper Annular Preventer and Drill Pipe: Activated April 20 |
D-23644B.PDF | Demonstrative | 1.73 MB | 2013-11-07 | Recovered Riser: Kinked April 22 |
D-23645.PDF | Demonstrative | 326.31 KB | 2013-11-07 | Dr. Hans Vaziri: BP Distinguished Advisor for Sand Management |
D-23648.PDF | Demonstrative | 318.73 KB | 2013-11-07 | Dr. Srdjan Nesic: Methodology |
D-23661.PDF | Demonstrative | 322.82 KB | 2013-11-07 | Professor Robert Zimmerman: Educational Background |
D-23662.PDF | Demonstrative | 358.54 KB | 2013-11-07 | Professor Robert Zimmerman: Academic and Work Experience |
D-23663.PDF | Demonstrative | 299.79 KB | 2013-11-07 | Professor Robert Zimmerman: Sample of Courses Taught |
D-23665.PDF | Demonstrative | 320.97 KB | 2013-11-07 | Professor Robert Zimmerman: Books |
D-23666.PDF | Demonstrative | 259.63 KB | 2013-11-07 | Professor Robert Zimmerman: Editorial Positions |
D-23667.PDF | Demonstrative | 263.42 KB | 2013-11-07 | Professor Robert Zimmerman: Professional Affiliations |
D-23668.PDF | Demonstrative | 1.09 MB | 2013-11-07 | Professor Robert Zimmerman: Awards |
D-23671.PDF | Demonstrative | 323.35 KB | 2013-11-07 | Professor Robert Zimmerman: Industry Experience |
D-23672.PDF | Demonstrative | 306.44 KB | 2013-11-07 | Key Opinion |
D-23674.PDF | Demonstrative | 248.24 KB | 2013-11-07 | Pores in Sandstones Can Store Fluid |
D-23675.PDF | Demonstrative | 259.14 KB | 2013-11-07 | Pressures in a Reservoir: Confining and Pore Pressures |
D-23676.PDF | Demonstrative | 290.25 KB | 2013-11-07 | Pressures in a Reservoir: Confining Pressures |
D-23677.PDF | Demonstrative | 242.67 KB | 2013-11-07 | What is Hydrostatic Compressibility? |
D-23677-1A.wmv | Demonstrative | 4.46 MB | 2013-11-07 | Demonstrative animation |
D-23678.PDF | Demonstrative | 242.04 KB | 2013-11-07 | What is Uniaxial Compressibility? |
D-23678-1A.wmv | Demonstrative | 4.07 MB | 2013-11-07 | Demonstrative animation |
D-23681.PDF | Demonstrative | 310.18 KB | 2013-11-07 | What is Pore Volume Compressibility? |
D-23682.PDF | Demonstrative | 306.02 KB | 2013-11-07 | What is Pore Volume Compressibility? |
D-23683.PDF | Demonstrative | 296.20 KB | 2013-11-07 | What is Pore Volume Compressibility? |
D-23684.PDF | Demonstrative | 322.31 KB | 2013-11-07 | Core Samples for Rock Mechanics Tests: Acquired from Various Depths |
D-23685.wmv | Demonstrative | 2.13 MB | 2013-11-07 | Demonstrative animation - What is Rotary Sidewall Coring? |
D-23686.PDF | Demonstrative | 290.02 KB | 2013-11-07 | Weatherford Labs' Rock Mechanics Tests Provide Data for UPVC Estimate |
D-23701.PDF | Demonstrative | 241.91 KB | 2013-11-07 | Macondo Hydrostatic PVC Converted to UPVC |
D-23702.wmv | Demonstrative | 1.00 MB | 2013-11-07 | Demonstrative animation - Acoustic Velocity Tests |
D-23719.PDF | Demonstrative | 252.09 KB | 2013-11-07 | Reservoir Rock: Bulk Volume |
D-23720.PDF | Demonstrative | 252.25 KB | 2013-11-07 | Uniaxial Compression Tests on Macondo Cores |
D-23720-1A.wmv | Demonstrative | 9.62 MB | 2013-11-07 | Demonstrative animation |
D-23721.PDF | Demonstrative | 264.52 KB | 2013-11-07 | Hydrostatic Stairstep Porosity Tests |
D-23766.PDF | Demonstrative | 2.21 MB | 2013-11-07 | Transition Spool Installation Tools |
D-23767-1.wmv | Demonstrative | 13.76 MB | 2013-11-07 | BOP-on-BOP Option |
D-23769.wmv | Demonstrative | 12.27 MB | 2013-11-07 | Demonstrative animation |
D-23769.1.1.wmv | Demonstrative | 8.58 MB | 2013-11-07 | Demonstrative animation |
D-23771A.wmv | Demonstrative | 7.28 MB | 2013-11-07 | Demonstrative animation |
D-23774A.PDF | Demonstrative | 356.26 KB | 2013-11-07 | 2-Ram Capping Stack vs. 3-Ram Capping Stack |
D-23784.PDF | Demonstrative | 333.52 KB | 2013-11-07 | Iain Adams - Norwell |
D-23785.PDF | Demonstrative | 339.47 KB | 2013-11-07 | Iain Adams - Evaluated Deepwater Horizon Source Control Response |
D-23788.PDF | Demonstrative | 341.82 KB | 2013-11-07 | Iain Adams - Overview of Opinions |
D-23791.PDF | Demonstrative | 309.27 KB | 2013-11-07 | Top Kill Was a Reasonable Effort to Control the Well |
D-23793A.PDF | Demonstrative | 385.60 KB | 2013-11-07 | Top Kill Risks and Mitigations |
D-23798.PDF | Demonstrative | 411.59 KB | 2013-11-07 | Federal Science Team Agreed That Top Kill Should Proceed |
D-23799.PDF | Demonstrative | 386.25 KB | 2013-11-07 | Federal Science Team Got Data in Real Time, Conducted Independent Analysis |
D-23808.PDF | Demonstrative | 382.32 KB | 2013-11-07 | Enterprise BOP: West Engineering Assessment Highlights |
D-23811-1.PDF | Demonstrative | 344.97 KB | 2013-11-07 | Why Did the Intervention BOP Need Modification? |
D-23822.PDF | Demonstrative | 332.58 KB | 2013-11-07 | Riser Cut: Two Pieces of Drill Pipe |
D-23823.PDF | Demonstrative | 317.30 KB | 2013-11-07 | The Three-Ram Capping Stack |
D-23827A.PDF | Demonstrative | 846.08 KB | 2013-11-07 | Unknown Wellbore Variables Created Uncertainty (Bottom Kill Broach Risk) |
D-23828A.PDF | Demonstrative | 840.90 KB | 2013-11-07 | Unknown Wellbore Variables Created Uncertainty (Bottom Kill Broach Risk) |
D-23829A.wmv | Demonstrative | 17.12 MB | 2013-11-07 | Demonstrative animation |
D-23829A.1.1.wmv | Demonstrative | 2.51 MB | 2013-11-07 | Demonstrative Animation |
D-23829A.1.2.wmv | Demonstrative | 1.90 MB | 2013-11-07 | Demonstrative Animation |
D-23829A.1.3.wmv | Demonstrative | 768.28 KB | 2013-11-07 | Demonstrative Animation |
D-23829A.1.4.wmv | Demonstrative | 4.59 MB | 2013-11-07 | Demonstrative Animation |
D-23829A.1.5.wmv | Demonstrative | 3.18 MB | 2013-11-07 | Demonstrative animation |
D-23831.PDF | Demonstrative | 324.40 KB | 2013-11-07 | Iain Adams - Approach to Assignment |
D-23837.PDF | Demonstrative | 351.96 KB | 2013-11-07 | Closing the Well with a Capping Stack: Factors the Aligned Parties Have Missed |
D-23840.wmv | Demonstrative | 26.78 MB | 2013-11-07 | Slug Flow in Horizontal Pipe |
D-23864.PDF | Demonstrative | 257.12 KB | 2013-11-07 | Sensitivity Analysis Results In Thousands of Stock Tank Barrels Per Day |
D-23865.wmv | Demonstrative | 692.46 KB | 2013-11-07 | Determination of Qualifying Flow Rates In Stock Tank Barrels Per Day |
D-23866.PDF | Demonstrative | 233.38 KB | 2013-11-07 | Flow Rate Estimates During May 13 - May 20 In Thousands of Stock Tank Barrels Per Day |
D-23866.1.1.BP.PDF | Demonstrative | 253.73 KB | 2013-11-07 | BP Callout from D-23866 |
D-23881.PDF | Demonstrative | 344.64 KB | 2013-11-07 | May 6, 2010 Top Kill Peer Review |
D-23882.PDF | Demonstrative | 355.93 KB | 2013-11-07 | May 6, 2010 Top Kill Peer Review |
D-23884.PDF | Demonstrative | 330.86 KB | 2013-11-07 | Peer Review: Continue Progressing Top Kill |
D-23885.PDF | Demonstrative | 413.20 KB | 2013-11-07 | Dr. Rygg's Relief Well Modeling |
D-23888.PDF | Demonstrative | 387.94 KB | 2013-11-07 | Flow Rate Group Preliminary Best Estimate of Oil Flowing From BP Oil Well (May 27, 2010) |
D-23892.PDF | Demonstrative | 219.08 KB | 2013-11-07 | Identifying a Trend |
D-23916.wmv | Demonstrative | 26.88 MB | 2013-11-07 | Slug Flow from Riser End |
D-23917.PDF | Demonstrative | 313.59 KB | 2013-11-07 | Ziegler Holds Himself Out as an Expert in Many Fields |
D-23922.PDF | Demonstrative | 322.18 KB | 2013-11-07 | Trevor Hill: Purpose of April 28 Modeling |
D-23923.PDF | Demonstrative | 359.02 KB | 2013-11-07 | Mike Mason: Purpose of May 11 Modeling |
D-23933.PDF | Demonstrative | 357.19 KB | 2013-11-07 | Enterprise BOP: Choke and Kill Line Hoses |
D-23934.PDF | Demonstrative | 410.19 KB | 2013-11-07 | Capping Stack Activities Timeline |
D-23936.PDF | Demonstrative | 373.28 KB | 2013-11-07 | Appendix 4 of the BP GoM Deepwater SPU Well Control Response Guide |
D-23945.PDF | Demonstrative | 293.61 KB | 2013-11-07 | Changing Flow Restrictions |
D-23958.PDF | Demonstrative | 937.67 KB | 2013-11-07 | Physical demonstrative |
D-23962.PDF | Demonstrative | 1.03 MB | 2013-11-07 | Physical demonstrative |
D-23963.PDF | Demonstrative | 1.02 MB | 2013-11-07 | Physical demonstrative |
D-23964.PDF | Demonstrative | 880.98 KB | 2013-11-07 | Physical demonstrative |
D-23968.PDF | Demonstrative | 277.74 KB | 2013-11-07 | PERA Clients |
D-23974.PDF | Demonstrative | 246.65 KB | 2013-11-07 | Professor Curtis Whitson: Publications |
D-23987-1A.PDF | Demonstrative | 315.39 KB | 2013-11-07 | Shrinkage Factors from 100 Barrels of Reservoir Fluid |
D-23988.PDF | Demonstrative | 222.83 KB | 2013-11-07 | Prof. Whitson's Ocean-Separator Model |
D-23995B.PDF | Demonstrative | 1.16 MB | 2013-11-07 | Relative Flow Rate Change Due to Metal Erosion |
D-23996A.PDF | Demonstrative | 1.18 MB | 2013-11-07 | Applying 30% Error to Dykhuizen's 5 Million STB Cumulative Estimate |
D-23997-1A.PDF | Demonstrative | 291.32 KB | 2013-11-07 | Griffiths's Adjusted PT-B (BOP Pressure) Plot |
D-23997-2A.PDF | Demonstrative | 303.37 KB | 2013-11-07 | Griffiths's Adjusted PT-B (BOP Pressure) Plot with April 20 to May 8 Griffiths Extrapolation |
D-24200.PDF | Demonstrative | 718.60 KB | 2013-11-07 | Physical demonstrative |
D-24201.PDF | Demonstrative | 1.00 MB | 2013-11-07 | Physical demonstrative |
D-24202.PDF | Demonstrative | 730.65 KB | 2013-11-07 | Physical demonstrative |
D-24203.PDF | Demonstrative | 709.68 KB | 2013-11-07 | Physical demonstrative |
D-24207A.wmv | Demonstrative | 93.76 MB | 2013-11-07 | Demonstrative animation |
D-24207A-1.wmv | Demonstrative | 15.31 MB | 2013-11-07 | Simulation of Particles Passing Through Kinked Riser |
D-24210A.wmv | Demonstrative | 127.43 MB | 2013-11-07 | Demonstrative animation |
D-24210A-1.wmv | Demonstrative | 56.29 MB | 2013-11-07 | Simulation of Particles Passing Through Eroded Blind Shear Rams |
D-24213A.wmv | Demonstrative | 65.22 MB | 2013-11-07 | Demonstrative animation |
D-24213A-1.wmv | Demonstrative | 46.84 MB | 2013-11-07 | Simulation of Particles Passing Through Pre-Eroded Blind Shear Rams |
D-24222.PDF | Demonstrative | 253.75 KB | 2013-11-07 | Most-Likely Flow Rate History |
D-24223.PDF | Demonstrative | 227.30 KB | 2013-11-07 | Alternative Flow Rate Estimates |
D-24238.PDF | Demonstrative | 241.61 KB | 2013-11-07 | Comparison of Cement/Concrete Erosion Rates |
D-24246A.PDF | Demonstrative | 1.19 MB | 2013-11-07 | Kinked Riser Erosion |
D-24252.PDF | Demonstrative | 254.56 KB | 2013-11-07 | Slug Flow from Riser End |
D-24257.PDF | Demonstrative | 267.71 KB | 2013-11-07 | Slug Flow Observed to Be Very Regular |
D-24273.PDF | Demonstrative | 395.90 KB | 2013-11-07 | Excerpts from Rygg, Hunter and Ratzel Deposition Testimony |
D-24342.PDF | Demonstrative | 323.19 KB | 2013-11-07 | Top Kill Was Well Executed |
D-24355.PDF | Demonstrative | 301.31 KB | 2013-11-07 | Transition Spool |
D-24356-1-1.PDF | Demonstrative | 315.33 KB | 2013-11-07 | Timeline |
D-24362.PDF | Demonstrative | 1.15 MB | 2013-11-07 | Multiple Channels Compose the Macondo Reservoir |
D-24365.PDF | Demonstrative | 347.33 KB | 2013-11-07 | Transocean Witness Robert Turlak |
D-24368.PDF | Demonstrative | 1.09 MB | 2013-11-07 | Pressures |
D-24369.PDF | Demonstrative | 1.12 MB | 2013-11-07 | Upstream of PT-B |
D-24370.PDF | Demonstrative | 1.12 MB | 2013-11-07 | Downstream of PT-B |
D-24372-1.PDF | Demonstrative | 1.08 MB | 2013-11-07 | Dr. Griffiths's Constant Discharge Coefficients |
D-24372-2.PDF | Demonstrative | 1.09 MB | 2013-11-07 | Dr. Griffiths's Constant Discharge Coefficients |
D-24372-3.PDF | Demonstrative | 1.09 MB | 2013-11-07 | Dr. Griffiths's Constant Discharge Coefficients |
D-24372-4.PDF | Demonstrative | 1.08 MB | 2013-11-07 | Dr. Griffiths's Constant Discharge Coefficients |
D-24372-5.PDF | Demonstrative | 1.08 MB | 2013-11-07 | Dr. Griffiths's Constant Discharge Coefficients |
D-24372-6.PDF | Demonstrative | 1.08 MB | 2013-11-07 | Dr. Griffiths's Constant Discharge Coefficients |
D-24373.PDF | Demonstrative | 1.02 MB | 2013-11-07 | Dr. Griffiths's Constant Discharge Coefficients |
D-24374.PDF | Demonstrative | 1.07 MB | 2013-11-07 | Best Estimate" |
D-24375.PDF | Demonstrative | 1.09 MB | 2013-11-07 | Alternative 1 |
D-24376.PDF | Demonstrative | 1,019.65 KB | 2013-11-07 | Alternative 2 |
D-24377.PDF | Demonstrative | 1.05 MB | 2013-11-07 | Dr. Griffiths's Three Methods - 5 Million Barrels |
D-24388-2.PDF | Demonstrative | 921.77 KB | 2013-11-07 | Top Hat Exterior |
D-24389.PDF | Demonstrative | 1.05 MB | 2013-11-07 | Dr. Hsieh Cumulative Flow Estimates |
D-24401.PDF | Demonstrative | 1.24 MB | 2013-11-07 | Pressures (Flow Increases, Flow Decreases) |
D-24402.PDF | Demonstrative | 1.13 MB | 2013-11-07 | Permeability Values (in milliDarcies) |
D-24403.PDF | Demonstrative | 1.05 MB | 2013-11-07 | Porosity Values |
D-24406.PDF | Demonstrative | 1.28 MB | 2013-11-07 | Flow Rate Prediction: DOE-NNSA |
D-24407.PDF | Demonstrative | 1.26 MB | 2013-11-07 | Flow Rate Prediction: DOE-NNSA |
D-24408.PDF | Demonstrative | 1.16 MB | 2013-11-07 | Dr. Griffiths's Alternative 2 |
D-24409.PDF | Demonstrative | 1.13 MB | 2013-11-07 | Best Estimate |
D-24452.PDF | Demonstrative | 324.04 KB | 2013-11-07 | Erosion in Kinked Riser |
D-24465.PDF | Demonstrative | 356.61 KB | 2013-11-07 | Seismic Data: Location of the Oil |
D-24468.PDF | Demonstrative | 260.52 KB | 2013-11-07 | Second Variable: Compressibility |
D-24469.PDF | Demonstrative | 325.95 KB | 2013-11-07 | Measured Value is 6 microsips |
D-24471.PDF | Demonstrative | 398.41 KB | 2013-11-07 | Kelkar's Survey of GoM: Middle Value of 3 and extreme" "High" Value of 10" |
D-24482.PDF | Demonstrative | 259.41 KB | 2013-11-07 | Third Variable: Pressure Change |
D-24495.PDF | Demonstrative | 343.29 KB | 2013-11-07 | BP Technical Memo |
D-24496.PDF | Demonstrative | 349.07 KB | 2013-11-07 | Applying 30% Error to Dykhuizen's 5 Million STB Cumulative Estimate [Handwritten Markup of D-23996A] |
D-24527.PDF | Demonstrative | 1.14 MB | 2013-11-07 | Dr. Griffiths's Adjusted PT-B Pressure |
D-24531.PDF | Demonstrative | 327.05 KB | 2013-11-07 | Dr. Griffiths's Best Estimate" |
D-24532.PDF | Demonstrative | 306.98 KB | 2013-11-07 | Dr. Griffiths's Alternative 1 |
D-24543.PDF | Demonstrative | 1.45 MB | 2013-11-07 | Dr. Pooladi-Darvish: Original Base and Sensitivity Cases |
D-24544.PDF | Demonstrative | 1.18 MB | 2013-11-07 | Dr. Pooladi-Darvish: Collection Matching Process |
D-24545-3.PDF | Demonstrative | 1.17 MB | 2013-11-07 | Dr. Pooladi-Darvish: 38 Total Base, Sensitivity, and What-if" Cases" |
D-24546-1.PDF | Demonstrative | 1.08 MB | 2013-11-07 | Dr. Pooladi-Darvish: Cases Designed to Consider BOP Erosion |
D-24546-2.PDF | Demonstrative | 1.12 MB | 2013-11-07 | Dr. Pooladi-Darvish: Cases Designed to Consider BOP Erosion |
D-24549.PDF | Demonstrative | 1.06 MB | 2013-11-07 | Dr. Pooladi-Darvish: Flat BOP" Case" |
D-24550.PDF | Demonstrative | 1.06 MB | 2013-11-07 | Dr. Pooladi-Darvish: Extrapolated BOP" Case" |
D-24551.PDF | Demonstrative | 1.10 MB | 2013-11-07 | Dr. Pooladi-Darvish's Resistance Coefficients |
D-24552-1.PDF | Demonstrative | 289.11 KB | 2013-11-07 | Questions Asked |
D-24552-2.PDF | Demonstrative | 379.55 KB | 2013-11-07 | Questions Asked and Opinions Reached |
D-24552-4.PDF | Demonstrative | 385.99 KB | 2013-11-07 | Questions Asked and Opinions Reached |
D-24553.PDF | Demonstrative | 319.90 KB | 2013-11-07 | Michael Zaldivar, Ph.D |
D-24560.PDF | Demonstrative | 293.34 KB | 2013-11-07 | Expert Report of Dr. Michael Zaldivar |
D-24561.PDF | Demonstrative | 343.30 KB | 2013-11-07 | Analysis Performed to Reach Opinions |
D-24563.PDF | Demonstrative | 356.43 KB | 2013-11-07 | Transient Multiphase Flow Simulators |
D-24564.PDF | Demonstrative | 351.96 KB | 2013-11-07 | Government Scientists Confirm Slug Flow in Mid-May 2010 |
D-24567.PDF | Demonstrative | 1.11 MB | 2013-11-07 | Riser Motion Periods Match Slug Flow Periods |
D-24568.PDF | Demonstrative | 280.29 KB | 2013-11-07 | Slug Mechanism |
D-24569.PDF | Demonstrative | 331.71 KB | 2013-11-07 | Two Models |
D-24570.PDF | Demonstrative | 306.17 KB | 2013-11-07 | Sensitivity to Pipe Roughness |
D-24571.PDF | Demonstrative | 346.86 KB | 2013-11-07 | Sensitivity Studies Performed for Key Input Parameters |
D-24577.PDF | Demonstrative | 1.41 MB | 2013-11-07 | Physical Demonstrative |
D-24584.PDF | Demonstrative | 303.03 KB | 2013-11-07 | PERA |
D-24586.PDF | Demonstrative | 1.41 MB | 2013-11-07 | Why is EOS Model Needed? |
D-24589A.PDF | Demonstrative | 263.70 KB | 2013-11-07 | EOS Models Compared to Lab Data for Single Stage |
D-24590A.PDF | Demonstrative | 260.75 KB | 2013-11-07 | EOS Models Compared to Lab Data for Four Stage |
D-24591.PDF | Demonstrative | 289.17 KB | 2013-11-07 | Macondo Laboratory Tests |
D-24595.PDF | Demonstrative | 288.70 KB | 2013-11-07 | Key Deficiency in Dr. Zick's EOS Model Predictions |
D-24603.wmv | Demonstrative | 12.93 MB | 2013-11-07 | Demonstrative animation - Erosion of Steel Due to Impact of Sand Particles |
D-24604.PDF | Demonstrative | 337.57 KB | 2013-11-07 | Summary of Dr. Whitson's Opinions |
D-24605.PDF | Demonstrative | 264.59 KB | 2013-11-07 | Dr. Blunt's Connected Oil Volume |
D-24606.PDF | Demonstrative | 313.25 KB | 2013-11-07 | Dr. Blunt's Pressure Analysis |
D-24607.PDF | Demonstrative | 266.51 KB | 2013-11-07 | Dr. Blunt's Rock Compressibility |
D-24608.PDF | Demonstrative | 262.70 KB | 2013-11-07 | Dr. Blunt's Pressure Drop |
D-24618.PDF | Demonstrative | 874.64 KB | 2013-11-07 | Adrian E. Johnson, PhD (FEESA) |
D-24629.PDF | Demonstrative | 826.53 KB | 2013-11-07 | Effect on Dr. Griffiths's Flow Rate Trend when Dual Flow Paths are Included Instead of Constant Kwell |
D-24631.PDF | Demonstrative | 883.74 KB | 2013-11-07 | Macondo System is Not Constant Over Time: Drillpipe Detached |
D-24634.PDF | Demonstrative | 281.32 KB | 2013-11-07 | Dr. Griffiths's PT-B Pressure Profile Over-predicts the Cumulative Release by as Much as 500,000 Barrels |
D-24643.PDF | Demonstrative | 1.08 MB | 2013-11-07 | The Need for Geometric Transformation for Non-Circular Geometrics |
D-24644.PDF | Demonstrative | 1.04 MB | 2013-11-07 | Hydraulic Diameter (Dh): Geometric Transformation |
D-24650.PDF | Demonstrative | 310.32 KB | 2013-11-07 | What is a Microsip? |
D-24651.PDF | Demonstrative | 1.29 MB | 2013-11-07 | Using Measured Data to Calculate Macondo's Average UPVC |
D-24653.PDF | Demonstrative | 307.36 KB | 2013-11-07 | Macondo Reservoir's Estimated UPVC Based on Acoustic Velocity Data |
D-24656.PDF | Demonstrative | 320.34 KB | 2013-11-07 | Timeline |
D-24659.PDF | Demonstrative | 292.22 KB | 2013-11-07 | Effect on Dr. Griffiths's Flow Rate Trend when Dual Flow Paths are Included Instead of Constant Kwell |
D-24660.PDF | Demonstrative | 267.87 KB | 2013-11-07 | Expert Report of Alain Gringarten |
D-24661.PDF | Demonstrative | 285.32 KB | 2013-11-07 | Dr. Gringarten's Opinions |
D-24662.PDF | Demonstrative | 285.69 KB | 2013-11-07 | Permeability |
D-24665.PDF | Demonstrative | 230.33 KB | 2013-11-07 | Permeability from Derivative Plot |
D-24666.PDF | Demonstrative | 241.18 KB | 2013-11-07 | Verification: Horner Plot |
D-24667.PDF | Demonstrative | 234.60 KB | 2013-11-07 | Well Test Analysis Tools for Calculating Permeability |
D-24668.PDF | Demonstrative | 271.41 KB | 2013-11-07 | Permeability Conclusions |
D-24671-5A.PDF | Demonstrative | 1.09 MB | 2013-11-07 | Roadmap of Flow Rate Reconstruction |
D-24676.PDF | Demonstrative | 254.85 KB | 2013-11-07 | Pressure Derivative (Log-Log Plot) |
D-24679.wmv | Demonstrative | 38.76 MB | 2013-11-07 | Lay of the Land |
D-24680.wmv | Demonstrative | 11.64 MB | 2013-11-07 | Lay of the Land |
D-24681.wmv | Demonstrative | 14.90 MB | 2013-11-07 | Lay of the Land |
D-24682A.wmv | Demonstrative | 27.07 MB | 2013-11-07 | Slug Flow Linked to Riser Motion |
D-24683A.wmv | Demonstrative | 27.96 MB | 2013-11-07 | Slug Flow Modeling Matches Slug Flow |
D-24686.PDF | Demonstrative | 275.77 KB | 2013-11-07 | Inputs to Riser Models |
D-24688.PDF | Demonstrative | 368.81 KB | 2013-11-07 | Hydraulic Diameter is Appropriate to Calculate Pressure Drop |
D-24689.PDF | Demonstrative | 315.68 KB | 2013-11-07 | Will Wireline Formation Tests Replace Well Tests? |
D-24696.PDF | Demonstrative | 342.41 KB | 2013-11-07 | Consistency Check: Does it all make sense in light of buildup? |
D-24697.PDF | Demonstrative | 334.30 KB | 2013-11-07 | Consistency Check: Does Skin Plot Look as Expected? |
D-24698-1.PDF | Demonstrative | 305.01 KB | 2013-11-07 | Merrill Rock Compressibility Timeline |
D-24698-2.PDF | Demonstrative | 312.93 KB | 2013-11-07 | Merrill Rock Compressibility Timeline |
D-24698-3.PDF | Demonstrative | 269.23 KB | 2013-11-07 | Merrill Rock Compressibility Timeline |
D-24703.PDF | Demonstrative | 769.75 KB | 2013-11-07 | Dr. Johnson's Principal Opinions |
D-24707.PDF | Demonstrative | 709.59 KB | 2013-11-07 | Andreas Momber, Ph.D.* |
D-24708.PDF | Demonstrative | 678.37 KB | 2013-11-07 | Momber: Key Opinions |
D-24723.PDF | Demonstrative | 290.34 KB | 2013-11-07 | Recovered Riser |
D-24727.PDF | Demonstrative | 328.47 KB | 2013-11-07 | BP Technical Memo |
D-24740.PDF | Demonstrative | 284.36 KB | 2013-11-07 | Michael Zaldivar Equivalent Pipe vs. Annular Pipes [Photograph of Handwritten Notes on Whiteboard] |
D-24746.PDF | Demonstrative | 278.91 KB | 2013-11-07 | Permeable Intervals |
D-24750.PDF | Demonstrative | 231.31 KB | 2013-11-07 | Well Test Analysis Plots |
D-25010.wmv | Demonstrative | 7.60 MB | 2013-11-07 | Animation - |
D-25011A.PPTX | Demonstrative | 2.70 MB | 2013-11-07 | Internal vs. External Flow Rate Estimates; Edit Freely"/May 10th Letter Animation (Amended)" |
D-25013B.PDF | Demonstrative | 821.78 KB | 2013-11-07 | BP Org Chart Amended |
D-25015C.PDF | Demonstrative | 592.97 KB | 2013-11-07 | BP Flow Rate Modeling, April 21, 2010 - May 31, 2010; Bar Chart with BP Flow Rate Representations in Dots (Amended) |
D-25018A.PDF | Demonstrative | 490.15 KB | 2013-11-07 | BP: 5,000 BOPD Best Estimate" |
D-25019.PDF | Demonstrative | 439.08 KB | 2013-11-07 | Summary of Dr. Wilson's Expert Opinions |
D-25019.1.PDF | Demonstrative | 439.08 KB | 2013-11-07 | Summary of Wilson's Opinions - Page 1 |
D-25019.2.PDF | Demonstrative | 350.95 KB | 2013-11-07 | Summary of Dr. Wilson's Expert Opinions |
D-25019.3.PDF | Demonstrative | 346.96 KB | 2013-11-07 | Summary of Dr. Wilson's Expert Opinions |
D-25019.4.PDF | Demonstrative | 347.93 KB | 2013-11-07 | Summary of Dr. Wilson's Expert Opinions |
D-25019.5.PDF | Demonstrative | 332.45 KB | 2013-11-07 | Summary of Dr. Wilson's Expert Opinions |
D-25021.PDF | Demonstrative | 1.10 MB | 2013-11-07 | Macondo Reservoir Model |
D-25023.PDF | Demonstrative | 3.13 MB | 2013-11-07 | Physical Demonstrative |
D-25024.PDF | Demonstrative | 794.03 KB | 2013-11-07 | Physical Demonstrative |
D-25025.PDF | Demonstrative | 858.55 KB | 2013-11-07 | Physical Demonstrative |
D-25026.PDF | Demonstrative | 3.18 MB | 2013-11-07 | Physical Demonstrative |
D-25027.PDF | Demonstrative | 3.20 MB | 2013-11-07 | Physical Demonstrative |
D-25029.PDF | Demonstrative | 114.10 KB | 2013-11-07 | Whiteboard: Scenarios #1 - #3 |
D-25030.PDF | Demonstrative | 140.76 KB | 2013-11-07 | Whiteboards: Scenario #1, HC and dominant mud flow up drill pipe and bypass through rams (with handwritten notes) |
D-26007.zip | Demonstrative | 37.68 MB | 2013-11-07 | Landing Capping Stack |
D-26009A.PDF | Demonstrative | 331.97 KB | 2013-11-07 | Timeline of Discrete Tasks to Accomplish Capping at Macondo |
TREX-001651.PDF | Exhibit | 26.39 MB | 2013-11-07 | Letter: Response to Chairman Markey's Correspondence, Dated May 14, 2010, to Mr. Lamar McKay, President and CEO of BP America, Inc. (CURED) |
TREX-001651.1.1.TO.Ballard.PDF | Callout | 320.46 KB | 2013-11-07 | Transocean Callout from TREX-001651 |
TREX-001651.1.1.TO.Wilson.PDF | Callout | 339.59 KB | 2013-11-07 | Transocean Callout from TREX-001651 |
TREX-001651.1.2.TO.PDF | Callout | 418.64 KB | 2013-11-07 | Transocean Callout from TREX-001651 |
TREX-001651.2.1.TO.PDF | Callout | 382.78 KB | 2013-11-07 | Transocean Callout from TREX-001651 |
TREX-002386.PDF | Exhibit | 175.89 MB | 2013-11-07 | Manual: BP GoM Deepwater SPU - Well Control Response Guide |
TREX-002386.1.BP.PDF | Callout | 410.06 KB | 2013-11-07 | BP Callout from TREX-002386 |
TREX-002386.9.1.BP.PDF | Callout | 1.02 MB | 2013-11-07 | BP Callout from TREX-002386 |
TREX-002386.9.1.PSC.PDF | Callout | 233.91 KB | 2013-11-07 | PSC Callout from TREX-002386 |
TREX-003218.PDF | Exhibit | 19.23 MB | 2013-11-07 | Email - From: Doug Suttles To: John Lynch, Jr. - Subject: FW: Flow rate note?, with attachment |
TREX-003218.1.1.TO.PDF | Callout | 316.37 KB | 2013-11-07 | Transocean Callout from TREX-003218 |
TREX-003218.15.1.TO.PDF | Callout | 367.67 KB | 2013-11-07 | Transocean Callout from TREX-003218 |
TREX-003220.PDF | Exhibit | 1.32 MB | 2013-11-07 | Email - From: John Lynch, Jr. To: David Rainey - Subject: Redacted |
TREX-003220.1.1.TO.Ballard.PDF | Callout | 372.73 KB | 2013-11-07 | Transocean Callout from TREX-003220 |
TREX-003220.1.1.TO.Wilson.PDF | Callout | 389.27 KB | 2013-11-07 | Transocean Callout from TREX-003220 |
TREX-003375.PDF | Exhibit | 70.29 MB | 2013-11-07 | Memo: Technical Memorandum - Post-Well Subsurface Description of Macondo well (MC252) (CURED) |
TREX-003375.1.1.US.PDF | Callout | 382.40 KB | 2013-11-07 | U.S. Callout from TREX-003375 |
TREX-003375.31.1.US.PDF | Callout | 323.49 KB | 2013-11-07 | U.S. Callout from TREX-003375 |
TREX-003533.PDF | Exhibit | 68.84 MB | 2013-11-07 | Technical Memo : Post Well Subsurface Description of Macondo well |
TREX-003533.1.1.US.PDF | Callout | 485.62 KB | 2013-11-07 | U.S. Callout from TREX-003533 |
TREX-003533.13.1.US.PDF | Callout | 378.58 KB | 2013-11-07 | U.S. Callout from TREX-003533 |
TREX-003533.13.2.US.PDF | Callout | 314.75 KB | 2013-11-07 | U.S. Callout from TREX-003533 |
TREX-003533.34.1.US.PDF | Callout | 383.97 KB | 2013-11-07 | U.S. Callout from TREX-003533 |
TREX-003533.35.1.US.PDF | Callout | 329.99 KB | 2013-11-07 | U.S. Callout from TREX-003533 |
TREX-003533.36.1.BP.PDF | Callout | 579.10 KB | 2013-11-07 | BP Callout from TREX-003533 |
TREX-003533.36.2.BP.PDF | Callout | 552.78 KB | 2013-11-07 | BP Callout from TREX-003533 |
TREX-003917.PDF | Exhibit | 5.63 MB | 2013-11-07 | MC 252 Junk Shot Peer Assist |
TREX-003917.1.1.PSC.PDF | Callout | 291.76 KB | 2013-11-07 | PSC Callout from TREX-003917 |
TREX-003917.1.2.PSC.PDF | Callout | 228.76 KB | 2013-11-07 | PSC Callout from TREX-003917 |
TREX-003917.2.1.PSC.PDF | Callout | 221.43 KB | 2013-11-07 | PSC Callout from TREX-003917 |
TREX-003917.2.2.PSC.PDF | Callout | 263.30 KB | 2013-11-07 | PSC Callout from TREX-003917 |
TREX-003918.PDF | Exhibit | 7.36 MB | 2013-11-07 | Email from K. Girlinghouse to B. Franklin attaching WWCI Project Memo-13 Capping Options Rev2.doc |
TREX-003918.1.1.HESI.PDF | Callout | 872.18 KB | 2013-11-07 | Halliburton Callout from TREX-003918 |
TREX-003918.2.1.HESI.PDF | Callout | 589.44 KB | 2013-11-07 | Halliburton Callout from TREX-003918 |
TREX-003918.4.1.HESI.PDF | Callout | 529.42 KB | 2013-11-07 | Halliburton Callout from TREX-003918 |
TREX-004310.PDF | Exhibit | 11.85 MB | 2013-11-07 | E-mail from James Wellings to Kirk Cantrell, et al.; Subject: FW: We;; Cap Animation Fixes |
TREX-004310.1.1.TO.PDF | Callout | 360.44 KB | 2013-11-07 | Transocean Callout from TREX-004310 |
TREX-004319.PDF | Exhibit | 6.58 MB | 2013-11-07 | Email from I. Sneddon to A. Olsen re Re: BOP Guidance Frame" |
TREX-004319.1.1.TO.PDF | Callout | 406.62 KB | 2013-11-07 | Transocean Callout from TREX-004319 |
TREX-005063.PDF | Exhibit | 7.20 MB | 2013-11-07 | Email from T. Hill to G. Birrell re: Action Items from 3:00 PM Sunday telecon - flow modeling |
TREX-005063.1.1.TO.PDF | Callout | 359.09 KB | 2013-11-07 | Transocean Callout from TREX-005063 |
TREX-005063.1.2.BP.PDF | Callout | 302.09 KB | 2013-11-07 | BP Callout from TREX-005063 |
TREX-005063.4.1.TO.PDF | Callout | 382.50 KB | 2013-11-07 | Transocean Callout from TREX-005063 |
TREX-005063.4.2.TO.PDF | Callout | 484.89 KB | 2013-11-07 | Transocean Callout from TREX-005063 |
TREX-005063.4.3.BP.PDF | Callout | 306.67 KB | 2013-11-07 | BP Callout from TREX-005063 |
TREX-005063.4.5.BP.PDF | Callout | 359.07 KB | 2013-11-07 | BP Callout from TREX-005063 |
TREX-005063.4.5.TO.PDF | Callout | 357.64 KB | 2013-11-07 | Transocean Callout from TREX-005063 |
TREX-005063.4.6.BP.PDF | Callout | 337.34 KB | 2013-11-07 | BP Callout from TREX-005063 |
TREX-005066.PDF | Exhibit | 3.36 MB | 2013-11-07 | Email from P. Tooms to K. Wells, et al. re: Historical BOP Pressure attaching BOP Pressure History rev 3 |
TREX-005066.1.1.US.PDF | Callout | 475.80 KB | 2013-11-07 | U.S. Callout from TREX-005066 |
TREX-005066.1.2.US.PDF | Callout | 601.13 KB | 2013-11-07 | U.S. Callout from TREX-005066 |
TREX-005066.1.3.US.PDF | Callout | 416.52 KB | 2013-11-07 | U.S. Callout from TREX-005066 |
TREX-005066.3.1.US.PDF | Callout | 474.51 KB | 2013-11-07 | U.S. Callout from TREX-005066 |
TREX-005246.PDF | Exhibit | 19.29 MB | 2013-11-07 | Email from J. Peijs to J. Thorseth re: Macondo TAM attaching 0904 Macondo TAM |
TREX-005246.16.1.US.PDF | Callout | 480.32 KB | 2013-11-07 | U.S. Callout from TREX-005246 |
TREX-005246.2.PDF | Callout | 343.81 KB | 2013-11-07 | U.S. Callout from TREX-005246 |
TREX-005363.PDF | Exhibit | 8.93 MB | 2013-11-07 | Email from J. Sprague to A. Frazelle re: Slides (attaching top kill analysis .ppt) |
TREX-005363.1.1.PSC.PDF | Callout | 188.05 KB | 2013-11-07 | PSC Callout from TREX-005363 |
TREX-005363.10.1.PSC.PDF | Callout | 223.67 KB | 2013-11-07 | PSC Callout from TREX-005363 |
TREX-005363.2.1.PSC.PDF | Callout | 161.21 KB | 2013-11-07 | PSC Callout from TREX-005363 |
TREX-005363.3.1.PSC.PDF | Callout | 210.09 KB | 2013-11-07 | PSC Callout from TREX-005363 |
TREX-006124.PDF | Exhibit | 25.52 MB | 2013-11-07 | BP Deepwater Horizon Review |
TREX-006124.2.1.PSC.PDF | Callout | 250.41 KB | 2013-11-07 | PSC Callout from TREX-006124 |
TREX-006196.PDF | Exhibit | 7.41 MB | 2013-11-07 | Considerations of flowrate from MC252 - Trevor Hill, August 17 |
TREX-006196.4.1.US.PDF | Callout | 558.70 KB | 2013-11-07 | U.S. Callout from TREX-006196 |
TREX-006299.1.BP.PDF | Callout | 97.85 KB | 2013-11-07 | BP Callout from TREX-006299 |
TREX-006299.6.1.BP.PDF | Callout | 506.71 KB | 2013-11-07 | BP Callout from TREX-006299 |
TREX-006343.PDF | Exhibit | 13.65 MB | 2013-11-07 | Email from B. Ritchie to C. Yeilding and J. Thorseth re: Action Required: MC252 Subsurface Technical Memo attaching MC252 Subsurface Technical Memo |
TREX-006400.PDF | Exhibit | 8.34 MB | 2013-11-07 | Email from G. Skripnikova to S. Lacy, et al. re: Rotary Sidewall attaching Macondo TD Section SWC |
TREX-007104.PDF | Exhibit | 12.03 MB | 2013-11-07 | Email - From: Charles Curtis To: John Schwebel and others - Subject: RE: Thanks For the Good Work BOP on BOP and Capping Stack Team, with attachment |
TREX-007104.2.1.TO.PDF | Callout | 394.99 KB | 2013-11-07 | Transocean Callout from TREX-007104 |
TREX-007104.3.1.TO.PDF | Callout | 471.39 KB | 2013-11-07 | Transocean Callout from TREX-007104 |
TREX-007353.1.1.BP.PDF | Callout | 46.86 KB | 2013-11-07 | BP Callout from TREX-007353 |
TREX-007353.354.1.BP.PDF | Callout | 303.30 KB | 2013-11-07 | BP Callout from TREX-007353 |
TREX-007353.357.5.BP.PDF | Callout | 316.24 KB | 2013-11-07 | BP Callout from TREX-007353 |
TREX-007353.414.1.BP.PDF | Callout | 312.55 KB | 2013-11-07 | BP Callout from TREX-007353 |
TREX-007401.PDF | Exhibit | 107.02 MB | 2013-11-07 | Summary and Conclusions Deepwater Horizon Incident |
TREX-007401.30.1.US.PDF | Callout | 469.53 KB | 2013-11-07 | U.S. Callout from TREX-007401 |
TREX-008537.PDF | Exhibit | 11.34 MB | 2013-11-07 | Email from O. Rygg - K. Mix re Top kill - 5000 and 15000 bopd |
TREX-008537.1.1.PSC.PDF | Callout | 176.00 KB | 2013-11-07 | PSC Callout from TREX-008537 |
TREX-008538.PDF | Exhibit | 11.93 MB | 2013-11-07 | BP Macondo Top Kill Procedure for MC252-1 Momentum Kill Pumping Operations |
TREX-008538.1.1.BP.PDF | Callout | 198.38 KB | 2013-11-07 | BP Callout from TREX-008538 |
TREX-008542.PDF | Exhibit | 4.72 MB | 2013-11-07 | Email from E. Metcalf - J. Wellings re RE: Jim Wellings Way Forward |
TREX-008542.1.1.TO.PDF | Callout | 469.52 KB | 2013-11-07 | Transocean Callout from TREX-008542 |
TREX-008583.PDF | Exhibit | 13.19 MB | 2013-11-07 | Email from J. LeBlanc - K. McAughan et al. re 36126-53 PVT Study |
TREX-008583.1.1.BP.PDF | Callout | 276.25 KB | 2013-11-07 | BP Callout from TREX-008583 |
TREX-008583.3.PDF | Callout | 293.95 KB | 2013-11-07 | BP Callout from TREX-008583 |
TREX-008584.PDF | Exhibit | 13.32 MB | 2013-11-07 | Email from J. LeBlanc - K. McAughan re Macondo PVT for 36126-19 |
TREX-008584.3.PDF | Callout | 290.54 KB | 2013-11-07 | BP Callout from TREX-008584 |
TREX-008615.PDF | Exhibit | 16.72 MB | 2013-11-07 | Computer Simulation of Reservoir Depletion and Oil Flow from the Macondo Well Following the Deepwater Horizon Blowout |
TREX-008615.11.1.BP.PDF | Callout | 532.87 KB | 2013-11-07 | BP Callout from TREX-008615 |
TREX-008618.PDF | Exhibit | 2.45 MB | 2013-11-07 | Application of MODFLOW for Oil Reservoir Simulation During the Deepwater Horizon Crisis |
TREX-008620.PDF | Exhibit | 11.31 MB | 2013-11-07 | From Straight Lines to Deconvolution: The Evolution of the State of the Art in Well Test Analysis |
TREX-008624.PDF | Exhibit | 2.52 MB | 2013-11-07 | Email from S. Hickman - C. Enomoto et al. re Fwd: Geological evidence for aquifer |
TREX-008627.PDF | Exhibit | 1.76 MB | 2013-11-07 | Email from K. Baker - P. Hsieh et al. re Science Call Follow-Up |
TREX-008627.2.PDF | Callout | 375.59 KB | 2013-11-07 | BP Callout from TREX-008627 |
TREX-008627.3.2.BP.PDF | Callout | 293.40 KB | 2013-11-07 | BP Callout from TREX-008627 |
TREX-008628.PDF | Exhibit | 55.42 MB | 2013-11-07 | PNNL, 07/30/10, unreviewed estimate - What is the effect of oil reservoir depletion? |
TREX-008628.58.1.BP.PDF | Callout | 283.75 KB | 2013-11-07 | BP Callout from TREX-008628 |
TREX-008628.7.1.BP.PDF | Callout | 265.50 KB | 2013-11-07 | BP Callout from TREX-008628 |
TREX-008631.PDF | Exhibit | 5.60 MB | 2013-11-07 | Well Integrity / Shut-in Discussion |
TREX-008634.PDF | Exhibit | 1.32 MB | 2013-11-07 | Analysis of shut-in pressure through 07/29/2010 |
TREX-008634.3.1.BP.PDF | Callout | 299.90 KB | 2013-11-07 | BP Callout from TREX-008634 |
TREX-008635.PDF | Exhibit | 39.97 MB | 2013-11-07 | Preecisional Draft of Flow Analysis Activities for the MC252 Well |
TREX-008635.74.1.BP.PDF | Callout | 333.76 KB | 2013-11-07 | BP Callout from TREX-008635 |
TREX-008635.96.1.BP.PDF | Callout | 337.90 KB | 2013-11-07 | BP Callout from TREX-008635 |
TREX-008635.96.3.BP.PDF | Callout | 347.46 KB | 2013-11-07 | BP Callout from TREX-008635 |
TREX-008635.97.1.BP.PDF | Callout | 364.43 KB | 2013-11-07 | BP Callout from TREX-008635 |
TREX-008639.PDF | Exhibit | 37.50 MB | 2013-11-07 | Depletion Analysis - USGS |
TREX-008639.10.PDF | Callout | 340.57 KB | 2013-11-07 | U.S. Callout from TREX-008639 |
TREX-008639.15.1.US.PDF | Callout | 387.73 KB | 2013-11-07 | U.S. Callout from TREX-008639 |
TREX-008639.9.PDF | Callout | 303.19 KB | 2013-11-07 | BP Callout from TREX-008639 |
TREX-008640.PDF | Exhibit | 2.53 MB | 2013-11-07 | PowerPoint slides titled History Matching" of shut-in pressure data |
TREX-008640.5.2.BP.PDF | Callout | 311.75 KB | 2013-11-07 | BP Callout from TREX-008640 |
TREX-008642.PDF | Exhibit | 5.58 MB | 2013-11-07 | Email from P. Hsieh - P. Flemings re reservoir volumes |
TREX-008642.1.1.BP.PDF | Callout | 259.59 KB | 2013-11-07 | BP Callout from TREX-008642 |
TREX-008642.2.PDF | Callout | 60.26 KB | 2013-11-07 | BP Callout from TREX-008642 |
TREX-008642.2.1.BP.PDF | Callout | 1,006.46 KB | 2013-11-07 | BP Callout from TREX-008642 |
TREX-008642.2.2.BP.PDF | Callout | 970.29 KB | 2013-11-07 | BP Callout from TREX-008642 |
TREX-008643.PDF | Exhibit | 313.24 KB | 2013-11-07 | Handwritten notes from meeting with Mike Levitan |
TREX-008643.1.PDF | Callout | 296.70 KB | 2013-11-07 | BP Callout from TREX-008643 |
TREX-008643.1.1.BP.PDF | Callout | 268.81 KB | 2013-11-07 | BP Callout from TREX-008643 |
TREX-008644.PDF | Exhibit | 4.78 MB | 2013-11-07 | Email from S. Chu - P. Hsieh re FW: IN LIEU OF DAILY WIT BP SCIENCE CALLS - Daily Well Integrity Updates and Information |
TREX-008644.1.1.BP.PDF | Callout | 279.64 KB | 2013-11-07 | BP Callout from TREX-008644 |
TREX-008644.15.1.BP.PDF | Callout | 914.56 KB | 2013-11-07 | BP Callout from TREX-008644 |
TREX-008645.PDF | Exhibit | 659.98 KB | 2013-11-07 | Email from S. Chu - P. Hsieh re Re: Rock compressibility |
TREX-008645.1.1.US.PDF | Callout | 419.06 KB | 2013-11-07 | U.S. Callout from TREX-008645 |
TREX-008645.1.2.BP.PDF | Callout | 280.28 KB | 2013-11-07 | BP Callout from TREX-008645 |
TREX-008647.PDF | Exhibit | 6.11 MB | 2013-11-07 | Email from M. Sogge - P. Hsieh re Draft report - MKS feedback |
TREX-008647.10.1.BP.PDF | Callout | 553.98 KB | 2013-11-07 | BP Callout from TREX-008647 |
TREX-008648.PDF | Exhibit | 14.84 MB | 2013-11-07 | Email from H. Essaid - P. Hsieh re Colleague Review |
TREX-008648.11.1.BP.PDF | Callout | 550.59 KB | 2013-11-07 | BP Callout from TREX-008648 |
TREX-008656.PDF | Exhibit | 316.51 KB | 2013-11-07 | Email from R. Marshall - G. Imm et al. re RE: Macondo flowing well rate |
TREX-008656.1.1.TO.PDF | Callout | 329.21 KB | 2013-11-07 | Transocean Callout from TREX-008656 |
TREX-008656.1.2.TO.PDF | Callout | 315.46 KB | 2013-11-07 | Transocean Callout from TREX-008656 |
TREX-008656.1.3.TO.PDF | Callout | 298.62 KB | 2013-11-07 | Transocean Callout from TREX-008656 |
TREX-008659.PDF | Exhibit | 18.50 MB | 2013-11-07 | Notes from meeting with Kelly McAughan |
TREX-008659.13.1.US.PDF | Callout | 438.18 KB | 2013-11-07 | U.S. Callout from TREX-008659 |
TREX-008660N.PDF | Exhibit | 13.83 MB | 2013-11-07 | Native Version of TREX-008660 |
TREX-008660N.7.1.US.PDF | Callout | 370.47 KB | 2013-11-07 | U.S. Callout from TREX-008660N |
TREX-008660N.8.1.US.PDF | Callout | 480.67 KB | 2013-11-07 | U.S. Callout from TREX-008660N |
TREX-008662.PDF | Exhibit | 1.68 MB | 2013-11-07 | Email from R. Dykhuizen - C. Morrow re RE: Flow Rate Calculation |
TREX-008662.1.1.BP.PDF | Callout | 342.36 KB | 2013-11-07 | BP Callout from TREX-008662 |
TREX-008727.PDF | Exhibit | 19.33 MB | 2013-11-07 | Macondo Post Drill |
TREX-008731.PDF | Exhibit | 6.67 MB | 2013-11-07 | Anadarko Macondo Prospect Offset Evaluation |
TREX-008770.PDF | Exhibit | 4.33 MB | 2013-11-07 | Email from J. Kurtz - K. McAughan et al. re RE: Compressibility |
TREX-008770.1.1.US.PDF | Callout | 505.20 KB | 2013-11-07 | U.S. Callout from TREX-008770 |
TREX-008770.1.2.US.PDF | Callout | 542.60 KB | 2013-11-07 | U.S. Callout from TREX-008770 |
TREX-008771.PDF | Exhibit | 317.73 KB | 2013-11-07 | Email from K. McAughan - S. Wilson re Macondo PVC |
TREX-008771.1.1.US.PDF | Callout | 463.03 KB | 2013-11-07 | U.S. Callout from TREX-008771 |
TREX-008772.PDF | Exhibit | 370.36 KB | 2013-11-07 | Email from K. McAughan - D. Schott re RE: Galapagos CMT tables |
TREX-008772.1.1.BP.PDF | Callout | 295.64 KB | 2013-11-07 | BP Callout from TREX-008772 |
TREX-008772.1.1.US.PDF | Callout | 453.11 KB | 2013-11-07 | U.S. Callout from TREX-008772 |
TREX-008772.1.4.US.PDF | Callout | 479.57 KB | 2013-11-07 | U.S. Callout from TREX-008772 |
TREX-008774.PDF | Exhibit | 651.96 KB | 2013-11-07 | Email from S. Wilson - D. Schott et al. re RE: Macondo PVC |
TREX-008774.1.1.US.PDF | Callout | 509.02 KB | 2013-11-07 | U.S. Callout from TREX-008774 |
TREX-008774.1.2.US.PDF | Callout | 426.20 KB | 2013-11-07 | U.S. Callout from TREX-008774 |
TREX-008774.1.3.US.PDF | Callout | 291.86 KB | 2013-11-07 | U.S. Callout from TREX-008774 |
TREX-008775.PDF | Exhibit | 1.11 MB | 2013-11-07 | Email from S. Wilson - R. Merrill et al. re Macondo RSWC PVC Comparison |
TREX-008775.1.1.US.PDF | Callout | 617.10 KB | 2013-11-07 | U.S. Callout from TREX-008775 |
TREX-008776.PDF | Exhibit | 1.77 MB | 2013-11-07 | Email from R. Merrill - S. Willson et al. re RE: Macondo RSWC PVC comparison |
TREX-008776.1.1.US.PDF | Callout | 510.63 KB | 2013-11-07 | U.S. Callout from TREX-008776 |
TREX-008776.1.2.US.PDF | Callout | 267.88 KB | 2013-11-07 | U.S. Callout from TREX-008776 |
TREX-008776.1.3.US.PDF | Callout | 323.80 KB | 2013-11-07 | U.S. Callout from TREX-008776 |
TREX-008777.PDF | Exhibit | 2.17 MB | 2013-11-07 | Email from K. McAughan - C. Harris et al. re RE: Rotary to whole core question-- PVC data |
TREX-008777.1.1.US.PDF | Callout | 377.79 KB | 2013-11-07 | U.S. Callout from TREX-008777 |
TREX-008794.PDF | Exhibit | 1.82 MB | 2013-11-07 | Email from J. Loos - D. Steele re RE: BP Macondo Prospect Rotary Inventory |
TREX-008794.1.1.US.PDF | Callout | 298.98 KB | 2013-11-07 | U.S. Callout from TREX-008794 |
TREX-008804.PDF | Exhibit | 58.37 MB | 2013-11-07 | Assessment of Flow Rate Estimates for the Deepwater Horizon / Macondo Well Oil Spill |
TREX-008809.PDF | Exhibit | 768.99 KB | 2013-11-07 | U.S. Scientific Teams Refine Estimates of Oil Flow from BP's Well Prior to Capping |
TREX-008809.1.1.BP.PDF | Callout | 348.94 KB | 2013-11-07 | BP Callout from TREX-008809 |
TREX-008975.PDF | Exhibit | 1.27 MB | 2013-11-07 | Evaulation of oil spill drill |
TREX-008975.1.1.BP.PDF | Callout | 265.51 KB | 2013-11-07 | BP Callout from TREX-008975 |
TREX-008975.1.3.BP.PDF | Callout | 295.12 KB | 2013-11-07 | BP Callout from TREX-008975 |
TREX-008975.1.4.BP.PDF | Callout | 281.08 KB | 2013-11-07 | BP Callout from TREX-008975 |
TREX-008975.1.5.BP.PDF | Callout | 294.20 KB | 2013-11-07 | BP Callout from TREX-008975 |
TREX-008975.2.1.BP.PDF | Callout | 545.41 KB | 2013-11-07 | BP Callout from TREX-008975 |
TREX-008975.2.3.BP.PDF | Callout | 545.71 KB | 2013-11-07 | BP Callout from TREX-008975 |
TREX-008975.2.4.BP.PDF | Callout | 539.98 KB | 2013-11-07 | BP Callout from TREX-008975 |
TREX-008975.2.5.BP.PDF | Callout | 318.68 KB | 2013-11-07 | BP Callout from TREX-008975 |
TREX-008975.3.2.BP.PDF | Callout | 249.27 KB | 2013-11-07 | BP Callout from TREX-008975 |
TREX-009050.PDF | Exhibit | 4.92 MB | 2013-11-07 | Summary of Standard Measurements |
TREX-009050.9.PDF | Callout | 515.28 KB | 2013-11-07 | BP Callout from TREX-009050 |
TREX-009056.PDF | Exhibit | 6.67 MB | 2013-11-07 | Rock Mechanics Final Report - Multi-Stage Triaxial Compressive Tests, Acoustic Velocities, Mohr-Coulomb Failure Analyses |
TREX-009056.9.1.BP.PDF | Callout | 308.36 KB | 2013-11-07 | BP Callout from TREX-009056 |
TREX-009067.PDF | Exhibit | 141.20 MB | 2013-11-07 | Pore Volume Compressibility Test - Pore Pressure Depletion |
TREX-009067.2.1.BP.PDF | Callout | 305.22 KB | 2013-11-07 | BP Callout from TREX-009067 |
TREX-009131.PDF | Exhibit | 1,017.77 KB | 2013-11-07 | Email from K. Baker - M. Mason et al. re FW: Questions for National Labs |
TREX-009131.1.1.BP.PDF | Callout | 278.93 KB | 2013-11-07 | BP Callout from TREX-009131 |
TREX-009131.3.1.BP.PDF | Callout | 959.26 KB | 2013-11-07 | BP Callout from TREX-009131 |
TREX-009132.PDF | Exhibit | 1.23 MB | 2013-11-07 | Email from K. Baker - B. Kirton et al. re Draft for your comment: summary points from the KWOP discussion |
TREX-009132.2.1.TO.PDF | Callout | 428.74 KB | 2013-11-07 | Transocean Callout from TREX-009132 |
TREX-009146.PDF | Exhibit | 306.70 KB | 2013-11-07 | Email from C. Browner - J. Messina et al. re Important News |
TREX-009146.1.2.BP.PDF | Callout | 496.74 KB | 2013-11-07 | BP Callout from TREX-009146 |
TREX-009146.1.3.BP.PDF | Callout | 291.51 KB | 2013-11-07 | BP Callout from TREX-009146 |
TREX-009146.1.8.BP.PDF | Callout | 302.80 KB | 2013-11-07 | BP Callout from TREX-009146 |
TREX-009146.1.9.BP.PDF | Callout | 298.81 KB | 2013-11-07 | BP Callout from TREX-009146 |
TREX-009146.1.BP.PDF | Callout | 153.97 KB | 2013-11-07 | BP Callout from TREX-009146 |
TREX-009148.PDF | Exhibit | 4.51 MB | 2013-11-07 | Macoondo Top Kill Procedure - Contingency: Aleternative LCM Pills |
TREX-009148.1.1.BP.PDF | Callout | 227.24 KB | 2013-11-07 | BP Callout from TREX-009148 |
TREX-009148.1.1.PSC.PDF | Callout | 215.30 KB | 2013-11-07 | PSC Callout from TREX-009148 |
TREX-009148.4.1.PSC.PDF | Callout | 219.18 KB | 2013-11-07 | PSC Callout from TREX-009148 |
TREX-009148.5.3.TO.PDF | Callout | 365.78 KB | 2013-11-07 | Transocean Callout from TREX-009148 |
TREX-009148.6.1.PSC.PDF | Callout | 222.55 KB | 2013-11-07 | PSC Callout from TREX-009148 |
TREX-009155.PDF | Exhibit | 1.29 MB | 2013-11-07 | Email from D. Suttles - M. Landry et al. re FW: 01090800.PDF - Adobe Reader |
TREX-009155.1.1.TO.Ballard.PDF | Callout | 337.38 KB | 2013-11-07 | Transocean Callout from TREX-009155 |
TREX-009155.1.1.TO.Wilson.PDF | Callout | 317.20 KB | 2013-11-07 | Transocean Callout from TREX-009155 |
TREX-009155.2.1.TO.PDF | Callout | 308.19 KB | 2013-11-07 | Transocean Callout from TREX-009155 |
TREX-009155.3.1.TO.PDF | Callout | 383.24 KB | 2013-11-07 | Transocean Callout from TREX-009155 |
TREX-009155.4.1.TO.Ballard.PDF | Callout | 312.67 KB | 2013-11-07 | Transocean Callout from TREX-009155 |
TREX-009155.4.1.TO.Wilson.PDF | Callout | 315.42 KB | 2013-11-07 | Transocean Callout from TREX-009155 |
TREX-009156.PDF | Exhibit | 10.31 MB | 2013-11-07 | Email from M. Mason - C. Yeilding et al. re FW: Meeting Presentation May 11 2010 (3).ppt |
TREX-009156.1.1.BP.PDF | Callout | 276.73 KB | 2013-11-07 | BP Callout from TREX-009156 |
TREX-009156.1.1.TO.PDF | Callout | 326.00 KB | 2013-11-07 | Transocean Callout from TREX-009156 |
TREX-009156.12.1.TO.PDF | Callout | 367.55 KB | 2013-11-07 | Transocean Callout from TREX-009156 |
TREX-009156.2.2.BP.PDF | Callout | 320.19 KB | 2013-11-07 | BP Callout from TREX-009156 |
TREX-009156.5.1.TO.Ballard.PDF | Callout | 453.03 KB | 2013-11-07 | Transocean Callout from TREX-009156 |
TREX-009156.5.1.TO.Wilson.PDF | Callout | 395.22 KB | 2013-11-07 | Transocean Callout from TREX-009156 |
TREX-009156.6.1.BP.PDF | Callout | 337.00 KB | 2013-11-07 | BP Callout from TREX-009156 |
TREX-009156.7.1.BP.PDF | Callout | 329.72 KB | 2013-11-07 | BP Callout from TREX-009156 |
TREX-009156.8.1.TO.PDF | Callout | 363.56 KB | 2013-11-07 | Transocean Callout from TREX-009156 |
TREX-009157.PDF | Exhibit | 5.22 MB | 2013-11-07 | Email from K. McAughan - B. Ritchie re WCD Plots Request |
TREX-009157.1.1.TO.Ballard.PDF | Callout | 314.27 KB | 2013-11-07 | Transocean Callout from TREX-009157 |
TREX-009157.1.1.TO.Wilson.PDF | Callout | 299.63 KB | 2013-11-07 | Transocean Callout from TREX-009157 |
TREX-009157.1.2.TO.PDF | Callout | 301.04 KB | 2013-11-07 | Transocean Callout from TREX-009157 |
TREX-009157.2.1.TO.PDF | Callout | 352.60 KB | 2013-11-07 | Transocean Callout from TREX-009157 |
TREX-009160.PDF | Exhibit | 695.84 KB | 2013-11-07 | Text re top kill failure |
TREX-009160.1.1.TO.PDF | Callout | 306.41 KB | 2013-11-07 | Transocean Callout from TREX-009160 |
TREX-009160.1.2.TO.PDF | Callout | 300.37 KB | 2013-11-07 | Transocean Callout from TREX-009160 |
TREX-009164.PDF | Exhibit | 2.69 MB | 2013-11-07 | Email from M. Mazzella - P. Tooms et al. re RE: BJ and Halli Data |
TREX-009164.1.1.TO.PDF | Callout | 323.77 KB | 2013-11-07 | Transocean Callout from TREX-009164 |
TREX-009164.2.1.TO.PDF | Callout | 359.19 KB | 2013-11-07 | Transocean Callout from TREX-009164 |
TREX-009245.PDF | Exhibit | 1.28 MB | 2013-11-07 | Email from K. Baker - B. Kirton et al. re Draft for your comment; summary points from the KWOP discussion |
TREX-009245.1.2.BP.PDF | Callout | 309.15 KB | 2013-11-07 | BP Callout from TREX-009245 |
TREX-009245.2.2.BP.PDF | Callout | 553.91 KB | 2013-11-07 | BP Callout from TREX-009245 |
TREX-009245.2.3.BP.PDF | Callout | 307.04 KB | 2013-11-07 | BP Callout from TREX-009245 |
TREX-009245.2.4.BP.PDF | Callout | 348.34 KB | 2013-11-07 | BP Callout from TREX-009245 |
TREX-009245.2.5.BP.PDF | Callout | 317.93 KB | 2013-11-07 | BP Callout from TREX-009245 |
TREX-009245.2.8.BP.PDF | Callout | 320.09 KB | 2013-11-07 | BP Callout from TREX-009245 |
TREX-009250.PDF | Exhibit | 4.99 MB | 2013-11-07 | Email from D. Wood - T. Hill et al. re RE: Pressure build-up |
TREX-009250.1.1.TO.Adams.PDF | Callout | 342.99 KB | 2013-11-07 | Transocean Callout from TREX-009250 |
TREX-009250.1.1.TO.Ballard.PDF | Callout | 372.04 KB | 2013-11-07 | Transocean Callout from TREX-009250 |
TREX-009250.1.2.TO.Ballard.PDF | Callout | 335.94 KB | 2013-11-07 | Transocean Callout from TREX-009250 |
TREX-009250.1.2.TO.Wilson.PDF | Callout | 403.17 KB | 2013-11-07 | Transocean Callout from TREX-009250 |
TREX-009250.2.1.TO.PDF | Callout | 383.59 KB | 2013-11-07 | Transocean Callout from TREX-009250 |
TREX-009250.2.2.TO.PDF | Callout | 396.25 KB | 2013-11-07 | Transocean Callout from TREX-009250 |
TREX-009261.PDF | Exhibit | 1.36 MB | 2013-11-07 | Email from O. Rygg - K. Mix et al. re Flow and kill sensitivity - restricted inflow from the oil zone |
TREX-009266.PDF | Exhibit | 590.38 KB | 2013-11-07 | Email from O. Rygg - K. Mix re blowout Rates |
TREX-009266.1.1.TO.PDF | Callout | 288.96 KB | 2013-11-07 | Transocean Callout from TREX-009266 |
TREX-009266.2.1.BP.PDF | Callout | 306.59 KB | 2013-11-07 | BP Callout from TREX-009266 |
TREX-009266.2.1.TO.PDF | Callout | 347.97 KB | 2013-11-07 | Transocean Callout from TREX-009266 |
TREX-009278.PDF | Exhibit | 1.93 MB | 2013-11-07 | Email from B. Ritchie - C. Yeilding et al. re FW: GoM aquifer sizes |
TREX-009278.1.1.US.PDF | Callout | 482.30 KB | 2013-11-07 | U.S. Callout from TREX-009278 |
TREX-009278.1.2.US.PDF | Callout | 194.61 KB | 2013-11-07 | U.S. Callout from TREX-009278 |
TREX-009283.43.PDF | Callout | 306.27 KB | 2013-11-07 | BP Callout from TREX-009283 |
TREX-009312.PDF | Exhibit | 649.57 KB | 2013-11-07 | Email from J. Peijs - I. Conn et al. re Re: Macondo formation pressure |
TREX-009313.PDF | Exhibit | 6.49 MB | 2013-11-07 | Email from M. Mason - G. Birrell et al. re FW: Macondo SIWHP Build-up Rate Final Report.doc |
TREX-009313.1.1.BP.PDF | Callout | 112.55 KB | 2013-11-07 | BP Callout from TREX-009313 |
TREX-009313.1.1.TO.PDF | Callout | 327.97 KB | 2013-11-07 | Transocean Callout from TREX-009313 |
TREX-009318.PDF | Exhibit | 2.98 MB | 2013-11-07 | Email from R. Merrill - B. Thurmond et al. re Bob_Match_25July-ML review Final.ppt |
TREX-009318.1.1.BP.PDF | Callout | 293.25 KB | 2013-11-07 | BP Callout from TREX-009318 |
TREX-009318.10.PDF | Callout | 330.77 KB | 2013-11-07 | U.S. Callout from TREX-009318 |
TREX-009318.10.1.US.PDF | Callout | 346.19 KB | 2013-11-07 | U.S. Callout from TREX-009318 |
TREX-009318.4.1.BP.PDF | Callout | 301.99 KB | 2013-11-07 | BP Callout from TREX-009318 |
TREX-009318.4.1.US.PDF | Callout | 419.95 KB | 2013-11-07 | U.S. Callout from TREX-009318 |
TREX-009318.6.1.US.PDF | Callout | 442.86 KB | 2013-11-07 | U.S. Callout from TREX-009318 |
TREX-009318.8.PDF | Callout | 354.26 KB | 2013-11-07 | U.S. Callout from TREX-009318 |
TREX-009318.8.1.BP.PDF | Callout | 298.02 KB | 2013-11-07 | BP Callout from TREX-009318 |
TREX-009318.8.1.US.PDF | Callout | 416.88 KB | 2013-11-07 | U.S. Callout from TREX-009318 |
TREX-009320.PDF | Exhibit | 16.74 MB | 2013-11-07 | Email from T. Liao - K. Mix et al. re FW: BOP Pressure... |
TREX-009320.1.1.US.PDF | Callout | 474.26 KB | 2013-11-07 | U.S. Callout from TREX-009320 |
TREX-009320.17.1.US.PDF | Callout | 319.88 KB | 2013-11-07 | U.S. Callout from TREX-009320 |
TREX-009320.25.1.US.PDF | Callout | 479.36 KB | 2013-11-07 | U.S. Callout from TREX-009320 |
TREX-009324.PDF | Exhibit | 26.48 MB | 2013-11-07 | Email from K. Baker - M. Tatro et al. re RE: today's presentation |
TREX-009324.1.1.US.PDF | Callout | 325.66 KB | 2013-11-07 | U.S. Callout from TREX-009324 |
TREX-009324.16.PDF | Callout | 237.40 KB | 2013-11-07 | U.S. Callout from TREX-009324 |
TREX-009324.17.PDF | Callout | 311.14 KB | 2013-11-07 | BP Callout from TREX-009324 |
TREX-009324.17.1.US.PDF | Callout | 494.75 KB | 2013-11-07 | U.S. Callout from TREX-009324 |
TREX-009324.3.PDF | Callout | 257.38 KB | 2013-11-07 | BP Callout from TREX-009324 |
TREX-009330.PDF | Exhibit | 57.89 MB | 2013-11-07 | Email from K. McAughan - J. Peijs et al. re RE: WCD Plots |
TREX-009330.1.1.TO.Ballard.PDF | Callout | 328.49 KB | 2013-11-07 | Transocean Callout from TREX-009330 |
TREX-009330.1.1.TO.Wilson.PDF | Callout | 324.88 KB | 2013-11-07 | Transocean Callout from TREX-009330 |
TREX-009330.3.1.TO.PDF | Callout | 394.38 KB | 2013-11-07 | Transocean Callout from TREX-009330 |
TREX-009353.PDF | Exhibit | 588.76 KB | 2013-11-07 | Notice of Top Kill |
TREX-009361.PDF | Exhibit | 35.14 MB | 2013-11-07 | Sandia Report - DOE-NNSA Flow Analysis Studies Associated with the Oil Release following the Deepwater Horizon Accident |
TREX-009361.1.PDF | Callout | 377.29 KB | 2013-11-07 | BP Callout from TREX-009361 |
TREX-009361.13.5.BP.PDF | Callout | 326.20 KB | 2013-11-07 | BP Callout from TREX-009361 |
TREX-009361.13.6.BP.PDF | Callout | 320.36 KB | 2013-11-07 | BP Callout from TREX-009361 |
TREX-009361.13.7.BP.PDF | Callout | 334.00 KB | 2013-11-07 | BP Callout from TREX-009361 |
TREX-009361.24.1.BP.PDF | Callout | 334.93 KB | 2013-11-07 | BP Callout from TREX-009361 |
TREX-009361.46.PDF | Callout | 373.66 KB | 2013-11-07 | BP Callout from TREX-009361 |
TREX-009361.49.1.BP.PDF | Callout | 353.39 KB | 2013-11-07 | BP Callout from TREX-009361 |
TREX-009361.71.PDF | Callout | 281.86 KB | 2013-11-07 | BP Callout from TREX-009361 |
TREX-009361.71.1.BP.PDF | Callout | 308.72 KB | 2013-11-07 | BP Callout from TREX-009361 |
TREX-009368.PDF | Exhibit | 2.16 MB | 2013-11-07 | Email from M. Havstad - R. Dykhuizen et al. re RE: flow variation calibration of total flow |
TREX-009368.1.2.BP.PDF | Callout | 281.04 KB | 2013-11-07 | BP Callout from TREX-009368 |
TREX-009375.PDF | Exhibit | 690.72 KB | 2013-11-07 | Email from A. Ratzel - R. Dykhuizen et al. re write-up |
TREX-009375.1.5.BP.PDF | Callout | 287.98 KB | 2013-11-07 | BP Callout from TREX-009375 |
TREX-009375.1.6.BP.PDF | Callout | 304.95 KB | 2013-11-07 | BP Callout from TREX-009375 |
TREX-009376.PDF | Exhibit | 794.87 KB | 2013-11-07 | Impact of Capping Stack on Well Flow Rate |
TREX-009376.1.2.BP.PDF | Callout | 281.58 KB | 2013-11-07 | BP Callout from TREX-009376 |
TREX-009376.2.5.BP.PDF | Callout | 269.06 KB | 2013-11-07 | BP Callout from TREX-009376 |
TREX-009376.2.6.BP.PDF | Callout | 287.74 KB | 2013-11-07 | BP Callout from TREX-009376 |
TREX-009379.PDF | Exhibit | 406.79 KB | 2013-11-07 | Email from A. Ratzel - R. Dykhuizen et al. re Ratzel hopefully final draft of flow report |
TREX-009379.1.2.BP.PDF | Callout | 321.73 KB | 2013-11-07 | BP Callout from TREX-009379 |
TREX-009388.PDF | Exhibit | 272.33 KB | 2013-11-07 | Email from R. Dykhuizen - S. Tieszen et al. re food for thought. |
TREX-009388.1.1.BP.PDF | Callout | 338.58 KB | 2013-11-07 | BP Callout from TREX-009388 |
TREX-009389.PDF | Exhibit | 922.37 KB | 2013-11-07 | Flow Uncertainty Position |
TREX-009389.1.1.BP.PDF | Callout | 472.67 KB | 2013-11-07 | BP Callout from TREX-009389 |
TREX-009389.2.1.BP.PDF | Callout | 432.96 KB | 2013-11-07 | BP Callout from TREX-009389 |
TREX-009412.PDF | Exhibit | 675.66 KB | 2013-11-07 | Email from B. Looney - R. Dudley et al. re FW: BOP on BOP" / Containment" |
TREX-009412.1.2.BP.PDF | Callout | 290.61 KB | 2013-11-07 | BP Callout from TREX-009412 |
TREX-009412.2.3.BP.PDF | Callout | 138.14 KB | 2013-11-07 | BP Callout from TREX-009412 |
TREX-009412.2.7.BP.PDF | Callout | 279.36 KB | 2013-11-07 | BP Callout from TREX-009412 |
TREX-009446.PDF | Exhibit | 13.91 MB | 2013-11-07 | Email from T. Lockett - T. Hill re Best estimate |
TREX-009446.1.1.BP.PDF | Callout | 290.33 KB | 2013-11-07 | BP Callout from TREX-009446 |
TREX-009446.1.1.TO.PDF | Callout | 327.06 KB | 2013-11-07 | Transocean Callout from TREX-009446 |
TREX-009446.1.2.TO.PDF | Callout | 620.19 KB | 2013-11-07 | Transocean Callout from TREX-009446 |
TREX-009452.PDF | Exhibit | 20.40 MB | 2013-11-07 | Email from T. Lockett - T. Hill re Top kill simulation cases |
TREX-009452.1.1.US.PDF | Callout | 548.85 KB | 2013-11-07 | U.S. Callout from TREX-009452 |
TREX-009452.2.1.US.PDF | Callout | 436.23 KB | 2013-11-07 | U.S. Callout from TREX-009452 |
TREX-009452.9.1.US.PDF | Callout | 499.49 KB | 2013-11-07 | U.S. Callout from TREX-009452 |
TREX-009474.PDF | Exhibit | 954.18 KB | 2013-11-07 | Email from T. Hill - F. Saidi re RE: Update |
TREX-009474.1.2.TO.PDF | Callout | 312.71 KB | 2013-11-07 | Transocean Callout from TREX-009474 |
TREX-009475.PDF | Exhibit | 4.76 MB | 2013-11-07 | Email from M. Brown - P. Maule et al. re RE: MC 252 Fluid composition |
TREX-009475.1.1.TO.PDF | Callout | 310.88 KB | 2013-11-07 | Transocean Callout from TREX-009475 |
TREX-009475.1.2.TO.PDF | Callout | 301.79 KB | 2013-11-07 | Transocean Callout from TREX-009475 |
TREX-009475.2.1.TO.PDF | Callout | 365.89 KB | 2013-11-07 | Transocean Callout from TREX-009475 |
TREX-009475.3.1.TO.Ballard.PDF | Callout | 357.23 KB | 2013-11-07 | Transocean Callout from TREX-009475 |
TREX-009475.3.1.TO.Wilson.PDF | Callout | 345.45 KB | 2013-11-07 | Transocean Callout from TREX-009475 |
TREX-009475.3.2.TO.PDF | Callout | 337.71 KB | 2013-11-07 | Transocean Callout from TREX-009475 |
TREX-009475.5.1.TO.PDF | Callout | 370.59 KB | 2013-11-07 | Transocean Callout from TREX-009475 |
TREX-009573.PDF | Exhibit | 5.01 MB | 2013-11-07 | BSEE MWCC Shell Capping Drill, 24-31 July 2012 |
TREX-009575.PDF | Exhibit | 311.97 MB | 2013-11-07 | GoM Drilling, Completions and Interventions - Technical Assurance Report Well Cap with Triple-Ram Stack |
TREX-009575.1.PDF | Callout | 145.61 KB | 2013-11-07 | BP Callout from TREX-009575 |
TREX-009575.1.1.TO.PDF | Callout | 418.16 KB | 2013-11-07 | Transocean Callout from TREX-009575 |
TREX-009575.1.2.BP.PDF | Callout | 581.98 KB | 2013-11-07 | BP Callout from TREX-009575 |
TREX-009575.11.1.TO.PDF | Callout | 512.82 KB | 2013-11-07 | Transocean Callout from TREX-009575 |
TREX-009575.160.1.BP.PDF | Callout | 149.26 KB | 2013-11-07 | BP Callout from TREX-009575 |
TREX-009575.175.1.BP.PDF | Callout | 205.57 KB | 2013-11-07 | BP Callout from TREX-009575 |
TREX-009575.175.2.BP.PDF | Callout | 852.88 KB | 2013-11-07 | BP Callout from TREX-009575 |
TREX-009575.36.2.TO.PDF | Callout | 484.37 KB | 2013-11-07 | Transocean Callout from TREX-009575 |
TREX-009575.36.4.TO_TREX-140563.4.2N.TO_SPLITSCREEN.PDF | Callout | 2.04 MB | 2013-11-07 | Transocean Split-Screen Callout from TREX-009575 and TREX-140563 |
TREX-009575.457.1.TO.PDF | Callout | 405.44 KB | 2013-11-07 | Transocean Callout from TREX-009575 |
TREX-009575.512.1.TO.PDF | Callout | 420.83 KB | 2013-11-07 | Transocean Callout from TREX-009575 |
TREX-009575.518.1.TO.PDF | Callout | 290.26 KB | 2013-11-07 | Transocean Callout from TREX-009575 |
TREX-009575.519.1.TO.PDF | Callout | 424.85 KB | 2013-11-07 | Transocean Callout from TREX-009575 |
TREX-009575.520.1.TO.PDF | Callout | 404.81 KB | 2013-11-07 | Transocean Callout from TREX-009575 |
TREX-009577.PDF | Exhibit | 7.16 MB | 2013-11-07 | Log of events during Well Integity Test |
TREX-009583.PDF | Exhibit | 2.23 MB | 2013-11-07 | Valve Operation Register |
TREX-009628.PDF | Exhibit | 505.70 KB | 2013-11-07 | Handwritten notes re Doug Suttles' 04/28/2010 flow rate estimate |
TREX-009628.1.1.TO.PDF | Callout | 261.52 KB | 2013-11-07 | Transocean Callout from TREX-009628 |
TREX-009671.PDF | Exhibit | 2.03 MB | 2013-11-07 | Email from M. McNutt - T. Hunsaker et al. re Re: tom hunter feedback on new data |
TREX-009671.1.1.BP.PDF | Callout | 310.89 KB | 2013-11-07 | BP Callout from TREX-009671 |
TREX-009671.2.1.BP.PDF | Callout | 314.83 KB | 2013-11-07 | BP Callout from TREX-009671 |
TREX-009671.3.1.BP.PDF | Callout | 357.42 KB | 2013-11-07 | BP Callout from TREX-009671 |
TREX-009692.PDF | Exhibit | 4.48 MB | 2013-11-07 | Estimates of Conditions in the Gulf |
TREX-009692.3.2.BP.PDF | Callout | 286.94 KB | 2013-11-07 | BP Callout from TREX-009692 |
TREX-009696.PDF | Exhibit | 600.16 KB | 2013-11-07 | Email from C. Verchere - S. Chu et al. re RE: Deepwater Horizon slide pack - May 31st 2010 |
TREX-009696.1.1.BP.PDF | Callout | 287.65 KB | 2013-11-07 | BP Callout from TREX-009696 |
TREX-009696.1.2.BP.PDF | Callout | 72.72 KB | 2013-11-07 | BP Callout from TREX-009696 |
TREX-009696.1.3.BP.PDF | Callout | 275.14 KB | 2013-11-07 | BP Callout from TREX-009696 |
TREX-009706.PDF | Exhibit | 9.65 MB | 2013-11-07 | Flow Modeling Activities: Team Review with Tom Hunter |
TREX-009706.1.PDF | Callout | 282.96 KB | 2013-11-07 | BP Callout from TREX-009706 |
TREX-009706.26.1.BP.PDF | Callout | 329.45 KB | 2013-11-07 | BP Callout from TREX-009706 |
TREX-009706.4.PDF | Callout | 338.10 KB | 2013-11-07 | BP Callout from TREX-009706 |
TREX-009706.5.PDF | Callout | 422.13 KB | 2013-11-07 | BP Callout from TREX-009706 |
TREX-009709.PDF | Exhibit | 360.76 KB | 2013-11-07 | Email from S. Aoki - R. O'Connor re FW: Follow-up press question on Gulf |
TREX-009709.1.2.BP.PDF | Callout | 292.87 KB | 2013-11-07 | BP Callout from TREX-009709 |
TREX-009710.PDF | Exhibit | 1.14 MB | 2013-11-07 | Email from D. Decroix - wxg@lanl.gov re Re: Fwd: Further on the NIC Flow Rate Working Group and their request for lab support |
TREX-009710.1.2.BP.PDF | Callout | 329.88 KB | 2013-11-07 | BP Callout from TREX-009710 |
TREX-009710.1.3.BP.PDF | Callout | 294.65 KB | 2013-11-07 | BP Callout from TREX-009710 |
TREX-009718.PDF | Exhibit | 803.65 KB | 2013-11-07 | Email from T. Hunsaker - S. Chu et al. re Re: Brief summary for tomorrow/whenever |
TREX-009718.1.1.BP.PDF | Callout | 310.18 KB | 2013-11-07 | BP Callout from TREX-009718 |
TREX-009718.1.2.BP.PDF | Callout | 315.07 KB | 2013-11-07 | BP Callout from TREX-009718 |
TREX-009725.PDF | Exhibit | 732.54 KB | 2013-11-07 | Handwritten notes of Curt Oldenburg re FRTG telecon |
TREX-009725.2.1.BP.PDF | Callout | 279.66 KB | 2013-11-07 | BP Callout from TREX-009725 |
TREX-009732.PDF | Exhibit | 3.87 MB | 2013-11-07 | Email from K. Baker - C. Ammerman et al. re FW: Black Oil Tables from EoS for All Temps 11June2010.xls |
TREX-009732.1.1.US.PDF | Callout | 332.62 KB | 2013-11-07 | U.S. Callout from TREX-009732 |
TREX-009732.11_12.1.US.PDF | Callout | 632.92 KB | 2013-11-07 | U.S. Callout from TREX-009732 |
TREX-009734.PDF | Exhibit | 48.93 MB | 2013-11-07 | Email from E. Shtepani - Y. Wang et al. re MST report |
TREX-009734.20.PDF | Callout | 264.23 KB | 2013-11-07 | BP Callout from TREX-009734 |
TREX-009767.PDF | Exhibit | 9.95 MB | 2013-11-07 | Macondo data summary Powerpoint |
TREX-009767.19.PDF | Callout | 319.99 KB | 2013-11-07 | BP Callout from TREX-009767 |
TREX-009800.PDF | Exhibit | 12.11 MB | 2013-11-07 | Email from T. Smith - P. Anderson et al. re 2010-06-10 Flex Joint Overshot Review Rev0.ppt |
TREX-009800.1.1.BP.PDF | Callout | 160.46 KB | 2013-11-07 | BP Callout from TREX-009800 |
TREX-009800.4.1.BP.PDF | Callout | 353.95 KB | 2013-11-07 | BP Callout from TREX-009800 |
TREX-009800.8.1.BP.PDF | Callout | 299.48 KB | 2013-11-07 | BP Callout from TREX-009800 |
TREX-009806.PDF | Exhibit | 7.89 MB | 2013-11-07 | Email from T. Smith - S. Bond et al. re RE: Draft Agenda for 9 AM call June 18 - Action - Need answers for Secretary Chu's questions!, with attachments |
TREX-009827.PDF | Exhibit | 2.07 MB | 2013-11-07 | Best Available Technology (BAT) Analysis - Well Blowout Source Control |
TREX-009827.1.1.HESI.PDF | Callout | 864.04 KB | 2013-11-07 | Halliburton Callout from TREX-009827 |
TREX-009833.PDF | Exhibit | 308.36 KB | 2013-11-07 | Email from J. Wellings - J. Schwebel re RE: 3 Ram Stack |
TREX-009859.PDF | Exhibit | 8.92 MB | 2013-11-07 | Appendix C.1 Kelkar Report |
TREX-009859.17.PDF | Callout | 367.30 KB | 2013-11-07 | BP Callout from TREX-009859 |
TREX-009859.19.PDF | Callout | 346.41 KB | 2013-11-07 | BP Callout from TREX-009859 |
TREX-009859.19.2.BP.PDF | Callout | 337.00 KB | 2013-11-07 | BP Callout from TREX-009859 |
TREX-009906.PDF | Exhibit | 1.63 MB | 2013-11-07 | Notes on FRT Conference Call, July 30, 2010 |
TREX-009906.3.3.BP.PDF | Callout | 380.79 KB | 2013-11-07 | BP Callout from TREX-009906 |
TREX-009908.PDF | Exhibit | 1.24 MB | 2013-11-07 | Email fom J. Borghei - T. Hunsaker et al. re Re: containment report |
TREX-009908.2.2.BP.PDF | Callout | 371.04 KB | 2013-11-07 | BP Callout from TREX-009908 |
TREX-009916.PDF | Exhibit | 2.89 MB | 2013-11-07 | Email from D. Keese - R. Garwin et al. re RE: Ball bearing impedance for more margin |
TREX-009916.3.1.US.PDF | Callout | 409.90 KB | 2013-11-07 | U.S. Callout from TREX-009916 |
TREX-009916.4.1.US.PDF | Callout | 450.04 KB | 2013-11-07 | U.S. Callout from TREX-009916 |
TREX-009924.PDF | Exhibit | 1.02 MB | 2013-11-07 | Email from R. Dykhuizen - M. Tatro et al. re writeup |
TREX-009924.1.1.BP.PDF | Callout | 289.65 KB | 2013-11-07 | BP Callout from TREX-009924 |
TREX-009924.3.2.BP.PDF | Callout | 275.53 KB | 2013-11-07 | BP Callout from TREX-009924 |
TREX-009929.PDF | Exhibit | 278.92 MB | 2013-11-07 | Handwritten Notes by Tom Hunter |
TREX-009929.95.PDF | Callout | 268.14 KB | 2013-11-07 | BP Callout from TREX-009929 |
TREX-009940.PDF | Exhibit | 10.29 MB | 2013-11-07 | Email from J. Sharadin - J. Lott et al. re New Plan |
TREX-009943.PDF | Exhibit | 1.99 MB | 2013-11-07 | Email from M. Mullen - B.Kirton et al. re Kill Plot & plan.ppt |
TREX-009946.PDF | Exhibit | 7.66 MB | 2013-11-07 | Wild Well Control Project Memo |
TREX-009947.PDF | Exhibit | 2.50 MB | 2013-11-07 | Email from R. Quitzau - W. Burch re RE: M56E Post-Blowout Fracture Pressure Question |
TREX-009948.PDF | Exhibit | 2.62 MB | 2013-11-07 | Email from W. Burch - K. Mix et al. re Dual Relief Well Strategy (Due by Noon) |
TREX-010031.PDF | Exhibit | 3.87 MB | 2013-11-07 | Environmental Science & Technology - Oil Release from Macondo Well MC252 Following the Deepwater Horizon Accident |
TREX-010072.PDF | Exhibit | 2.14 MB | 2013-11-07 | Email from D. King - M. Whitby et al. re Re: Update 29May10 |
TREX-010072.1.1.HESI.PDF | Callout | 595.29 KB | 2013-11-07 | Halliburton Callout from TREX-010072 |
TREX-010072.3.1.HESI.PDF | Callout | 851.02 KB | 2013-11-07 | Halliburton Callout from TREX-010072 |
TREX-010072.3.2.HESI.PDF | Callout | 914.66 KB | 2013-11-07 | Halliburton Callout from TREX-010072 |
TREX-010072.4.1.HESI.PDF | Callout | 822.31 KB | 2013-11-07 | Halliburton Callout from TREX-010072 |
TREX-010208.PDF | Exhibit | 1.34 MB | 2013-11-07 | Current status offshore |
TREX-010267.PDF | Exhibit | 1.76 MB | 2013-11-07 | Email from S. Timmons - T. Smith et al. re Draft - Subsea Containment Section of Oil Spill Response Plan |
TREX-010333.PDF | Exhibit | 3.06 MB | 2013-11-07 | Email from S. Khanna - T. Lockett et al. re RE: Plumes |
TREX-010346.PDF | Exhibit | 55.40 MB | 2013-11-07 | Email from T. Hill - A. Leonard et al. re RE: Flow rate periods, with attachments |
TREX-010347.17.1.PSC.PDF | Callout | 193.41 KB | 2013-11-07 | PSC Callout from TREX-010347 |
TREX-010358.PDF | Exhibit | 6.97 MB | 2013-11-07 | Letter from R. Bailey - E. Markey et al. re Response to Chairman Markey's Correspondence, Dated May 14, 2010, to Mr. Lamar McKay, President and CEO of BP America, Inc. |
TREX-010366.PDF | Exhibit | 1.52 MB | 2013-11-07 | Annotated Index for Notebook -- Temperature Measurements or Attempted Measurements |
TREX-010374.PDF | Exhibit | 680.16 KB | 2013-11-07 | Email from T. Lockett - T. Hill et al. re RE: ACTION: Need predicted/measured BOP temperatures for Q4000 design |
TREX-010483.PDF | Exhibit | 921.63 KB | 2013-11-07 | Email from W. Burch - C. Murphy et al. re 042110 - Notes from BP Reservoir/Geology Group (WWCI 2010-116) |
TREX-010483.1.1.US.PDF | Callout | 445.72 KB | 2013-11-07 | U.S. Callout from TREX-010483 |
TREX-010483.1.2.US.PDF | Callout | 391.24 KB | 2013-11-07 | U.S. Callout from TREX-010483 |
TREX-010505.PDF | Exhibit | 43.40 MB | 2013-11-07 | Email from P. Tooms - H. Thierens re FW: Top Preventer Peer Assist Recommendations, with attachments |
TREX-010505.15.1.TO.PDF | Callout | 338.85 KB | 2013-11-07 | Transocean Callout from TREX-010505 |
TREX-010505.25.1.TO.PDF | Callout | 336.90 KB | 2013-11-07 | Transocean Callout from TREX-010505 |
TREX-010505.5.1.TO.PDF | Callout | 372.73 KB | 2013-11-07 | Transocean Callout from TREX-010505 |
TREX-010505.5.2.TO.PDF | Callout | 339.29 KB | 2013-11-07 | Transocean Callout from TREX-010505 |
TREX-010506.PDF | Exhibit | 1.74 MB | 2013-11-07 | MC 252 Junk Shot Peer Assist - 6 May 2010 -Report of Findings |
TREX-010506.1.1.PSC.PDF | Callout | 171.89 KB | 2013-11-07 | PSC Callout from TREX-010506 |
TREX-010506.3.1.PSC.PDF | Callout | 227.80 KB | 2013-11-07 | PSC Callout from TREX-010506 |
TREX-010506.4.1.PSC.PDF | Callout | 225.78 KB | 2013-11-07 | PSC Callout from TREX-010506 |
TREX-010522.PDF | Exhibit | 52.28 MB | 2013-11-07 | Email from J. Turnbull - J. Wellings et al. re Top Preventer Peer Assist Recommendations |
TREX-010522.1.1.BP.PDF | Callout | 280.38 KB | 2013-11-07 | BP Callout from TREX-010522 |
TREX-010522.1.4.BP.PDF | Callout | 270.98 KB | 2013-11-07 | BP Callout from TREX-010522 |
TREX-010522.33.1.BP.PDF | Callout | 353.10 KB | 2013-11-07 | BP Callout from TREX-010522 |
TREX-010522.33.2.BP.PDF | Callout | 326.71 KB | 2013-11-07 | BP Callout from TREX-010522 |
TREX-010522.39.2.BP.PDF | Callout | 339.09 KB | 2013-11-07 | BP Callout from TREX-010522 |
TREX-010522.40.1.BP.PDF | Callout | 278.56 KB | 2013-11-07 | BP Callout from TREX-010522 |
TREX-010522.50.1.BP.PDF | Callout | 306.34 KB | 2013-11-07 | BP Callout from TREX-010522 |
TREX-010561.PDF | Exhibit | 1.47 MB | 2013-11-07 | Email from K. Cook - P. Little et al. re ISPR |
TREX-010562.PDF | Exhibit | 1.29 MB | 2013-11-07 | Email from T. Allen - K. Cook et al. re NIC Top Kill Progress Report #15 |
TREX-010566.PDF | Exhibit | 629.78 KB | 2013-11-07 | Letter from J. Watson - D. Suttles |
TREX-010603.PDF | Exhibit | 12.88 MB | 2013-11-07 | Email from W. Burch - K. Mix et al. re Dynamic Kill Technical Fact Note |
TREX-010647.PDF | Exhibit | 712.68 KB | 2013-11-07 | Email from T. Lockett to T. Hill et al. re RE: CFD Heat Transfer Model Case 30a - 10,000 bdp flow to assess Hydrates via CFD of BOP stack placement |
TREX-010647.1.2.BP.PDF | Callout | 290.06 KB | 2013-11-07 | BP Callout from TREX-010647 |
TREX-010647.2.2.BP.PDF | Callout | 271.28 KB | 2013-11-07 | BP Callout from TREX-010647 |
TREX-010650.PDF | Exhibit | 2.85 MB | 2013-11-07 | Email from T. Lockett to T. Hill re RE: Plume pics_with measurements |
TREX-010650.1.1.US.PDF | Callout | 547.04 KB | 2013-11-07 | U.S. Callout from TREX-010650 |
TREX-010650.2.1.BP.PDF | Callout | 285.44 KB | 2013-11-07 | BP Callout from TREX-010650 |
TREX-010658.PDF | Exhibit | 2.16 MB | 2013-11-07 | Email from T. Lockett to F. Saidi re RE: Re: Olga Model input |
TREX-010658.1.1.US.PDF | Callout | 410.90 KB | 2013-11-07 | U.S. Callout from TREX-010658 |
TREX-010807.PDF | Exhibit | 329.60 KB | 2013-11-07 | Email from F. Saidi - S. Girrens et al. re RE: Choke side and kill side Drawings |
TREX-010835.PDF | Exhibit | 2.84 MB | 2013-11-07 | Exploration and Production Technology Technical Memo - Impact of well shut-in and flow out of the 18 shoe" |
TREX-010839.PDF | Exhibit | 49.92 MB | 2013-11-07 | Email from R. Merrill to K. Baker, et al. re Depletion Review with James Dupree |
TREX-010839.19.1.US.PDF | Callout | 490.39 KB | 2013-11-07 | U.S. Callout from TREX-010839 |
TREX-010839.31.PDF | Callout | 406.71 KB | 2013-11-07 | U.S. Callout from TREX-010839 |
TREX-010841.PDF | Exhibit | 11.83 MB | 2013-11-07 | Reservoir Pressure Response |
TREX-010841.22.1.US.PDF | Callout | 410.03 KB | 2013-11-07 | U.S. Callout from TREX-010841 |
TREX-010841.23.1.US.PDF | Callout | 404.93 KB | 2013-11-07 | U.S. Callout from TREX-010841 |
TREX-010841.38.PDF | Callout | 393.24 KB | 2013-11-07 | U.S. Callout from TREX-010841 |
TREX-010841N.PDF | Exhibit | 6.92 MB | 2013-11-07 | Native Version of TREX-010841 |
TREX-010841N.1.PDF | Callout | 255.34 KB | 2013-11-07 | BP Callout from TREX-010841N |
TREX-010841N.3.1.BP.PDF | Callout | 313.33 KB | 2013-11-07 | BP Callout from TREX-010841N |
TREX-010845.PDF | Exhibit | 5.39 MB | 2013-11-07 | Well Integrity Test Data Review |
TREX-010845.1.PDF | Callout | 262.82 KB | 2013-11-07 | BP Callout from TREX-010845 |
TREX-010845.10.PDF | Callout | 262.56 KB | 2013-11-07 | BP Callout from TREX-010845 |
TREX-010845.11.PDF | Callout | 273.36 KB | 2013-11-07 | BP Callout from TREX-010845 |
TREX-010855.PDF | Exhibit | 2.70 MB | 2013-11-07 | Email from W. Bozeman - K. Mix et al. re Macondo Info |
TREX-010859.PDF | Exhibit | 760.91 KB | 2013-11-07 | BP Macondo Technical Note - Depleted Pressure, Version A - Draft |
TREX-010859.1.1.BP.PDF | Callout | 307.81 KB | 2013-11-07 | BP Callout from TREX-010859 |
TREX-010924.PDF | Exhibit | 37.35 MB | 2013-11-07 | Email from R. Merrill to M. Levitan re Please Review |
TREX-010924.1.1.BP.PDF | Callout | 307.54 KB | 2013-11-07 | BP Callout from TREX-010924 |
TREX-010924.21.1.BP.PDF | Callout | 302.16 KB | 2013-11-07 | BP Callout from TREX-010924 |
TREX-010931.PDF | Exhibit | 2.26 MB | 2013-11-07 | Email from R. Merrill to M. Levitan re MC252 Pressures |
TREX-010931.2.1.US.PDF | Callout | 410.42 KB | 2013-11-07 | U.S. Callout from TREX-010931 |
TREX-010933.PDF | Exhibit | 1.09 MB | 2013-11-07 | Email from R. Merrill to M. Levitan re PIE_DPDerivatives_25July.xls |
TREX-010933.3.1.BP.PDF | Callout | 573.62 KB | 2013-11-07 | BP Callout from TREX-010933 |
TREX-011135.PDF | Exhibit | 10.17 MB | 2013-11-07 | FWHT upstream of BOP vs. Oil Rate |
TREX-011136.PDF | Exhibit | 9.64 MB | 2013-11-07 | Email from T. Liao to T. Boyd et al. re Mocondo |
TREX-011140.PDF | Exhibit | 3.96 MB | 2013-11-07 | Email from T. Liao - M. Mason re RE: Macondo SIWHP Build-up Rate FInal Report.doc |
TREX-011146.PDF | Exhibit | 37.11 MB | 2013-11-07 | Handwritten Notes of Tony Liao |
TREX-011151.PDF | Exhibit | 299.42 KB | 2013-11-07 | Email from M. Mason - D. Kercho et al. re 5MBD Case Base plotsa (3) .PPT |
TREX-011159.PDF | Exhibit | 3.30 MB | 2013-11-07 | Email from T. Liao to M. Mason re Overview of Macondo Well Modeling 12July2010.ppt - updated... |
TREX-011160.PDF | Exhibit | 2.85 MB | 2013-11-07 | Email from M. Mason to F. Sweeney, et al. re LiaoCases (3).xls |
TREX-011162.PDF | Exhibit | 357.06 KB | 2013-11-07 | Email from T. Hill to A. Chitale, et al. re Top Kill Modeling summary |
TREX-011163.PDF | Exhibit | 660.21 KB | 2013-11-07 | Email from K. Baker to T. Hill re FW Information on MC-252 well |
TREX-011165.PDF | Exhibit | 2.85 MB | 2013-11-07 | Email from T. Liao to M. Mason, et al. re Updated plot for Well Performance with BOP Pressure 3500 Case... |
TREX-011217.PDF | Exhibit | 2.97 MB | 2013-11-07 | Email from T. Hill from M. Mason, et al. re Meeting on Monday |
TREX-011217.1.10.BP.PDF | Callout | 275.81 KB | 2013-11-07 | BP Callout from TREX-011217 |
TREX-011217.1.11.BP.PDF | Callout | 281.12 KB | 2013-11-07 | BP Callout from TREX-011217 |
TREX-011217.1.5.BP.PDF | Callout | 268.86 KB | 2013-11-07 | BP Callout from TREX-011217 |
TREX-011217.2.4.BP.PDF | Callout | 281.79 KB | 2013-11-07 | BP Callout from TREX-011217 |
TREX-011217.2.5.BP.PDF | Callout | 290.96 KB | 2013-11-07 | BP Callout from TREX-011217 |
TREX-011217.2.6.BP.PDF | Callout | 314.67 KB | 2013-11-07 | BP Callout from TREX-011217 |
TREX-011224.PDF | Exhibit | 2.11 MB | 2013-11-07 | Email from C. Grounds - B. Looney et al. re Independent analysis of flow rate range |
TREX-011224.1.1.US.PDF | Callout | 289.53 KB | 2013-11-07 | U.S. Callout from TREX-011224 |
TREX-011224.2.1.US.PDF | Callout | 139.19 KB | 2013-11-07 | U.S. Callout from TREX-011224 |
TREX-011228.PDF | Exhibit | 6.58 MB | 2013-11-07 | Overview - Well Capping Macondo No. 1 |
TREX-011229.PDF | Exhibit | 1.50 MB | 2013-11-07 | Email from J. Wellings to C. Roberts re FW Enterprise Capping Stack Team Update - 4/3/2010 |
TREX-011232.PDF | Exhibit | 430.79 KB | 2013-11-07 | Email from J. Wellings to J. Schwebel, et al. re Thanks For the Good Work BOP on BOP and Capping Stack Team |
TREX-011242.PDF | Exhibit | 376.98 KB | 2013-11-07 | Email from C. Holt to J. Wellings re RE: Capping Stack Deployed Form Q-4000 |
TREX-011252.PDF | Exhibit | 1,005.80 KB | 2013-11-07 | Email from K. Mix to J. Sprague et al. re FW: CFD Results - Case 11 - 70000 bpd impacting baseplate of DEN BOP |
TREX-011261N.2.2.BP.PDF | Callout | 310.78 KB | 2013-11-07 | BP Callout from TREX-011261 |
TREX-011261N.2.3.BP.PDF | Callout | 299.13 KB | 2013-11-07 | BP Callout from TREX-011261 |
TREX-011261N.2.4.BP.PDF | Callout | 308.67 KB | 2013-11-07 | BP Callout from TREX-011261 |
TREX-011261N.2.BP.PDF | Callout | 483.79 KB | 2013-11-07 | BP Callout from TREX-011261 |
TREX-011280.1.1.US.PDF | Callout | 540.32 KB | 2013-11-07 | U.S. Callout from TREX-011280 |
TREX-011296.PDF | Exhibit | 6.14 MB | 2013-11-07 | Mud Flow During Kill, Ron Dykhuizen & Charlie Morrow, July 1, 2010 |
TREX-011296.1.1.BP.PDF | Callout | 284.46 KB | 2013-11-07 | BP Callout from TREX-011296 |
TREX-011296.2.1.BP.PDF | Callout | 312.92 KB | 2013-11-07 | BP Callout from TREX-011296 |
TREX-011303.PDF | Exhibit | 605.23 KB | 2013-11-07 | Statement from Admiral Allen on the Successful Completion of the Relief Well |
TREX-011303.1.2.BP.PDF | Callout | 269.85 KB | 2013-11-07 | BP Callout from TREX-011303 |
TREX-011303.1.BP.PDF | Callout | 331.98 KB | 2013-11-07 | BP Callout from TREX-011303 |
TREX-011305.PDF | Exhibit | 2.70 MB | 2013-11-07 | Email from SCHU to D. Leistikow, et al. re Conf call tps and q & a |
TREX-011305.1.1.BP.PDF | Callout | 278.19 KB | 2013-11-07 | BP Callout from TREX-011305 |
TREX-011305.1.2.BP.PDF | Callout | 280.56 KB | 2013-11-07 | BP Callout from TREX-011305 |
TREX-011305.1.7.BP.PDF | Callout | 273.33 KB | 2013-11-07 | BP Callout from TREX-011305 |
TREX-011305.1.BP.PDF | Callout | 281.58 KB | 2013-11-07 | BP Callout from TREX-011305 |
TREX-011305.2.1.BP.PDF | Callout | 290.22 KB | 2013-11-07 | BP Callout from TREX-011305 |
TREX-011305.2.11.BP.PDF | Callout | 285.09 KB | 2013-11-07 | BP Callout from TREX-011305 |
TREX-011305.2.2.BP.PDF | Callout | 284.25 KB | 2013-11-07 | BP Callout from TREX-011305 |
TREX-011305.2.3.BP.PDF | Callout | 282.61 KB | 2013-11-07 | BP Callout from TREX-011305 |
TREX-011305.2.8.BP.PDF | Callout | 285.13 KB | 2013-11-07 | BP Callout from TREX-011305 |
TREX-011305.2.BP.PDF | Callout | 353.40 KB | 2013-11-07 | BP Callout from TREX-011305 |
TREX-011435.PDF | Exhibit | 1.04 MB | 2013-11-07 | Email from S. Griffiths to R. Dykhuizen et al. re Re: well flow rates and total discharge |
TREX-011435.1.1.BP.PDF | Callout | 314.31 KB | 2013-11-07 | BP Callout from TREX-011435 |
TREX-011436.PDF | Exhibit | 1.19 MB | 2013-11-07 | Email from S. Griffiths to A. Ratzel et al. re FW: summary of your model |
TREX-011436.2.1.BP.PDF | Callout | 333.78 KB | 2013-11-07 | BP Callout from TREX-011436 |
TREX-011436.2.2.BP.PDF | Callout | 449.05 KB | 2013-11-07 | BP Callout from TREX-011436 |
TREX-011452.PDF | Exhibit | 38.13 MB | 2013-11-07 | Expert Report of Ronald Dykhuizen, Submitted on Behalf of the United States, March 22, 2013 |
TREX-011452.11.2.BP.PDF | Callout | 568.51 KB | 2013-11-07 | BP Callout from TREX-011452 |
TREX-011453R.12.1.BP.PDF | Callout | 515.36 KB | 2013-11-07 | BP Callout from TREX-011453R |
TREX-011456.PDF | Exhibit | 8.76 MB | 2013-11-07 | Document Produced Natively: WednesdayNightRush.xls |
TREX-011456.1.1.BP.PDF | Callout | 252.71 KB | 2013-11-07 | BP Callout from TREX-011456 |
TREX-011463R.PDF | Callout | 8.52 MB | 2013-11-07 | Redacted Version of TREX-011463 |
TREX-011464R.PDF | Callout | 17.71 MB | 2013-11-07 | Redacted Version of TREX-011464 |
TREX-011465R.PDF | Callout | 2.66 MB | 2013-11-07 | Redacted Version of TREX-011465 |
TREX-011467.PDF | Exhibit | 92.95 MB | 2013-11-07 | BP - Master Services Agreement Emergency Well Services - Contract Number: BPM-04-00806 |
TREX-011467.11.1.BP.PDF | Callout | 477.64 KB | 2013-11-07 | BP Callout from TREX-011467 |
TREX-011467.4.1.BP.PDF | Callout | 482.03 KB | 2013-11-07 | BP Callout from TREX-011467 |
TREX-011467.66.1.PSC.PDF | Callout | 202.29 KB | 2013-11-07 | PSC Callout from TREX-011467 |
TREX-011467.69.1.BP.PDF | Callout | 466.92 KB | 2013-11-07 | BP Callout from TREX-011467 |
TREX-011467.89.1.PSC.PDF | Callout | 204.72 KB | 2013-11-07 | PSC Callout from TREX-011467 |
TREX-011477.PDF | Exhibit | 691.47 KB | 2013-11-07 | Email from SCHU to T. Hunter, et al. re Conf call tps and q&a |
TREX-011477.1.2.BP.PDF | Callout | 308.29 KB | 2013-11-07 | BP Callout from TREX-011477 |
TREX-011477.1.3.BP.PDF | Callout | 294.08 KB | 2013-11-07 | BP Callout from TREX-011477 |
TREX-011478.PDF | Exhibit | 303.48 KB | 2013-11-07 | Email from M. McNutt to K. Salazar, et al. re Way forward |
TREX-011479.PDF | Exhibit | 779.53 KB | 2013-11-07 | Email from M. McNutt to T. Koslow, et al. re Means to top kill BP well located in Gulf |
TREX-011480.PDF | Exhibit | 8.27 MB | 2013-11-07 | Email from K. Fleckman to T. Hunter, et al. re Slides for May 16 Science Meeting |
TREX-011480.1.1.BP.PDF | Callout | 277.56 KB | 2013-11-07 | BP Callout from TREX-011480 |
TREX-011480.22.1.BP.PDF | Callout | 338.43 KB | 2013-11-07 | BP Callout from TREX-011480 |
TREX-011485R.PDF | Exhibit | 36.43 MB | 2013-11-07 | Redacted Version of TREX-011485 |
TREX-011485R.11.3.BP.PDF | Callout | 408.05 KB | 2013-11-07 | BP Callout from TREX-011485R |
TREX-011485R.12.3.BP.PDF | Callout | 873.42 KB | 2013-11-07 | BP Callout from TREX-011485R |
TREX-011485R.12.4.BP.PDF | Callout | 962.14 KB | 2013-11-07 | BP Callout from TREX-011485R |
TREX-011485R.9.1.BP.PDF | Callout | 278.40 KB | 2013-11-07 | BP Callout from TREX-011485R |
TREX-011486R.PDF | Exhibit | 16.56 MB | 2013-11-07 | Redacted Version of TREX-011486 |
TREX-011486R.12.6.BP.PDF | Callout | 326.38 KB | 2013-11-07 | BP Callout from TREX-011486R |
TREX-011486R.14.1.BP.PDF | Callout | 305.67 KB | 2013-11-07 | BP Callout from TREX-011486R |
TREX-011486R.27.PDF | Callout | 429.76 KB | 2013-11-07 | U.S. Callout from TREX-011486R |
TREX-011486R.27.1.US.PDF | Callout | 437.97 KB | 2013-11-07 | U.S. Callout from TREX-011486R |
TREX-011486R.29.2.BP.PDF | Callout | 331.74 KB | 2013-11-07 | BP Callout from TREX-011486R |
TREX-011488.PDF | Exhibit | 48.99 MB | 2013-11-07 | Technical Review of US Government Expert Witness Reports on Flow Rates from the MC252 Macondo Well; Expert Report of A.E. Johnson PhD |
TREX-011488.12.1.BP.PDF | Callout | 504.71 KB | 2013-11-07 | BP Callout from TREX-011488 |
TREX-011488.14.2.BP.PDF | Callout | 584.92 KB | 2013-11-07 | BP Callout from TREX-011488 |
TREX-011488.17.2.BP.PDF | Callout | 321.18 KB | 2013-11-07 | BP Callout from TREX-011488 |
TREX-011488.17.4.BP.PDF | Callout | 505.92 KB | 2013-11-07 | BP Callout from TREX-011488 |
TREX-011488.19.3.BP.PDF | Callout | 583.56 KB | 2013-11-07 | BP Callout from TREX-011488 |
TREX-011488.24.1.US.PDF | Callout | 330.58 KB | 2013-11-07 | U.S. Callout from TREX-011488 |
TREX-011488.24.2.US.PDF | Callout | 264.79 KB | 2013-11-07 | U.S. Callout from TREX-011488 |
TREX-011488.29.1.BP.PDF | Callout | 505.73 KB | 2013-11-07 | BP Callout from TREX-011488 |
TREX-011490R.PDF | Exhibit | 25.13 MB | 2013-11-07 | Redacted Version of TREX-011490 |
TREX-011490R.25.4.BP.PDF | Callout | 313.03 KB | 2013-11-07 | BP Callout from TREX-011490R |
TREX-011490R.34.1.BP.PDF | Callout | 337.07 KB | 2013-11-07 | BP Callout from TREX-011490R |
TREX-011491R.PDF | Exhibit | 14.16 MB | 2013-11-07 | Redacted Version of TREX-011491 |
TREX-011491R.12.1.US.PDF | Callout | 285.80 KB | 2013-11-07 | U.S. Callout from TREX-011491R |
TREX-011491R.20.1.BP.PDF | Callout | 273.68 KB | 2013-11-07 | BP Callout from TREX-011491R |
TREX-011492.PDF | Exhibit | 967.29 KB | 2013-11-07 | LinkedIn profile of Curtis Hays Whitson, Professor at NTNU |
TREX-011492.2.2.BP.PDF | Callout | 279.21 KB | 2013-11-07 | BP Callout from TREX-011492 |
TREX-011495.PDF | Exhibit | 283.02 KB | 2013-11-07 | Spreadsheet summarizing modeling runs |
TREX-011495.1.1.BP.PDF | Callout | 812.04 KB | 2013-11-07 | BP Callout from TREX-011495 |
TREX-011496.PDF | Exhibit | 75.24 MB | 2013-11-07 | Expert Report of Curtis Hays Whitson, PhD, May 1, 2013 |
TREX-011496.1.PDF | Callout | 278.94 KB | 2013-11-07 | BP Callout from TREX-011496 |
TREX-011496.18.1.US.PDF | Callout | 457.28 KB | 2013-11-07 | U.S. Callout from TREX-011496 |
TREX-011496.180.PDF | Callout | 399.12 KB | 2013-11-07 | BP Callout from TREX-011496 |
TREX-011496.180.1.BP.PDF | Callout | 284.62 KB | 2013-11-07 | BP Callout from TREX-011496 |
TREX-011496.19.1.BP.PDF | Callout | 303.59 KB | 2013-11-07 | BP Callout from TREX-011496 |
TREX-011496.23.1.US.PDF | Callout | 303.24 KB | 2013-11-07 | U.S. Callout from TREX-011496 |
TREX-011497.PDF | Exhibit | 37.12 MB | 2013-11-07 | Expert Report of Robert Zimmerman, Pore Volume Compressibility of the Macondo Reservoir, May 1, 2013 |
TREX-011497.1.PDF | Callout | 312.51 KB | 2013-11-07 | BP Callout from TREX-011497 |
TREX-011501.PDF | Exhibit | 381.01 KB | 2013-11-07 | Description of Rotary Sidewall Cores from the Weatherford Laboratories website |
TREX-011501.1.1.US.PDF | Callout | 430.77 KB | 2013-11-07 | U.S. Callout from TREX-011501 |
TREX-011503.PDF | Exhibit | 9.15 MB | 2013-11-07 | Email from T. Gansert to A. Zamorouev et al. re RE: Macondo Core VOI |
TREX-011503.1.1.US.PDF | Callout | 405.98 KB | 2013-11-07 | U.S. Callout from TREX-011503 |
TREX-011503.25.1.US.PDF | Callout | 512.75 KB | 2013-11-07 | U.S. Callout from TREX-011503 |
TREX-011505.PDF | Exhibit | 1.73 MB | 2013-11-07 | BP Memo from R. Hickman to Joe McCutcheon et al. re Isabella Pore Volume Compressibility Evaluation |
TREX-011505.1.1.US.PDF | Callout | 501.79 KB | 2013-11-07 | U.S. Callout from TREX-011505 |
TREX-011505.1.2.US.PDF | Callout | 492.33 KB | 2013-11-07 | U.S. Callout from TREX-011505 |
TREX-011505.3.1.US.PDF | Callout | 481.36 KB | 2013-11-07 | U.S. Callout from TREX-011505 |
TREX-011508.PDF | Exhibit | 2.75 MB | 2013-11-07 | Proposal for Establishing a Working Group on ISRM Suggested Method for Uniaxial-Strain Compressibility Testing |
TREX-011510.PDF | Exhibit | 1.07 MB | 2013-11-07 | Weatherford Laboratories' Rotary Inventory, Status of Samples, July 2, 2010 |
TREX-011510.2.2.US.PDF | Callout | 344.26 KB | 2013-11-07 | U.S. Callout from TREX-011510 |
TREX-011512.PDF | Exhibit | 1.01 MB | 2013-11-07 | Log to Core Porosity Comparison and Average Reservoir Porosity From Logs |
TREX-011512.1.1.US.PDF | Callout | 542.47 KB | 2013-11-07 | U.S. Callout from TREX-011512 |
TREX-011512.2.1.US.PDF | Callout | 556.73 KB | 2013-11-07 | U.S. Callout from TREX-011512 |
TREX-011519.PDF | Exhibit | 12.45 MB | 2013-11-07 | BP Pore volume compressibility in weakly-cemented sandstones |
TREX-011519.24.1.US.PDF | Callout | 311.97 KB | 2013-11-07 | U.S. Callout from TREX-011519 |
TREX-011523.PDF | Exhibit | 642.99 KB | 2013-11-07 | Weatherford Laboratories, Job no: HH-46949, Sample 3-16R |
TREX-011523.2.2.US.PDF | Callout | 351.20 KB | 2013-11-07 | U.S. Callout from TREX-011523 |
TREX-011529R.PDF | Exhibit | 15.74 MB | 2013-11-07 | Redacted Version of TREX-011529 |
TREX-011529R.35.1.US.PDF | Callout | 343.26 KB | 2013-11-07 | U.S. Callout from TREX-011529R |
TREX-011534.PDF | Exhibit | 9.21 MB | 2013-11-07 | Flow Estimate by Analysis of Top Hat and Riser; National Labs - Houston Team, June 15, 2010 |
TREX-011534.1.PDF | Callout | 262.71 KB | 2013-11-07 | BP Callout from TREX-011534 |
TREX-011534.16.PDF | Callout | 309.30 KB | 2013-11-07 | BP Callout from TREX-011534 |
TREX-011545.PDF | Exhibit | 1.44 MB | 2013-11-07 | Email from E. Redd to P. O'Bryan re FW: Planning for Side Entry - between lower and middle pipe cavity - DD II BOP |
TREX-011546.PDF | Exhibit | 643.92 KB | 2013-11-07 | Email from T. Allen to B. Penoyer et al. re FW: Top Kill |
TREX-011549R.PDF | Exhibit | 63.58 MB | 2013-11-07 | Redacted Version of TREX-011549 |
TREX-011550R.PDF | Exhibit | 16.70 MB | 2013-11-07 | Redacted Version of TREX-011550 |
TREX-011550R.7.1.BP.PDF | Callout | 356.58 KB | 2013-11-07 | BP Callout from TREX-011550R |
TREX-011551.PDF | Exhibit | 1.55 MB | 2013-11-07 | BP Macondo Technical Note: Depleted Pressure for Well Control Planning, C-Draft |
TREX-011551.1.1.BP.PDF | Callout | 298.16 KB | 2013-11-07 | BP Callout from TREX-011551 |
TREX-011551.3.1.BP.PDF | Callout | 563.07 KB | 2013-11-07 | BP Callout from TREX-011551 |
TREX-011553R-NoHC-2.109.1.US.PDF | Callout | 405.17 KB | 2013-11-07 | U.S. Callout from TREX-011553R-NoHC-2 |
TREX-011553R-NoHC-2.109.2.US.PDF | Callout | 326.98 KB | 2013-11-07 | U.S. Callout from TREX-011553R-NoHC-2 |
TREX-011553R-NoHC-2.27.1.US.PDF | Callout | 407.94 KB | 2013-11-07 | U.S. Callout from TREX-011553R-NoHC-2 |
TREX-011553R-NoHC-2.61.1.US.PDF | Callout | 362.95 KB | 2013-11-07 | U.S. Callout from TREX-011553R-NoHC-2 |
TREX-011553R-NoHC-2.77.1.US.PDF | Callout | 485.07 KB | 2013-11-07 | U.S. Callout from TREX-011553R-NoHC-2 |
TREX-011557.PDF | Exhibit | 639.87 KB | 2013-11-07 | Email from K. McAughan to S. Wilson re RE: Macondo PVC |
TREX-011557.1.1.BP.PDF | Callout | 285.19 KB | 2013-11-07 | BP Callout from TREX-011557 |
TREX-011557.2.1.BP.PDF | Callout | 283.49 KB | 2013-11-07 | BP Callout from TREX-011557 |
TREX-011560.PDF | Exhibit | 5.93 MB | 2013-11-07 | SPE 115669 Water-Flooding Incremental Oil Recovery Study in Middle miocene to Paleocene Reservoirs, Deep-Water Gulf of Mexico |
TREX-011560.1.1.BP.PDF | Callout | 292.69 KB | 2013-11-07 | BP Callout from TREX-011560 |
TREX-011560.4.1.BP.PDF | Callout | 356.49 KB | 2013-11-07 | BP Callout from TREX-011560 |
TREX-011562.PDF | Exhibit | 811.58 KB | 2013-11-07 | Diagrams titled high drillpipe, low drillpipe and no drillpipe |
TREX-011562.1.1.US.PDF | Callout | 288.46 KB | 2013-11-07 | U.S. Callout from TREX-011562 |
TREX-011562.2.1.US.PDF | Callout | 297.72 KB | 2013-11-07 | U.S. Callout from TREX-011562 |
TREX-011574N.PDF | Exhibit | 5.23 MB | 2013-11-07 | Native Version of TREX-011574 |
TREX-011574N.4.2.BP.PDF | Callout | 341.03 KB | 2013-11-07 | BP Callout from TREX-011574N |
TREX-011574N.6.1.US.PDF | Callout | 537.02 KB | 2013-11-07 | U.S. Callout from TREX-011574N |
TREX-011574N.6.2.US.PDF | Callout | 558.42 KB | 2013-11-07 | U.S. Callout from TREX-011574N |
TREX-011575.PDF | Exhibit | 20.89 MB | 2013-11-07 | Schlumberger Fluid Analysis on Macondo Samples, Reservoir Sample Analysis Report Prepared for Ms. Kelly McAughan and Dr. Yun Wang |
TREX-011575.1.PDF | Callout | 294.15 KB | 2013-11-07 | BP Callout from TREX-011575 |
TREX-011578R.52.1.HESI.PDF | Callout | 647.25 KB | 2013-11-07 | Halliburton Callout from TREX-011578 |
TREX-011578R-v2.PDF | Callout | 31.89 MB | 2013-11-07 | Redacted Version of TREX-011578 |
TREX-011579R-v2.PDF | Callout | 8.47 MB | 2013-11-07 | Redacted Version of TREX-011579 |
TREX-011581.PDF | Exhibit | 1.59 MB | 2013-11-07 | Email from L. Birnbaum to K. Good re Fw: Deepwater Horizon Incident - Reply from Apache Corporation to Secretary Salazar's request |
TREX-011581.1.1.HESI.PDF | Callout | 819.38 KB | 2013-11-07 | Halliburton Callout from TREX-011581 |
TREX-011581.1.BP.PDF | Callout | 411.52 KB | 2013-11-07 | BP Callout from TREX-011581 |
TREX-011581.2.1.HESI.PDF | Callout | 794.63 KB | 2013-11-07 | Halliburton Callout from TREX-011581 |
TREX-011581.2.BP.PDF | Callout | 446.31 KB | 2013-11-07 | BP Callout from TREX-011581 |
TREX-011583.PDF | Exhibit | 9.15 MB | 2013-11-07 | Transocean's Loss of Well Control and Emergency Repsonse Powerpoint |
TREX-011585.PDF | Exhibit | 970.93 KB | 2013-11-07 | BP Letter from S. Gallagher to B. Mahler re Master Service Contract BPM-04-00806-Amendment #1 |
TREX-011592.PDF | Exhibit | 633.42 KB | 2013-11-07 | Email from M. McNutt to T. Allen et al. re Steps forward for containment |
TREX-011603.PDF | Exhibit | 16.56 MB | 2013-11-07 | BP's Crisis and Continuity Management Plan, E&P, Gulf of Mexico |
TREX-011606.PDF | Exhibit | 56.32 MB | 2013-11-07 | BP GoM Deepwater SPU Well Control Response Guide |
TREX-011613.13.BP.PDF | Callout | 183.58 KB | 2013-11-07 | BP Callout from TREX-011613 |
TREX-011613.40.5.TO.PDF | Callout | 367.22 KB | 2013-11-07 | Transocean Callout from TREX-011613 |
TREX-011613.40.7.TO.PDF | Callout | 466.34 KB | 2013-11-07 | Transocean Callout from TREX-011613 |
TREX-011613.40.BP.PDF | Callout | 278.03 KB | 2013-11-07 | BP Callout from TREX-011613 |
TREX-011613.43.BP.PDF | Callout | 404.54 KB | 2013-11-07 | BP Callout from TREX-011613 |
TREX-011613.44.BP.PDF | Callout | 235.05 KB | 2013-11-07 | BP Callout from TREX-011613 |
TREX-011613.45.1.BP.PDF | Callout | 395.96 KB | 2013-11-07 | BP Callout from TREX-011613 |
TREX-011613.45.BP.PDF | Callout | 307.71 KB | 2013-11-07 | BP Callout from TREX-011613 |
TREX-011614.PDF | Exhibit | 3.79 MB | 2013-11-07 | BP Top Kill Analysis Presentation, May 29, 2010 |
TREX-011614.1.TO.PDF | Callout | 254.79 KB | 2013-11-07 | Transocean Callout from TREX-011614 |
TREX-011614.4.TO.PDF | Callout | 382.14 KB | 2013-11-07 | Transocean Callout from TREX-011614 |
TREX-011614.6.4.TO.PDF | Callout | 439.38 KB | 2013-11-07 | Transocean Callout from TREX-011614 |
TREX-011614.9.2.TO.PDF | Callout | 395.61 KB | 2013-11-07 | Transocean Callout from TREX-011614 |
TREX-011620.PDF | Exhibit | 12.51 MB | 2013-11-07 | Email from S. Tieszen to T. Hunter et al. re 1 June Report from Houston |
TREX-011621.zip | Exhibit | 1.23 MB | 2013-11-07 | Email from T. Selbekk to T. Hill et al. re Plots - history matching og third top kill operation |
TREX-011625.zip | Exhibit | 47.71 MB | 2013-11-07 | Neal Adams Firefighters, Inc. Joint Industry Program for Floating Vessel Blowout Control, Final Report |
TREX-011625.1.HESI.PDF | Callout | 699.00 KB | 2013-11-07 | Halliburton Callout from TREX-011625 |
TREX-011625.27.1.HESI.PDF | Callout | 899.98 KB | 2013-11-07 | Halliburton Callout from TREX-011625 |
TREX-011644.1.PDF | Callout | 362.20 KB | 2013-11-07 | BP Callout from TREX-011644 |
TREX-011644.10.1.BP.PDF | Callout | 528.61 KB | 2013-11-07 | BP Callout from TREX-011644 |
TREX-011644.14.1.US.PDF | Callout | 284.17 KB | 2013-11-07 | U.S. Callout from TREX-011644 |
TREX-011644.15.1.US.PDF | Callout | 305.47 KB | 2013-11-07 | U.S. Callout from TREX-011644 |
TREX-011644.16.1.BP.PDF | Callout | 185.98 KB | 2013-11-07 | BP Callout from TREX-011644 |
TREX-011644.16.1.US.PDF | Callout | 518.90 KB | 2013-11-07 | U.S. Callout from TREX-011644 |
TREX-011644.20.1.US.PDF | Callout | 270.72 KB | 2013-11-07 | U.S. Callout from TREX-011644 |
TREX-011644.28.1.BP.PDF | Callout | 440.10 KB | 2013-11-07 | BP Callout from TREX-011644 |
TREX-011644.7.1.BP.PDF | Callout | 430.19 KB | 2013-11-07 | BP Callout from TREX-011644 |
TREX-011647.PDF | Exhibit | 3.66 MB | 2013-11-07 | Effect of crushed ceramic and basaltic pumice as fine aggregates on concrete mortars properties by Hanifi BInici |
TREX-011648.PDF | Exhibit | 2.58 MB | 2013-11-07 | Hydraulic Erosion of Concrete by a Submerged Jet |
TREX-011648.1.1.US.PDF | Callout | 469.42 KB | 2013-11-07 | U.S. Callout from TREX-011648 |
TREX-011648.1.2.US.PDF | Callout | 559.58 KB | 2013-11-07 | U.S. Callout from TREX-011648 |
TREX-011649.PDF | Exhibit | 3.68 MB | 2013-11-07 | Abrasion erosion of concrete by water-borne sand by Yu-Wen Liu, Tsong Yen, and Taso-Hua Hsu |
TREX-011649.4.1.US.PDF | Callout | 481.42 KB | 2013-11-07 | U.S. Callout from TREX-011649 |
TREX-011649.7.1.US.PDF | Callout | 390.99 KB | 2013-11-07 | U.S. Callout from TREX-011649 |
TREX-011653.PDF | Exhibit | 146.24 MB | 2013-11-07 | Expert Report of Mehran Pooladi-Darvish Prepared on Behalf of the United States: Estimate of Cumulative Volume of Oil Released from the MC252 Macondo Well |
TREX-011653.27.1.BP.PDF | Callout | 344.07 KB | 2013-11-07 | BP Callout from TREX-011653 |
TREX-011653.27.4.BP.PDF | Callout | 509.44 KB | 2013-11-07 | BP Callout from TREX-011653 |
TREX-011653.28.1.US.PDF | Callout | 481.14 KB | 2013-11-07 | U.S. Callout from TREX-011653 |
TREX-011654R.PDF | Exhibit | 58.00 MB | 2013-11-07 | Redacted Version of TREX-011654 |
TREX-011677.PDF | Exhibit | 63.76 MB | 2013-11-07 | Letter from D. Moore to D. Stoltz re Discover Enterprise: Acceptance of Well Control Equipment |
TREX-011677.1.4.BP.PDF | Callout | 298.46 KB | 2013-11-07 | BP Callout from TREX-011677 |
TREX-011677.129.2.BP.PDF | Callout | 298.66 KB | 2013-11-07 | BP Callout from TREX-011677 |
TREX-011677.130.4.BP.PDF | Callout | 313.47 KB | 2013-11-07 | BP Callout from TREX-011677 |
TREX-011677.145.5.BP.PDF | Callout | 298.99 KB | 2013-11-07 | BP Callout from TREX-011677 |
TREX-011677.146.3.BP.PDF | Callout | 360.54 KB | 2013-11-07 | BP Callout from TREX-011677 |
TREX-011677.3.5.BP.PDF | Callout | 270.39 KB | 2013-11-07 | BP Callout from TREX-011677 |
TREX-011677N.PDF | Exhibit | 59.12 MB | 2013-11-07 | Native Version of TREX-011677 |
TREX-011677N.1.2.BP.PDF | Callout | 296.82 KB | 2013-11-07 | BP Callout from TREX-011677 |
TREX-011683.PDF | Exhibit | 46.93 MB | 2013-11-07 | Expert Report of Michael Zaldivar, PhD, Quantification of Flow Rate during Slug Flow, May 1, 2013 |
TREX-011683.16.1.BP.PDF | Callout | 306.06 KB | 2013-11-07 | BP Callout from TREX-011683 |
TREX-011683.30.2.BP.PDF | Callout | 303.64 KB | 2013-11-07 | BP Callout from TREX-011683 |
TREX-011683.9.1.BP.PDF | Callout | 322.39 KB | 2013-11-07 | BP Callout from TREX-011683 |
TREX-011683.93.1.BP.PDF | Callout | 283.58 KB | 2013-11-07 | BP Callout from TREX-011683 |
TREX-011696R.PDF | Exhibit | 92.45 MB | 2013-11-07 | Redacted Version of TREX-011696 |
TREX-011696-R.113.1.US.PDF | Callout | 266.99 KB | 2013-11-07 | U.S. Callout from TREX-011696-R |
TREX-011696-R.37.1.US.PDF | Callout | 337.25 KB | 2013-11-07 | U.S. Callout from TREX-011696-R |
TREX-011696-R.53.1.US.PDF | Callout | 364.67 KB | 2013-11-07 | U.S. Callout from TREX-011696-R |
TREX-011696-R.73.1.US.PDF | Callout | 401.62 KB | 2013-11-07 | U.S. Callout from TREX-011696-R |
TREX-011696-R-N.104.1.US.PDF | Callout | 356.11 KB | 2013-11-07 | U.S. Callout from TREX-011696-R-N |
TREX-011696-R-N.28.1.US.PDF | Callout | 357.12 KB | 2013-11-07 | U.S. Callout from TREX-011696-R-N |
TREX-011696-R-N.45.1.US.PDF | Callout | 348.51 KB | 2013-11-07 | U.S. Callout from TREX-011696-R-N |
TREX-011697.PDF | Exhibit | 6.19 MB | 2013-11-07 | SPE 84086, Will Wireline Formation Tests Replace Well Tests? |
TREX-011697.4.1.US.PDF | Callout | 446.69 KB | 2013-11-07 | U.S. Callout from TREX-011697 |
TREX-011698R.11.PDF | Callout | 1.04 MB | 2013-11-07 | BP Callout from TREX-011698R |
TREX-011698R.24.1.US.PDF | Callout | 394.94 KB | 2013-11-07 | U.S. Callout from TREX-011698R |
TREX-011732.PDF | Exhibit | 2.08 MB | 2013-11-07 | Fluent Simulations - BSR - Simulation results screen shots |
TREX-011732.5.PDF | Callout | 338.95 KB | 2013-11-07 | U.S. Callout from TREX-011732 |
TREX-011734.PDF | Exhibit | 4.16 MB | 2013-11-07 | Erosion in Disturbed Liquid/Particle Pipe Flow: Effects of Flow Geometry and Particle Surface Roughness |
TREX-011735.PDF | Exhibit | 796.57 KB | 2013-11-07 | Data conversion table |
TREX-011735.1.1.US.PDF | Callout | 317.86 KB | 2013-11-07 | U.S. Callout from TREX-011735 |
TREX-011737R.PDF | Exhibit | 20.22 MB | 2013-11-07 | Redacted Version of TREX-011737 |
TREX-011737R.13.6.TO.PDF | Callout | 371.46 KB | 2013-11-07 | Transocean Callout from TREX-011737R |
TREX-011737R.13.7.TO.PDF | Callout | 394.79 KB | 2013-11-07 | Transocean Callout from TREX-011737R |
TREX-011737R.15.3.TO.PDF | Callout | 399.75 KB | 2013-11-07 | Transocean Callout from TREX-011737R |
TREX-011737R.8.5.TO.PDF | Callout | 453.49 KB | 2013-11-07 | Transocean Callout from TREX-011737R |
TREX-011738R.PDF | Exhibit | 7.40 MB | 2013-11-07 | Redacted Version of TREX-011738 |
TREX-011738R.5.2.TO.PDF | Callout | 464.60 KB | 2013-11-07 | Transocean Callout from TREX-011738R |
TREX-011738R.6.2.TO.PDF | Callout | 410.27 KB | 2013-11-07 | Transocean Callout from TREX-011738R |
TREX-011743.PDF | Exhibit | 65.70 MB | 2013-11-07 | WEST Engineering Services GSF Development Driller II, dated 12 July 2010 |
TREX-011743.1.1.BP.PDF | Callout | 290.96 KB | 2013-11-07 | BP Callout from TREX-011743 |
TREX-011744.PDF | Exhibit | 2.91 MB | 2013-11-07 | MC 252 Junk Shot Peer Assist - 6 May 2010 Report of Findings |
TREX-011750R.PDF | Exhibit | 20.91 MB | 2013-11-07 | Redacted Version of TREX-011750 |
TREX-011751R.PDF | Exhibit | 5.93 MB | 2013-11-07 | Redacted Version of TREX-011751 |
TREX-011752.PDF | Exhibit | 2.39 MB | 2013-11-07 | Absence of fatalities in blowouts encouraging in MMS study of OCS incidents 1992-2006 |
TREX-011752.1.1.BP.PDF | Callout | 313.76 KB | 2013-11-07 | BP Callout from TREX-011752 |
TREX-011752.2.2.BP.PDF | Callout | 392.99 KB | 2013-11-07 | BP Callout from TREX-011752 |
TREX-011753.PDF | Exhibit | 11.65 MB | 2013-11-07 | United States Department of the Interior Minerals Management Service, Gulf of Mexico OCS Region, Effective Date: October 26, 2006 |
TREX-011753.1.1.BP.PDF | Callout | 291.01 KB | 2013-11-07 | BP Callout from TREX-011753 |
TREX-011753.12.1.BP.PDF | Callout | 418.45 KB | 2013-11-07 | BP Callout from TREX-011753 |
TREX-011753.12.2.BP.PDF | Callout | 546.15 KB | 2013-11-07 | BP Callout from TREX-011753 |
TREX-011754.PDF | Exhibit | 43.81 MB | 2013-11-07 | Excerpt of BP Gulf of Mexico Regional Oil Spill Response Plan |
TREX-011754.29.7.BP.PDF | Callout | 363.61 KB | 2013-11-07 | BP Callout from TREX-011754 |
TREX-011754.29.8.BP.PDF | Callout | 361.93 KB | 2013-11-07 | BP Callout from TREX-011754 |
TREX-011754.29.9.BP.PDF | Callout | 371.63 KB | 2013-11-07 | BP Callout from TREX-011754 |
TREX-011755.1.1.BP.PDF | Callout | 273.98 KB | 2013-11-07 | BP Callout from TREX-011755 |
TREX-011755.20.1.BP.PDF | Callout | 431.65 KB | 2013-11-07 | BP Callout from TREX-011755 |
TREX-011755.20.3.BP.PDF | Callout | 291.09 KB | 2013-11-07 | BP Callout from TREX-011755 |
TREX-011755.23.1.BP.PDF | Callout | 327.05 KB | 2013-11-07 | BP Callout from TREX-011755 |
TREX-011755.42.1.BP.PDF | Callout | 328.13 KB | 2013-11-07 | BP Callout from TREX-011755 |
TREX-011755.49.2.BP.PDF | Callout | 306.15 KB | 2013-11-07 | BP Callout from TREX-011755 |
TREX-011755.49.3.BP.PDF | Callout | 300.46 KB | 2013-11-07 | BP Callout from TREX-011755 |
TREX-011900.PDF | Exhibit | 42.60 MB | 2013-11-07 | Expert Report of Dr. John Wilson, Submitted by Transocean Offshore Deepwater Drilling, Inc., May 1, 2013 |
TREX-011900.1.1.TO.PDF | Callout | 318.79 KB | 2013-11-07 | Transocean Callout from TREX-011900 |
TREX-011900.50.1.BP.PDF | Callout | 474.84 KB | 2013-11-07 | BP Callout from TREX-011900 |
TREX-011900.8.2.BP.PDF | Callout | 372.03 KB | 2013-11-07 | BP Callout from TREX-011900 |
TREX-011902.PDF | Exhibit | 994.69 KB | 2013-11-07 | Flow Rate Group Provides Preliminary Best Estimate of Oil Flowing from BP Oil Well |
TREX-011905R.PDF | Exhibit | 20.04 MB | 2013-11-07 | Redacted Version of TREX-011905 |
TREX-011905R.15.1.BP.PDF | Callout | 161.08 KB | 2013-11-07 | BP Callout from TREX-011905R |
TREX-011905R.17.1.BP.PDF | Callout | 194.57 KB | 2013-11-07 | BP Callout from TREX-011905R |
TREX-011905R.21.1.TO.PDF | Callout | 430.86 KB | 2013-11-07 | Transocean Callout from TREX-011905R |
TREX-011905R.31.1.TO.PDF | Callout | 462.68 KB | 2013-11-07 | Transocean Callout from TREX-011905R |
TREX-011906.PDF | Exhibit | 26.94 MB | 2013-11-07 | BP PowerPoint titled Cofferdam Progress and a coversheet with BP PowerPoint tips & tricks |
TREX-011906.4.1.TO.PDF | Callout | 297.65 KB | 2013-11-07 | Transocean Callout from TREX-011906 |
TREX-011906.5.1.TO.PDF | Callout | 365.57 KB | 2013-11-07 | Transocean Callout from TREX-011906 |
TREX-011906.6.1.TO.PDF | Callout | 447.44 KB | 2013-11-07 | Transocean Callout from TREX-011906 |
TREX-011906.7.1.TO.PDF | Callout | 455.46 KB | 2013-11-07 | Transocean Callout from TREX-011906 |
TREX-011907.PDF | Exhibit | 842.99 KB | 2013-11-07 | Email from J. Peijs to D. Suttles et al. re Updated model slide |
TREX-011907.1.1.TO.PDF | Callout | 319.19 KB | 2013-11-07 | Transocean Callout from TREX-011907 |
TREX-011907.3.1.TO.PDF | Callout | 301.38 KB | 2013-11-07 | Transocean Callout from TREX-011907 |
TREX-012102R.PDF | Exhibit | 24.48 MB | 2013-11-07 | Redacted Version of TREX-012102 |
TREX-012102R.13.2.BP.PDF | Callout | 451.94 KB | 2013-11-07 | BP Callout from TREX-012102R |
TREX-012102R.57.1.BP.PDF | Callout | 460.80 KB | 2013-11-07 | BP Callout from TREX-012102R |
TREX-012102R.6.1.BP.PDF | Callout | 425.47 KB | 2013-11-07 | BP Callout from TREX-012102R |
TREX-012102R.64.PDF | Callout | 282.02 KB | 2013-11-07 | U.S. Callout from TREX-012102R |
TREX-021176.PDF | Exhibit | 513.02 MB | 2013-11-07 | Grace, Robert D.: Blowout and Well Control Handbook, Gulf Professional Publishing Company, ISBN: 0-7506-7708-2 |
TREX-021176.268.1.TO.PDF | Callout | 438.46 KB | 2013-11-07 | Transocean Callout from TREX-021176 |
TREX-021176.268.5.TO.PDF | Callout | 554.94 KB | 2013-11-07 | Transocean Callout from TREX-021176 |
TREX-021176.269.6.TO.PDF | Callout | 626.88 KB | 2013-11-07 | Transocean Callout from TREX-021176 |
TREX-041026.PDF | Exhibit | 64.40 MB | 2013-11-07 | Appendix W to BP Internal Investigation Report: Dynamic Simulations Deepwater Horizon Incident |
TREX-041026.29.1.US_30.1.US.PDF | Callout | 220.70 KB | 2013-11-07 | U.S. Callout from TREX-041026 |
TREX-041026.57.PDF | Callout | 383.47 KB | 2013-11-07 | U.S. Callout from TREX-041026 |
TREX-041026.57.1.US.PDF | Callout | 431.00 KB | 2013-11-07 | U.S. Callout from TREX-041026 |
TREX-041026.8.PDF | Callout | 582.22 KB | 2013-11-07 | U.S. Callout from TREX-041026 |
TREX-041026.8.1.US.PDF | Callout | 526.77 KB | 2013-11-07 | U.S. Callout from TREX-041026 |
TREX-052673.17.3.TO.PDF | Callout | 448.48 KB | 2013-11-07 | Transocean Callout from TREX-052673 |
TREX-060988.PDF | Exhibit | 41.33 MB | 2013-11-07 | Report: CoreLab Reservoir Optimization- Volatile Oil Reservoir Fluid Study By Pencor |
TREX-060988.26.1.US.PDF | Callout | 440.56 KB | 2013-11-07 | U.S. Callout from TREX-060988 |
TREX-060988.3.1.US.PDF | Callout | 395.94 KB | 2013-11-07 | U.S. Callout from TREX-060988 |
TREX-100208.284.1.PSC.PDF | Callout | 251.46 KB | 2013-11-07 | PSC Callout from TREX-100208 |
TREX-100231.114-115.PDF | Callout | 55.76 KB | 2013-11-07 | PSC Callout from TREX-100231 |
TREX-100231.163.1.PSC.PDF | Callout | 475.12 KB | 2013-11-07 | PSC Callout from TREX-100231 |
TREX-120129.PDF | Exhibit | 194.55 MB | 2013-11-07 | BP's GoM Drilling, Completions and Interventions: Technical Assurance Report: Well Cap with Triple-Ram Stack, at p. LNL004-026328 |
TREX-120129.1.1.TO.PDF | Callout | 404.41 KB | 2013-11-07 | Transocean Callout from TREX-120129 |
TREX-120129.7.1.TO.PDF | Callout | 452.38 KB | 2013-11-07 | Transocean Callout from TREX-120129 |
TREX-120227.PDF | Exhibit | 41.86 KB | 2013-11-07 | Email from James Dupree to Jason Caldwell; Subject: Letter; Attachment: Dear Admiral Landry.doc |
TREX-120227.2.1.PSC.PDF | Callout | 245.34 KB | 2013-11-07 | PSC Callout from TREX-120227 |
TREX-130003.ppt | Exhibit | 92.50 KB | 2013-11-07 | E-mail - From: Hill, Trevor to Michael Edwards, Kate Baker, Subject: Draft for Discussion |
TREX-130015.xls | Exhibit | 25.00 KB | 2013-11-07 | E-mail - From: Tim Lockett to Samir Khanna, Julian Austin, Hill, Trevor, Subject: RE: CFD effort in Houston |
TREX-130024.ppt | Exhibit | 15.00 KB | 2013-11-07 | E-mail - From: Roberta Wilson to Dustin Staiger, Jason Caldwell, Jason, Subject: RE: Procedure 4464 Well Integrity. |
TREX-130037.ppt | Exhibit | 545.00 KB | 2013-11-07 | E-mail - From: Kurt Mix to Bob Grace, Subject: Flow Modeling Results |
TREX-130043.PDF | Exhibit | 11.27 MB | 2013-11-07 | E-mail - From: Wilson Arabie to Gary Wulf, Subject: E-mail - From:ing: 4058_Dyanamic_Kill_Technical_File_Note_Rev_A.pdf |
TREX-130097.PDF | Exhibit | 265.75 KB | 2013-11-07 | Email re Reservoir Engineering Support from Burch, William to Wellings, James |
TREX-130120.PDF | Exhibit | 182.23 KB | 2013-11-07 | Email re Current Density/Pressure assumptions from Hill, Trevor to Cook, Howard et al |
TREX-130138.PDF | Exhibit | 428.76 KB | 2013-11-07 | Email re Macondo Technical Note - Depletion for Relief Well from Merrill, Robert to Burch, William et al |
TREX-130491.pptx | Exhibit | 316.74 KB | 2013-11-07 | Email From: Ole Rygg To: Mark Patteson; Subject: RE: Summary on updated models with attachment |
TREX-130491.1.2.TO.PDF | Callout | 438.32 KB | 2013-11-07 | Transocean Callout from TREX-130491 |
TREX-130529.PDF | Exhibit | 201.12 MB | 2013-11-07 | BP 2011 Annual Report |
TREX-130529.236.1.US.PDF | Callout | 430.40 KB | 2013-11-07 | U.S. Callout from TREX-130529 |
TREX-130539.PDF | Exhibit | 974.85 KB | 2013-11-07 | Press Release BP Pledges $100 Million to UK-Led Universities to Create Industry-Changing Materials |
TREX-130539.1.PDF | Callout | 383.40 KB | 2013-11-07 | U.S. Callout from TREX-130539 |
TREX-130539.2.1.US.PDF | Callout | 429.34 KB | 2013-11-07 | U.S. Callout from TREX-130539 |
TREX-130544.429.1.US.PDF | Callout | 332.66 KB | 2013-11-07 | U.S. Callout from TREX-130544 |
TREX-130544.444.PDF | Callout | 364.20 KB | 2013-11-07 | BP Callout from TREX-130544 |
TREX-130544.444.1.US.PDF | Callout | 340.94 KB | 2013-11-07 | U.S. Callout from TREX-130544 |
TREX-130713.PDF | Exhibit | 18.29 MB | 2013-11-07 | Excerpts from book: Miller, Internal Flow Systems, ISBN 0-947711-77-5, 1990 |
TREX-130713.35.1.US.PDF | Callout | 280.98 KB | 2013-11-07 | U.S. Callout from TREX-130713 |
TREX-130713.36.1.US.PDF | Callout | 303.79 KB | 2013-11-07 | U.S. Callout from TREX-130713 |
TREX-130713.44.1.US.PDF | Callout | 385.31 KB | 2013-11-07 | U.S. Callout from TREX-130713 |
TREX-130713.46.1.US.PDF | Callout | 318.92 KB | 2013-11-07 | U.S. Callout from TREX-130713 |
TREX-130815.xls | Exhibit | 4.32 MB | 2013-11-07 | Core Lab Reservoir Optimization Volatile Oil Resevoir Fluid Study for BP Report No: 36126-53-5010068379 |
TREX-130863.PDF | Exhibit | 121.18 KB | 2013-11-07 | October 26, 2009 e-mail from David Schott to Brad Simpson, Walt Bozeman and Tanner Gansert, Subject: RE: Macondo Core |
TREX-130863.1.1.US.PDF | Callout | 589.22 KB | 2013-11-07 | U.S. Callout from TREX-130863 |
TREX-130963.PDF | Exhibit | 3.65 MB | 2013-11-07 | Intertek/Westport Multi-Stage Separator Test (Final Report) |
TREX-140331N.PDF | Exhibit | 8.23 MB | 2013-11-07 | Native Version of TREX-140331 |
TREX-140331N.1.1.BP.PDF | Callout | 284.91 KB | 2013-11-07 | BP Callout from TREX-140331 |
TREX-140342.ppt | Exhibit | 189.00 KB | 2013-11-07 | Email from G. Wulf - B. Kirton re Junk Shot Peer Assist (w/ attachment) |
TREX-140342.1.1.PSC.PDF | Callout | 193.54 KB | 2013-11-07 | PSC Callout from TREX-140342 |
TREX-140342.2.1.PSC.PDF | Callout | 261.99 KB | 2013-11-07 | PSC Callout from TREX-140342 |
TREX-140563.PDF | Exhibit | 205.11 KB | 2013-11-07 | Email from I. Sneddon to K. Girlinghouse, J. MacKay, et al. re Dual Ram Transition & Hydrotest Spool with 18 3/4 15K Flanges |
TREX-140563.4.1.TO_TREX-140563.5.1.TO_SPLITSCREEN.PDF | Callout | 1.22 MB | 2013-11-07 | Transocean Split-Screen Callout from TREX-140563 |
TREX-140563.4.2N.TO_D-26007_SPLITSCREEN.PDF | Callout | 2.58 MB | 2013-11-07 | Transocean Split-Screen Callout from TREX-140563 and D-26007 |
TREX-140563.4.2N.TO_TREX-140563.5.2N.TO_SPLITSCREEN.PDF | Callout | 3.96 MB | 2013-11-07 | Transocean Split-Screen Callout from TREX-140563 |
TREX-140700.ppt | Exhibit | 1.08 MB | 2013-11-07 | Email from P. O'Bryan to D. Chmura re: Riser on Horizon Lower Stack |
TREX-140700.12.1.BP.PDF | Callout | 280.28 KB | 2013-11-07 | BP Callout from TREX-140700 |
TREX-140783.rar | Exhibit | 1.27 GB | 2013-11-07 | ROV Video Footage |
TREX-140793.zip | Exhibit | 4.31 MB | 2013-11-07 | Assessment of Observed Erosion within Kinked Riser |
TREX-140797N.PDF | Exhibit | 5.82 MB | 2013-11-07 | Native Version of TREX-140797 |
TREX-140797N.1.PDF | Callout | 274.09 KB | 2013-11-07 | BP Callout from TREX-140797N |
TREX-140797N.11.PDF | Callout | 383.73 KB | 2013-11-07 | BP Callout from TREX-140797N |
TREX-140797N.4.PDF | Callout | 325.24 KB | 2013-11-07 | BP Callout from TREX-140797N |
TREX-140863.ppt | Exhibit | 774.00 KB | 2013-11-07 | Merrill emails a presentation titled Preliminary Reservoir Model MC252." Slide 4 notes a UPVC of 6 msips. Importance here is that Merrill was putting presentations using 6 msips on the same day that others (including Kelly) were trying to raise the UPVC values" |
TREX-140863.5.1.BP.PDF | Callout | 290.00 KB | 2013-11-07 | BP Callout from TREX-140863 |
TREX-140863.5.2.BP.PDF | Callout | 272.96 KB | 2013-11-07 | BP Callout from TREX-140863 |
TREX-140884.zip | Exhibit | 2.95 MB | 2013-11-07 | Welaptega Kinked Riser Inspection and Analysis |
TREX-140914.PDF | Exhibit | 74.90 KB | 2013-11-07 | Interface Meeting Notes (a.m.) |
TREX-140914.2.1.BP.PDF | Callout | 294.81 KB | 2013-11-07 | BP Callout from TREX-140914 |
TREX-140914.2.3.TO.PDF | Callout | 311.86 KB | 2013-11-07 | Transocean Callout from TREX-140914 |
TREX-141081.xls | Exhibit | 206.50 KB | 2013-11-07 | West Engineering Report DDII BOP |
TREX-141081.150.2.BP.PDF | Callout | 286.87 KB | 2013-11-07 | BP Callout from TREX-141081 |
TREX-141081.150.4.BP.PDF | Callout | 300.28 KB | 2013-11-07 | BP Callout from TREX-141081 |
TREX-141081.2.BP.PDF | Callout | 8.07 KB | 2013-11-07 | BP Callout from TREX-141081 |
TREX-141081.5.1.BP.PDF | Callout | 281.23 KB | 2013-11-07 | BP Callout from TREX-141081 |
TREX-141123.PDF | Exhibit | 3.09 MB | 2013-11-07 | LMRP Removal |
TREX-141123.1.1.TO.PDF | Callout | 375.73 KB | 2013-11-07 | Transocean Callout from TREX-141123 |
TREX-141123.12.1.TO.PDF | Callout | 356.67 KB | 2013-11-07 | Transocean Callout from TREX-141123 |
TREX-141204N.PDF | Exhibit | 2.45 KB | 2013-11-07 | Native Version of TREX-141204 |
TREX-141207N.PDF | Exhibit | 2.44 KB | 2013-11-07 | Native Version of TREX-141207 |
TREX-141219N.PDF | Exhibit | 2.46 KB | 2013-11-07 | Native Version of TREX-141219 |
TREX-141231N.PDF | Exhibit | 2.45 KB | 2013-11-07 | Native Version of TREX-141231 |
TREX-141235N.PDF | Exhibit | 2.47 KB | 2013-11-07 | Native Version of TREX-141235 |
TREX-141245.PDF | Exhibit | 49.71 KB | 2013-11-07 | Email from A. Inglis to R. Dudley and K. Wells re: Deepwater Horizon slide pack - May 31, 2010 |
TREX-141245.1.1.BP.PDF | Callout | 299.97 KB | 2013-11-07 | BP Callout from TREX-141245 |
TREX-141245.2.1.BP.PDF | Callout | 333.18 KB | 2013-11-07 | BP Callout from TREX-141245 |
TREX-141302.PDF | Exhibit | 399.77 MB | 2013-11-07 | BP, GoM Oil Spill Response Plan |
TREX-141394.PDF | Exhibit | 10.48 MB | 2013-11-07 | Macondo Well Integrity Test |
TREX-141394.12.PDF | Callout | 335.61 KB | 2013-11-07 | BP Callout from TREX-141394 |
TREX-141394.12.1.US.PDF | Callout | 413.48 KB | 2013-11-07 | U.S. Callout from TREX-141394 |
TREX-141394.12.2.US.PDF | Callout | 369.80 KB | 2013-11-07 | U.S. Callout from TREX-141394 |
TREX-141758.PDF | Exhibit | 363.44 KB | 2013-11-07 | Email from D. Sullivan re: End" of Day Update" |
TREX-141784.PDF | Exhibit | 68.67 KB | 2013-11-07 | Email from W. Lehr to M. McNutt re: Re: Flow Rate Calculation |
TREX-141784.1.1.BP.PDF | Callout | 309.90 KB | 2013-11-07 | BP Callout from TREX-141784 |
TREX-142242.241.3.BP.PDF | Callout | 339.69 KB | 2013-11-07 | BP Callout from TREX-142242 |
TREX-142243.PDF | Exhibit | 336.49 MB | 2013-11-07 | ExxonMobil OSRP |
TREX-142243.268.2.BP.PDF | Callout | 382.70 KB | 2013-11-07 | BP Callout from TREX-142243 |
TREX-142244.PDF | Exhibit | 74.97 MB | 2013-11-07 | Shell OSRP |
TREX-142244.1.1.BP.PDF | Callout | 289.24 KB | 2013-11-07 | BP Callout from TREX-142244 |
TREX-142244.65.1.BP.PDF | Callout | 345.59 KB | 2013-11-07 | BP Callout from TREX-142244 |
TREX-142325.PDF | Exhibit | 21.00 KB | 2013-11-07 | Email from Merrill to Hsieh |
TREX-142325.1.1.BP.PDF | Callout | 262.22 KB | 2013-11-07 | BP Callout from TREX-142325 |
TREX-142325.1.3.BP.PDF | Callout | 271.62 KB | 2013-11-07 | BP Callout from TREX-142325 |
TREX-142347N.PDF | Exhibit | 1.26 MB | 2013-11-07 | Native Version of TREX-142347 |
TREX-142347N.2.8.BP.PDF | Callout | 373.27 KB | 2013-11-07 | BP Callout from TREX-142347 |
TREX-142361.PDF | Exhibit | 129.18 KB | 2013-11-07 | Email from P. Tooms to W. McDonald, K. Wells, et al. re: Re: Discussion |
TREX-142364.1.BP.PDF | Callout | 61.47 KB | 2013-11-07 | BP Callout from TREX-142364 |
TREX-142399.rar | Exhibit | 68.32 KB | 2013-11-07 | Email from J. Wellings to A. Frazelle, K. Cantrell, et al. re: BOP on BP Peer Review - Update on Closeout Of Issues |
TREX-142399.1.1.BP.PDF | Callout | 278.32 KB | 2013-11-07 | BP Callout from TREX-142399 |
TREX-142399.3.1.TO.PDF | Callout | 340.48 KB | 2013-11-07 | Transocean Callout from TREX-142399 |
TREX-142399N.10.1.BP.PDF | Callout | 342.38 KB | 2013-11-07 | BP Callout from TREX-142399 |
TREX-142399N.10.BP.PDF | Callout | 395.56 KB | 2013-11-07 | BP Callout from TREX-142399 |
TREX-142399N.5.1.BP.PDF | Callout | 339.98 KB | 2013-11-07 | BP Callout from TREX-142399 |
TREX-142399N.5.BP.PDF | Callout | 366.25 KB | 2013-11-07 | BP Callout from TREX-142399 |
TREX-142399N.9.1.BP.PDF | Callout | 381.96 KB | 2013-11-07 | BP Callout from TREX-142399 |
TREX-142399N.9.BP.PDF | Callout | 441.96 KB | 2013-11-07 | BP Callout from TREX-142399 |
TREX-142420.PDF | Exhibit | 1.91 MB | 2013-11-07 | USG Well Integrity/Shut-In Discussion Presentation |
TREX-142592.PDF | Exhibit | 2.76 MB | 2013-11-07 | Email from J. Shaughnessy to T. Burns re: Rig Info |
TREX-142677.PDF | Exhibit | 1.70 MB | 2013-11-07 | USG Well Integrity/Shut-In Discussion Presentation |
TREX-142679.PDF | Exhibit | 69.50 KB | 2013-11-07 | Email from P. Tooms to R. Lynch, T. Hill, et al. re: RE: possible test of rupture disk integrity |
TREX-142679.1.1.BP.PDF | Callout | 305.20 KB | 2013-11-07 | BP Callout from TREX-142679 |
TREX-142679.2.1.BP.PDF | Callout | 300.57 KB | 2013-11-07 | BP Callout from TREX-142679 |
TREX-142692.rar | Exhibit | 4.24 MB | 2013-11-07 | Email from Trevor Hill to Derek Wapman re RE: Photos and videos |
TREX-142700.PDF | Exhibit | 348.80 KB | 2013-11-07 | Email from D. Suttles to A. Inglis and J. Dupree re: Ltr to Admiral Landry re: Top Kill Operation |
TREX-142700.1.1.PSC.PDF | Callout | 184.91 KB | 2013-11-07 | PSC Callout from TREX-142700 |
TREX-142700.2.1.PSC.PDF | Callout | 228.17 KB | 2013-11-07 | PSC Callout from TREX-142700 |
TREX-142700.2.1.TO.PDF | Callout | 309.58 KB | 2013-11-07 | Transocean Callout from TREX-142700 |
TREX-142700.2.3.TO.PDF | Callout | 355.06 KB | 2013-11-07 | Transocean Callout from TREX-142700 |
TREX-142700.2.BP.PDF | Callout | 87.21 KB | 2013-11-07 | BP Callout from TREX-142700 |
TREX-142700.3.1.TO.PDF | Callout | 377.63 KB | 2013-11-07 | Transocean Callout from TREX-142700 |
TREX-142710.rar | Exhibit | 3.39 MB | 2013-11-07 | Email from J. Caldwell to N. Maguire re: Slide Pack |
TREX-142710N.PDF | Exhibit | 14.73 MB | 2013-11-07 | Native Version of TREX-142710 |
TREX-142710N.1.PDF | Callout | 255.30 KB | 2013-11-07 | BP Callout from TREX-142710N |
TREX-142710N.13.PDF | Callout | 301.38 KB | 2013-11-07 | BP Callout from TREX-142710N |
TREX-142710N.4.PDF | Callout | 342.24 KB | 2013-11-07 | BP Callout from TREX-142710N |
TREX-142710N.6.PDF | Callout | 355.94 KB | 2013-11-07 | BP Callout from TREX-142710N |
TREX-142819.3.PSC.PDF | Callout | 301.95 KB | 2013-11-07 | PSC Callout from TREX-142819 |
TREX-142819N.PDF | Exhibit | 3.69 MB | 2013-11-07 | Native Version of TREX-142819 |
TREX-142819N.1.PDF | Callout | 252.21 KB | 2013-11-07 | BP Callout from TREX-142819N |
TREX-142819N.11.PDF | Callout | 334.91 KB | 2013-11-07 | BP Callout from TREX-142819N |
TREX-142819N.2.PDF | Callout | 295.16 KB | 2013-11-07 | BP Callout from TREX-142819N |
TREX-142819N.8.PDF | Callout | 324.01 KB | 2013-11-07 | BP Callout from TREX-142819N |
TREX-142819N.9.PDF | Callout | 327.41 KB | 2013-11-07 | BP Callout from TREX-142819N |
TREX-142886.PDF | Exhibit | 24.78 KB | 2013-11-07 | Email from S. Tieszen to T. Hill, K. Wells, et al. re: FW: |
TREX-142916.PDF | Exhibit | 140.95 KB | 2013-11-07 | Email from M. Mazzella to J. Dupree and M. Patteson re: Junk-shot Peer Review |
TREX-142916.1.1.PSC.PDF | Callout | 181.21 KB | 2013-11-07 | PSC Callout from TREX-142916 |
TREX-142916.2.1.PSC.PDF | Callout | 206.14 KB | 2013-11-07 | PSC Callout from TREX-142916 |
TREX-142916.2.2.PSC.PDF | Callout | 214.01 KB | 2013-11-07 | PSC Callout from TREX-142916 |
TREX-142994.PDF | Exhibit | 375.30 KB | 2013-11-07 | Dc4756.pdf |
TREX-142994.1.BP.PDF | Callout | 30.35 KB | 2013-11-07 | BP Callout from TREX-142994 |
TREX-143042.rar | Exhibit | 5.09 KB | 2013-11-07 | Email from C. Breidenthal to T. Smith, J. Schwebel, et al. re: RE: 06/22/10: Offsite Activities at Oil States Brief |
TREX-143045.rar | Exhibit | 538.37 KB | 2013-11-07 | Email from T. Smith to C. Grounds, L. Owen, et al. re: FW: Thanks For the Good Work BOP on BOP and Capping Stack Team |
TREX-143045.1.1.TO.PDF | Callout | 521.53 KB | 2013-11-07 | Transocean Callout from TREX-143045 |
TREX-143045.5N.1.TO.PDF | Callout | 338.47 KB | 2013-11-07 | Transocean Callout from TREX-143045 |
TREX-143108.PDF | Exhibit | 488.11 KB | 2013-11-07 | Riser |
TREX-143132.PDF | Exhibit | 1.14 MB | 2013-11-07 | Starboard BSR |
TREX-143133.PDF | Exhibit | 505.25 KB | 2013-11-07 | Holes in Kinked Riser |
TREX-143145.PDF | Exhibit | 1.09 MB | 2013-11-07 | CSR |
TREX-143175.PDF | Exhibit | 512.48 KB | 2013-11-07 | CSR |
TREX-143198.PDF | Exhibit | 1.08 MB | 2013-11-07 | Upper Annular Elements |
TREX-143201.PDF | Exhibit | 1.15 MB | 2013-11-07 | BSR |
TREX-144128.PDF | Exhibit | 1.90 MB | 2013-11-07 | T B Ryerson, R Camilli, J D Kessler, E B Kujawinski, C M Reddy, D L Valentine, E Atlas, D R Blake, J de Gouw, S Meinardi, D D Parish, J Peischi, J S Seewald and C Warneke, Chemical data quantify Deepwater Horizon hydrocarbon flow rate and environmental distribution |
TREX-144128.1.PDF | Callout | 283.58 KB | 2013-11-07 | BP Callout from TREX-144128 |
TREX-144256.PDF | Exhibit | 4.01 KB | 2013-11-07 | BHP Billiton Petroleum (Americas) Inc. Oil SPill Response Plan |
TREX-144408.ppt | Exhibit | 694.50 KB | 2013-11-07 | MC 252 - Isolation Valve Readiness RevB.ppt |
TREX-144408N.1.1.TO.PDF | Callout | 389.55 KB | 2013-11-07 | Transocean Callout from TREX-144408 |
TREX-144408N.2.1.TO.PDF | Callout | 429.04 KB | 2013-11-07 | Transocean Callout from TREX-144408 |
TREX-144408N.8.1.TO.PDF | Callout | 457.05 KB | 2013-11-07 | Transocean Callout from TREX-144408 |
TREX-144470N.PDF | Callout | 616.47 KB | 2013-11-07 | Native Version of TREX-144470 |
TREX-144470N.1.1.BP.PDF | Callout | 288.78 KB | 2013-11-07 | BP Callout from TREX-144470N |
TREX-144580.PDF | Exhibit | 24.56 MB | 2013-11-07 | Jaeger, J., Cook, N.G., Zimmerman,R., Fundamentals of Rock Mechanics (2007) |
TREX-144580.1.PDF | Callout | 1.09 MB | 2013-11-07 | BP Callout from TREX-144580 |
TREX-144625.PDF | Exhibit | 340.79 KB | 2013-11-07 | Viking Poseidon |
TREX-144642.PDF | Exhibit | 64.88 KB | 2013-11-07 | Email from SCHU to S. Tieszen et al. re RE: Flow |
TREX-144662.PDF | Exhibit | 1.90 MB | 2013-11-07 | Email from M. McNutt to F. Shaffer re RE: Pending devlopments |
TREX-144730.PDF | Exhibit | 50.63 KB | 2013-11-07 | Email from T. Allen to JHL re FW: BP Houston Update |
TREX-144745.PDF | Exhibit | 274.18 MB | 2013-11-07 | GoM Drilling, Completions and Interventions - Technical Assurance Report Well Cap with Triple-Ram Stack |
TREX-144745.28.1.TO.PDF | Callout | 172.55 KB | 2013-11-07 | Transocean Callout from TREX-144745 |
TREX-144753.PDF | Exhibit | 58.30 KB | 2013-11-07 | Email from V. Labson to M. Mcnutt re Mass Balance Update |
TREX-144757.PDF | Exhibit | 2.73 MB | 2013-11-07 | Email from M. McNutt to M. Lee-Ashley et al. re Re: RE: |
TREX-144757.1.1.BP.PDF | Callout | 345.77 KB | 2013-11-07 | BP Callout from TREX-144757 |
TREX-144757.1.4.BP.PDF | Callout | 328.62 KB | 2013-11-07 | BP Callout from TREX-144757 |
TREX-144767.PDF | Exhibit | 2.17 MB | 2013-11-07 | Email chain re analysis of Macondo seismic data |
TREX-144811.PDF | Callout | 57.66 KB | 2013-11-07 | Email from D. Payton to chris.barker@noaa.gov et al. re Re: Leak rate guestimate |
TREX-144811.2.1.BP.PDF | Callout | 335.02 KB | 2013-11-07 | BP Callout from TREX-144811 |
TREX-144820.PDF | Exhibit | 1.42 MB | 2013-11-07 | PresComm - Flow Rate - Amount and Fate of Oil |
TREX-144820.3.1.US.PDF | Callout | 332.48 KB | 2013-11-07 | U.S. Callout from TREX-144820 |
TREX-144836.PDF | Exhibit | 72.87 KB | 2013-11-07 | Email from D. Helton to J. Ewald re Re: DOUG -- AP -- Can you help? |
TREX-144843.PDF | Exhibit | 4.80 MB | 2013-11-07 | Email from T. Rediger to S. Chu et al. re Fw: 16 may Science Meeting Slide Pack |
TREX-144843.1.1.TO.PDF | Callout | 346.58 KB | 2013-11-07 | Transocean Callout from TREX-144843 |
TREX-144843.10.2.TO.PDF | Callout | 409.13 KB | 2013-11-07 | Transocean Callout from TREX-144843 |
TREX-144847.PDF | Exhibit | 70.89 KB | 2013-11-07 | Email from T. Hunter to S. Tieszen re Re: Flow |
TREX-144847.1.2.BP.PDF | Callout | 309.13 KB | 2013-11-07 | BP Callout from TREX-144847 |
TREX-144847.2.1.BP.PDF | Callout | 8.55 KB | 2013-11-07 | BP Callout from TREX-144847 |
TREX-144872.PDF | Exhibit | 666.85 KB | 2013-11-07 | Snap_05_19_10 07_53_04.jpg |
TREX-144925.PDF | Exhibit | 1.12 MB | 2013-11-07 | Email from S. Tieszen to T. Aselage et al. re FW: 1 June Report from Houston |
TREX-144951.PDF | Exhibit | 431.65 KB | 2013-11-07 | Email from A. Olsen to E. Redd re Stack on Stack DD II plans |
TREX-144951.1.1.TO.PDF | Callout | 410.42 KB | 2013-11-07 | Transocean Callout from TREX-144951 |
TREX-144952.PDF | Exhibit | 126.56 KB | 2013-11-07 | Email from I. Sneddon to R. Turlak et al. re RE: Request for Information - Wild Well Control |
TREX-144952.2.1.BP.PDF | Callout | 290.95 KB | 2013-11-07 | BP Callout from TREX-144952 |
TREX-144952.2.2.BP.PDF | Callout | 282.67 KB | 2013-11-07 | BP Callout from TREX-144952 |
TREX-144954.PDF | Exhibit | 52.22 KB | 2013-11-07 | Email from A. Olsen to R. Turlak et al. re FW: BOP on BOP Plan |
TREX-144954.1.1.TO.PDF | Callout | 410.56 KB | 2013-11-07 | Transocean Callout from TREX-144954 |
TREX-144961.1.1.TO.PDF | Callout | 458.87 KB | 2013-11-07 | Transocean Callout from TREX-144961 |
TREX-144963.PDF | Exhibit | 508.82 KB | 2013-11-07 | Email from A. Olsen to I. Sneddon et al. re Project plan for Stack on Stack with DD II |
TREX-144963.1.1.TO.PDF | Callout | 407.41 KB | 2013-11-07 | Transocean Callout from TREX-144963 |
TREX-144963.2.1.TO.PDF | Callout | 548.72 KB | 2013-11-07 | Transocean Callout from TREX-144963 |
TREX-144985.PDF | Exhibit | 965.71 KB | 2013-11-07 | Email from C. Roberts to R. Simpson et al. re RE: Well Capping Team Schedule |
TREX-144985.1.1.TO.PDF | Callout | 369.83 KB | 2013-11-07 | Transocean Callout from TREX-144985 |
TREX-144985.2.1.TO.PDF | Callout | 447.13 KB | 2013-11-07 | Transocean Callout from TREX-144985 |
TREX-144986.PDF | Exhibit | 221.13 KB | 2013-11-07 | Email from A. Olsen to D. Cameron et al. re Planning for Triple Cap Stack and BOP outlet |
TREX-144986.1.1.TO.PDF | Callout | 388.18 KB | 2013-11-07 | Transocean Callout from TREX-144986 |
TREX-144986.2.1.TO.PDF | Callout | 544.78 KB | 2013-11-07 | Transocean Callout from TREX-144986 |
TREX-144989.PDF | Exhibit | 1.43 MB | 2013-11-07 | Email from I. Sneddon to E. Redd et al. re FW: Revised LMRP Removal Procedure DWH |
TREX-144989.1.3.BP.PDF | Callout | 299.07 KB | 2013-11-07 | BP Callout from TREX-144989 |
TREX-144989.1.9.BP.PDF | Callout | 298.38 KB | 2013-11-07 | BP Callout from TREX-144989 |
TREX-145008.PDF | Exhibit | 91.89 KB | 2013-11-07 | Email from R. Turlak to A. Olsen re RE: Re: IMPORTANT - Priority for Completion of BOP Work on the DDII |
TREX-145008.1.1.TO.PDF | Callout | 479.44 KB | 2013-11-07 | Transocean Callout from TREX-145008 |
TREX-145021.PDF | Exhibit | 42.15 KB | 2013-11-07 | Email from A. Olsen to I. Sneddon et al. re Conference call this AM to discuss DD2 BOP venting |
TREX-145021.1.1.TO.PDF | Callout | 412.92 KB | 2013-11-07 | Transocean Callout from TREX-145021 |
TREX-145038.PDF | Exhibit | 76.18 KB | 2013-11-07 | Email from I. Sneddon to E. Redd et al. re FW: 3:30 Mtg on BOP Venting moved to 5:30 |
TREX-145038.1.1.TO.PDF | Callout | 349.47 KB | 2013-11-07 | Transocean Callout from TREX-145038 |
TREX-145038.1.2.TO.PDF | Callout | 355.54 KB | 2013-11-07 | Transocean Callout from TREX-145038 |
TREX-145038.3.TO.PDF | Callout | 17.80 KB | 2013-11-07 | Transocean Callout from TREX-145038 |
TREX-145074.PDF | Exhibit | 50.60 KB | 2013-11-07 | Email from D. Munoz to S. Newman et al. re RE: Operational Concerns re Shutting in the Well |
TREX-145079.PDF | Callout | 52.08 KB | 2013-11-07 | Email from A. Olsen to E. Redd re Status BOP's etc. |
TREX-145079.1.3.BP.PDF | Callout | 302.51 KB | 2013-11-07 | BP Callout from TREX-145079 |
TREX-145079.1.4.BP.PDF | Callout | 329.20 KB | 2013-11-07 | BP Callout from TREX-145079 |
TREX-145112.PDF | Exhibit | 110.46 KB | 2013-11-07 | Email from J. MacKay to G. Kidd et al. re DDII BOP Modifications Workscope |
TREX-145113.PDF | Exhibit | 6.91 MB | 2013-11-07 | Copied Note Book - 2010 |
TREX-145113.57.1.TO.PDF | Callout | 334.29 KB | 2013-11-07 | Transocean Callout from TREX-145113 |
TREX-145113.61.1.TO.PDF | Callout | 396.57 KB | 2013-11-07 | Transocean Callout from TREX-145113 |
TREX-145296.PDF | Exhibit | 22.19 KB | 2013-11-07 | 18166.00-18183.10.jpg |
TREX-150040.xlsx | Exhibit | 13.43 KB | 2013-11-07 | Email from Kurt Mix to Mike Zanghi, et al re RE: Final Wellbore Collapse Prediction Macando, including string and attaching spreadsheet re IPR Curves (attachment printed from native file) |
TREX-150088.PDF | Exhibit | 221.00 KB | 2013-11-07 | Email from Kate Baker to Stephen Wilson, et al. re National Labs and DOE investigation of alternative flow paths |
TREX-150106.PDF | Exhibit | 120.77 KB | 2013-11-07 | Email from Doug Suttles to Toby Odone, et al. re Seeking confirmation of 5,000 barrel a day figure for amount of oil being captured by new tube |
TREX-150106.1.1.TO.PDF | Callout | 382.88 KB | 2013-11-07 | Transocean Callout from TREX-150106 |
TREX-150110.PDF | Exhibit | 33.05 KB | 2013-11-07 | Email from Jasper Peijs to Doug Suttles, et al. re Worst Case Scenario Data |
TREX-150110.1.1.TO.PDF | Callout | 388.01 KB | 2013-11-07 | Transocean Callout from TREX-150110 |
TREX-150129.zip | Exhibit | 4.05 MB | 2013-11-07 | Email from Kelly McAughan to Jay Thorseth, et al re: First, thanks / Second, Tam for 1-3??, attaching excel files Macondo TAM Chapter 5.xls" and "MACONDO_TAM_parts_2-3-4.xls" |
TREX-150303.PDF | Exhibit | 238.48 KB | 2013-11-07 | Email from Scott Perfect to Rob Sharpe, et al re well questions |
TREX-150306N.PDF | Exhibit | 7.86 MB | 2013-11-07 | Native Version of TREX-150306 |
TREX-150306N.1.PDF | Callout | 265.11 KB | 2013-11-07 | BP Callout from TREX-150306N |
TREX-150306N.4.PDF | Callout | 295.38 KB | 2013-11-07 | BP Callout from TREX-150306N |
TREX-150306N.6.PDF | Callout | 304.85 KB | 2013-11-07 | BP Callout from TREX-150306N |
TREX-150307N.wmv | Exhibit | 3.03 MB | 2013-11-07 | Native Version of TREX-150307 |
TREX-160004.PDF | Exhibit | 2.16 MB | 2013-11-07 | Email - From: Michael Leary To: Patrick O'Bryan - Subject: FW: BP Macondo Well Control Modeling 043010.ppt, with attachment |
TREX-160140.PDF | Exhibit | 175.60 KB | 2013-11-07 | Manual: Capping Procedure, Deepwater Enterprise, Version #6, May 2, 2010 |